← Back
BuildNYC
Cape Cod
174-40 PIDGEON MEADOW ROAD
QUEENS · BIN 4126283
💬 Discuss this project
1945Year Built
1.67Stories
A0Building Class
R2AZoning
1,211 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Cape Cod · 4,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation1 filing · 9 docs
Attic9p · 1 filing · 20 docs
Floor 214p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
Site & exteriorConstruction fence installation1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2023$930K—Private party → Private party$768/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chris Kim Engineering107/23/2025
Arc Consulting Engineers411/10/2024
Peter Cho Architects211/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H&Z Building NY1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunation Solar SystemsGeneral Contractor303/21/2026
Grand Work ConstructionGeneral Contractor207/08/2026
Grand Work ConstructionScaffold204/09/2026
Berger Quality Electrical ConElectrical103/22/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Barun8842107/23/2025
Arc Consulting Engineers4083411/10/2024
NKM Engineering6244111/14/2023
Building Lifecycle
04/20/2026
Closed: Bc notice of order to stop work immediately due to applicant withdraw from the project # Q00962652.I1. Please kindly contact the borough…
DOB violation · closed on the city's record
04/07/2026
Signed off — Alteration
PARTIAL EXTENSION OF EXISTING BUILDING AS PER PLAN, INSTALL PARTITION WALL, NEW BATHS ROOM AND PLUMBING WORKS.NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00962652-I1
04/07/2026
Closed: The department of buildings order you to stop work immediately due to applicant withdraw from the project # Q00962652. Please kindly contact the…
DOB violation · closed on the city's record
03/16/2026
Bc notice of order to stop work immediately due to applicant withdraw from the project # Q00962652.I1. Please kindly contact the borough…
DOB violation · closed
03/11/2026
Signed off — Alteration
INSTALL CONSTRUCTION FENCE. NO CHANGE IN USE, OCCUPANCY & EGRESS.
Q00918690-I1
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunation Solar Systems08/08/2025
DOB NOWGeneral ConstructionSigned-offGrand Work Construction12/29/2023
DOB NOWConstruction FenceSigned-offGrand Work Construction12/29/2023
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building12/05/2023
DOB NOWGeneral ConstructionSigned-offGrand Work Construction11/03/2023
DOB NOWConstruction FenceSigned-offGrand Work Construction08/15/2023
4 projects · most recent 07/11/2025
General Wiring
FiledStatusContractorScope
07/11/2025CompleteGallant Electrical Construction—
11/13/2024CompleteA Electrical Main ServiceGeneral Wiring
05/23/2024Permit IssuedBerger Quality Electrical Con—
03/16/2024CompleteA Electrical Main Service—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/16/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
07/16/2025FinalCHRIS KIMprogress
07/16/2025Energy Code Compliance InspectionsCHRIS KIMprogress
07/16/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
07/16/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
11/27/2024Interior lighting powerJAN PEREZenergy_progress
11/27/2024Lighting controlsJAN PEREZenergy_progress
11/27/2024Lighting in dwelling unitsJAN PEREZenergy_progress
11/27/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
11/27/2024Structural Stability – Alterations of existing buildingsJAN PEREZspecial
11/27/2024Energy Code Compliance InspectionsJAN PEREZprogress
11/27/2024Fire-Resistance Rated ConstructionJAN PEREZprogress
11/27/2024Fenestration air leakageJAN PEREZenergy_progress
11/10/2024Interior lighting powerJAN PEREZenergy_progress
11/10/2024Lighting in dwelling unitsJAN PEREZenergy_progress
11/10/2024Lighting controlsJAN PEREZenergy_progress
11/10/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
11/10/2024Structural Stability – Alterations of existing buildingsJAN PEREZspecial
11/10/2024Energy Code Compliance InspectionsJAN PEREZprogress
11/10/2024Fire-Resistance Rated ConstructionJAN PEREZprogress
11/10/2024Fenestration air leakageJAN PEREZenergy_progress
08/01/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/01/2024HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
08/01/2024HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
08/01/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 34.
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account