← Back
BuildNYC
Two stories - detached, small or mid-size
174-53 PIDGEON MEADOW ROAD
QUEENS · BIN 4126260
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
1,496 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar electric generating system installation12p · 2 filings · 20 docs
Floor 2Residential Enlargement2p · 1 filing · 20 docs
Floor 1Residential Enlargement3p · 1 filing · 20 docs
CellarResidential Enlargement3p · 1 filing · 20 docs
Site & exteriorResidential Enlargement23p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2024$1.1M—Private party → Private party$715/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Agt Architecture509/09/2026
Alan Yang Architecture105/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Indesign Studio603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NTF ManagementScaffold207/08/2026
NTF ManagementGeneral Contractor104/09/2026
Leading Green Energyspecialty_contractor110/31/2026
P.S.I. MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect5513409/09/2026
Alan Yang Architecture9490105/12/2026
Building Lifecycle
11/04/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01398760-I1-SL
10/30/2026
Permit issued — Solar
Q01398760-I1-SL
10/22/2026
Signed off — Alteration CO
PROPOSE VERTICAL & HORIZONTAL ENLARGEMENT FOR EXISTING ONE-FAMILY RESIDENCE.OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q01180224-S3
10/22/2026
Signed off — Alteration CO
PROPOSE VERTICAL & HORIZONTAL ENLARGEMENT FOR EXISTING ONE-FAMILY RESIDENCE.OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q01180224-S1
09/09/2026
Filed — Alteration CO
PROPOSE VERTICAL & HORIZONTAL ENLARGEMENT FOR EXISTING ONE-FAMILY RESIDENCE.OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q01180224-P2
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedLeading Green Energy10/30/2026
DOB NOWPlumbingSigned-offP.S.I. Mechanical09/05/2025
DOB NOWConstruction FenceSigned-offNTF Management03/04/2025
DOB NOWConstruction FenceSigned-offNTF Management02/27/2025
1 project · most recent 09/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/09/2026Signed-offP.S.I. MechanicalGas, Storm, Water/Sanitary
2 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026CompleteKJK ElectricGeneral Wiring
05/06/2026CompleteKwong Ming Electric—
1 project · most recent 09/09/2026
Wood
FiledStatusContractorScope
09/09/2026Signed-offP.S.I. MechanicalWood
1 project · most recent 09/09/2026
Fence
FiledStatusContractorScope
09/09/2026Signed-offP.S.I. MechanicalFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/09/2026Fenestration air leakageGE TANGenergy_progress
09/09/2026MeteringGE TANGenergy_progress
09/09/2026Interior lighting powerGE TANGenergy_progress
09/09/2026Permanent certificateGE TANGenergy_progress
09/09/2026Insulation placement and R valuesGE TANGenergy_progress
09/09/2026Concrete - Cast-In-PlaceDEZHANG FANGspecial
09/09/2026Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
09/09/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/09/2026MasonryDEZHANG FANGspecial
09/09/2026Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
09/09/2026Structural Steel - High Strength BoltingDEZHANG FANGspecial
09/09/2026Energy Code Compliance InspectionsGE TANGprogress
09/09/2026FinalGE TANGprogress
09/09/2026Fire-Resistance Rated ConstructionGE TANGprogress
09/09/2026Footing and FoundationGE TANGprogress
09/09/2026Structural Wood FrameGE TANGprogress
09/09/2026Fenestration and door U-factor and product ratingsGE TANGenergy_progress
09/09/2026Air barrier - visual inspectionGE TANGenergy_progress
09/09/2026Maintenance informationGE TANGenergy_progress
09/09/2026Fenestration areasGE TANGenergy_progress
05/23/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/23/2026Energy Code Compliance InspectionsGE TANGprogress
05/23/2026HVAC-R and service water piping design and insulationGE TANGenergy_progress
05/23/2026HVAC-R and service water heating equipmentGE TANGenergy_progress
05/23/2026HVAC-R and service water heating system controlsGE TANGenergy_progress
Latest 25 of 28.
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account