← Back
BuildNYC
Two family frame
1739 TAYLOR AVENUE
BRONX · BIN 2042627
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5Zoning
2,212 sfGross Floor Area
2Units
4 Active Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family frame · 2,375 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarPlumbing work to legalize existing shower2p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF Services Crop303/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNF Services Crop303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Berger Quality ElectricalElectrical103/22/2026
Zaman ConstructionGeneral Contractor107/08/2026
Centurion Solar EnergyGeneral Contractor105/10/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616203/07/2022
Building Lifecycle
05/22/2026
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
05/09/2024
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
02/22/2023
Signed off — Alteration
ALT-GC FILING TO ADDRESS ECB VIOLATION # 34958209H REMOVE ALL ILLEGAL FULL HEIGHT PORTIONS, GAS STOVE @ CELLAR.NO CHANGE IN EGRESS, USE & OCCUPANCY. PLUMBING WILL BE FILED SEPARATELY
X00648037-I1
02/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZaman Construction04/07/2022
BISOTISSUEDCenturion Solar Energy05/10/2021
1 project · most recent 01/08/2022
Gas Water/Sanitary
FiledStatusContractorScope
01/08/2022——Gas, Water/Sanitary
1 project · most recent 01/26/2021
FiledStatusContractorScope
01/26/2021CompleteBerger Quality Electrical—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/24/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/07/2022Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
03/02/2022Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account