2 Open Violations 1 unresolved · 1 paperwork only▸
ECB03/20/2025AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING ACTIVE CONSTRUCTION SITE, I OBSERVED AT EXPOSURE #3 WOOD FRAMING STRUCTURE PAINTED IN BLACK, UPON REVIEW OF THE APPROVED DOCUMENTS ON SITE IT SHOWED NO ADDITIO$2K due
ECB03/20/2025BC 3309.1 AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING ACTIVE CONSTRUCTION SITE, I OBSERVED AT EXPOSURE #2 PLYWOOD INSTALL ON EXTERIOR OF BUILDING AND WAITING TO INSTALL FACADE AND THERE WERE NO OVERHEADHearing held — result not yet published$2K proposed
Two stories - detached, small or mid-size · 3,100 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.