← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1739 GRAND AVENUE
BRONX · BIN 2131095
💬 Discuss this project
2022Year Built
7Stories
D1Building Class
R7-1Zoning
26,428 sfGross Floor Area
31Units
Rent Stabilized45 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Grand Avenue Investment · 5,577 sf lot · 4.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsNew 7-story Residential Building2 filings
RoofNew 7-story Residential Building4p · 5 filings · 20 docs
BulkheadNew 7-story Residential Building10p · 3 filings · 20 docs
Floor 7New 7-story Residential Building4p · 3 filings · 20 docs
Floor 6New 7-story Residential Building5p · 3 filings · 20 docs
Floor 5New 7-story Residential Building6p · 3 filings · 20 docs
Floor 4New 7-story Residential Building5p · 3 filings · 20 docs
Floor 3New 7-story Residential Building2p · 3 filings · 20 docs
Floor 2New 7-story Residential Building5p · 3 filings · 20 docs
Floor 1New curb cut for new building5p · 5 filings · 20 docs
Site & exterior85 Herkimer Development LLC6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Affordablelivingny2907/08/2026
85 Herkimer Development1007/08/2026
1739 GA203/21/2026
Grand Avenue Investment103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2021$1.5M—1731-1741 GRAND AVENUE LLC → GRAND AVENUE INVEST LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE1003/27/2025
Versatile Engineering703/20/2023
Paul Perdek, Professional Engineering903/06/2023
RSLN Architecture203/06/2023
Yaker Engineering104/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RSLN Architecture2003/21/2026
AE Design Solution1803/21/2026
BAC Developers Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1407/08/2026
Edward BuildersGeneral Contractor1207/08/2026
M&D Fire SprinklerFire Protection207/08/2026
PipestylistsPlumbing207/08/2026
Lens ElectricElectrical103/22/2026
Design N SafetyScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681403/27/2025
Building Lifecycle
07/21/2026
Class 2: failed to provide required access to the elevator machine room for a DOB complaint inspection. At the time of inspection, the machine room…
ECB violation · open
06/20/2025
Signed off — Alteration
NEW CURB CUT IN CONJUNCTION WITH NEW BUILDING APPLICATION 210178190
X00633990-I1
04/10/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM WITH VENTILATION SYSTEM AND ASSOCIATED DUCT AND PIPING IN CONJUNCTION WITH NEW BUILDING APPLICATION#210178190. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00345062-I1
04/03/2025
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
04/03/2025
Special inspection requirement — Duct leakage testing, insulation and design
Soorjbally Harilall
124 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offM&D Fire Sprinkler11/07/2024
DOB NOWCurb CutSigned-offDelric Construction Co10/30/2024
DOB NOWMechanical SystemsSigned-offDelric Construction Co01/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/21/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/21/2023
DOB NOWPlumbingSigned-offT & T Plumbing06/09/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/08/2023
DOB NOWMechanical SystemsSigned-offDelric Construction Co05/20/2023
DOB NOWStructuralSigned-offDelric Construction Co05/08/2023
DOB NOWSprinklersSigned-offM&D Fire Sprinkler03/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/27/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/27/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/20/2022
DOB NOWStructuralSigned-offDelric Construction Co06/03/2022
DOB NOWPlumbingSigned-offT & T Plumbing05/28/2022
DOB NOWFoundationSigned-offDelric Construction Co05/16/2022
DOB NOWSupport of ExcavationSigned-offDelric Construction Co03/25/2022
DOB NOWConstruction FenceSigned-offDesign N Safety04/15/2019
BIS—ISSUEDEdward Builders07/12/2024
BIS—ISSUEDEdward Builders03/21/2024
BIS—ISSUEDEdward Builders12/29/2023
BIS—ISSUEDEdward Builders10/24/2023
BIS—ISSUEDEdward Builders09/19/2022
BIS—ISSUEDEdward Builders09/19/2022
4 projects · most recent 05/15/2023
General Wiring
FiledStatusContractorScope
05/15/2023CompleteLens Electric—
11/18/2022CompleteStar Electrical Contractors—
09/21/2022CompleteLens ElectricGeneral Wiring
06/15/2022CompleteSolas Electrical—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/21/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
04/03/2025Shutoff dampersSoorjbally Harilallenergy_progress
04/03/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
04/03/2025HVAC insulation and sealing Soorjbally Harilallenergy_progress
04/03/2025Duct leakage testing, insulation and designSoorjbally Harilallenergy_progress
04/03/2025Maintenance informationSoorjbally Harilallenergy_progress
04/03/2025HVAC and service water heating system controls Soorjbally Harilallenergy_progress
04/03/2025Mechanical SystemsSOORJBALLY HARILALLspecial
04/03/2025Heating SystemsSOORJBALLY HARILALLspecial
04/03/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/03/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
04/03/2025FinalSoorjbally Harilallprogress
04/03/2025HVAC and service water heating equipment Soorjbally Harilallenergy_progress
02/20/2025Duct leakage testing, insulation and designSoorjbally Harilallenergy_progress
02/20/2025FinalSoorjbally Harilallprogress
02/20/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
02/20/2025Mechanical SystemsSOORJBALLY HARILALLspecial
02/20/2025Heating SystemsSOORJBALLY HARILALLspecial
02/20/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/20/2025HVAC insulation and sealing Soorjbally Harilallenergy_progress
02/20/2025HVAC and service water heating system controls Soorjbally Harilallenergy_progress
02/20/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
02/20/2025Shutoff dampersSoorjbally Harilallenergy_progress
02/20/2025HVAC and service water heating equipment Soorjbally Harilallenergy_progress
02/20/2025Maintenance informationSoorjbally Harilallenergy_progress
04/08/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 105.
263 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account