← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1738 UNIVERSITY AVENUE
BRONX · BIN 2008835
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R7-1Zoning
67,000 sfGross Floor Area
73Units
LL97 CoveredRent Stabilized58 Active Violations 57 unresolved · 1 paperwork only 4 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: 1738 U LLC · 15,008 sf lot · 4.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1738 U LLC3p · 1 filing · 7 docs
Floor 1Installation of heavy duty sidewalk shed4p · 1 filing · 2 docs
CellarDenali Management6p · 2 filings · 7 docs
Basement1738 U LLC1p · 1 filing · 7 docs
Site & exteriorDenali Management2p · 1 filing · 3 docs
Filed — no permit issuedDenali Management11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1738 U LLC707/08/2026
AF&G Realty Associates603/21/2026
Broad Hill First Realty Associates103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2022$11.5M—1738 UNIVERSITI AVE. BRONX LLC → 1738 U LLC$171/sf building
10/01/2020$9.8M—1738 ASSOCIATES, LLC → 1738 UNIVERSITI AVE. BRONX LLC$147/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates104/03/2025
Anthony Cucich Architect101/29/2025
HC Engineering105/16/2024
Jose M. Landauro, P.E.101/15/2024
New York & Company110/20/2023
Mje Professional Services106/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH Cornerstone Design103/21/2026
Designworks Consultant103/21/2026
S R Solar Design203/21/2026
Right Way Services NYC203/21/2026
New York & Company103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockledge ScaffoldGeneral Contractor303/21/2026
S & J Construction ServiceScaffold303/21/2026
B.P. ElectricElectrical203/21/2026
MRC ConstructionGeneral Contractor107/08/2026
Zeeshan ContractorGeneral Contractor103/21/2026
Kingstone General ConstructionGeneral Contractor107/08/2026
Emes Solarspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244104/03/2025
Anthony Cucich Architect6081101/29/2025
Beyond Arch3600105/16/2024
Jose M. Landauro3500101/15/2024
New York Engineering Associates851110/20/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/22/2026
Observed 6 story occupied residential bldg with sidewalk shed erected at exp 1. A time of inspection, sidewalk shed was not maintained as per code.…
ECB violation · open
10/22/2026
Observed 6 story occupied residential building with sidewalk shed erected at exp 1. A time of inspection, upon research of dept filings it was…
ECB violation · open
10/22/2026
Observed 6 story occupied residential building with sidewalk shed erected at exp 1. A time of inspection, i observed no required information panel…
ECB violation · open
10/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
255 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offEmes Solar05/21/2026
DOB NOWGeneral ConstructionSigned-offKingstone General Construction05/11/2026
DOB NOWFoundationPermit IssuedMRC Construction02/04/2025
DOB NOWSidewalk ShedPermit IssuedS & J Construction Service01/17/2024
DOB NOWBoiler EquipmentPermit IssuedG. Bauer11/03/2023
BISOTISSUEDZeeshan Contractor04/18/2012
BISEQISSUEDRockledge Scaffold12/22/2008
BISEQISSUEDRockledge Scaffold01/09/2008
BISEQISSUEDRockledge Scaffold01/24/2007
BISEQISSUEDRockledge Scaffold01/05/2005
4 projects · most recent 07/02/2025
Boiler Controls General Wiring
FiledStatusContractorScope
07/02/2025CompleteB.P. Electric—
09/13/2023Permit IssuedCounty Electrical Contractor IBoiler Controls
06/06/2023Permit IssuedRichard Neu—
09/02/2022CompleteOM ElectricGeneral Wiring
1 project · most recent 04/03/2025
FiledStatusContractorScope
04/03/2025Signed-offEmes Solar—
1 project · most recent 06/06/2023
Sidewalk Shed
FiledStatusContractorScope
06/06/2023Permit IssuedS & J Construction ServiceSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/28/2026FinalANTHONY CUCICHprogress
12/27/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
12/27/2024FinalNARESH MAHANGUprogress
12/27/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
12/27/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
12/27/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/18/2024Tenant Protection Plan ComplianceANTHONY CUCICHspecial
01/15/2024Air barrier - visual inspectionJOSE LANDAUROenergy_progress
01/15/2024Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
01/15/2024MasonryJOSE LANDAUROspecial
01/15/2024Energy Code Compliance InspectionsJOSE LANDAUROprogress
12/13/2023Tenant Protection Plan Compliance—special
11/30/2023FinalJOSE LANDAUROprogress
09/28/2023Heating SystemsLOUIS ARENAspecial
09/28/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account