HPD04/23/2026§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION METAL GATE ERECTED AT SOFFIT UNDER STAIRS AT NORTH AT PUBLIC HALL, 1st STORY
HPD11/16/2025§ 27-2005 ADM CODE PROVIDE AN UNLOCKABLE SLIDE BOLT OR HOOK ON METAL GATE THAT DOES ALLOW RE-ENTRY (FROM NORTH YARD TO 1ST STORY PUBLIC HALL) AT PUBLIC HALL, 1st STORY
HPD11/16/2025§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PANIC BAR INSTALLED AT METAL GATE THAT DOES NOT ALLOW RE-ENTRY (FROM NORTH YARD TO 1ST STORY PUBLIC HALL) AT PUBLIC HALL, 1st STORY
HPD06/10/2021HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD02/19/2021HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD01/25/2021§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ,, IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD01/06/2021§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD01/06/2021§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
HPD01/06/2021§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD01/06/2021§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD07/27/2020§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
HPD07/19/2017§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING AIR CONDITIONER BRAKETS AT 4 WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD07/19/2017§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER INTERCOME SYSTEM IN THE KITCHEN LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST