← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
174 BAY 29 STREET
BROOKLYN · BIN 3392146
💬 Discuss this project
2006Year Built
3Stories
RMBuilding Class
R5Zoning
7,640 sfGross Floor Area
5Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,880 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
174 BAY 29TH PROP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKW ENGINEERING, P.C.404/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing407/08/2026
T & MQ GROUP INCGeneral Contractor303/21/2026
JIAN YANG YUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKW ENGINEERING, P.C.1856404/13/2025
Building Lifecycle
All (37)Filed (4)Permit Issued (2)Signed Off (2)Violation (14)Inspection (2)Special Inspection (13)
05/08/2026
Violation issued (HPD, closed)
A
06/13/2025
Violation issued (HPD, closed)
A
05/20/2025
Signed off — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-I1
05/19/2025
Signed off — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-S1
05/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2025
Special inspection requirement — Interior lighting power
James Wai
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
04/14/2025
Special inspection requirement — Final
James Wai
04/14/2025
Special inspection requirement — Lighting controls
James Wai
04/13/2025
Filed — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-P2
04/04/2025
Special inspection requirement — Lighting controls
James Wai
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
04/04/2025
Special inspection requirement — Final
James Wai
04/04/2025
Special inspection requirement — Interior lighting power
James Wai
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2025
Filed — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-P1
02/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
12/31/2024
Permit issued — General Construction
B01156655-I1-GC
12/30/2024
Permit issued — Plumbing
B01156655-S1-PL
12/19/2024
Filed — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-I1
12/19/2024
Filed — Alteration
Renovate existing medical office to dental office. Remove and install plumbing fixtures. No change in egress, occupancy or use is involved under this application.
B01156655-S1
04/17/2024
Violation issued (HPD, closed)
A
03/31/2023
Violation issued (HPD, closed)
A
03/09/2022
Violation issued (HPD, closed)
A
03/09/2022
Violation issued (HPD, closed)
I
10/26/2018
Violation issued (HPD, closed)
I
07/02/2009
Violation issued (ECB, closed)
Construction
09/20/1999
Violation issued (ECB, closed)
Quality of Life
08/17/1999
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
08/17/1999
Violation issued (ECB, closed)
Quality of Life
08/17/1999
Violation issued (ECB, closed)
Quality of Life
08/17/1999
Violation issued (ECB, closed)
Quality of Life
08/17/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offT & MQ GROUP INC12/31/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/30/2024
BISPLISSUEDACCURATE MECHANICAL INC03/14/2007
BISEQISSUEDA K PLUS SERVICES INC10/27/2006
BIS—ISSUEDA K PLUS SERVICES INC10/27/2006
BIS—ISSUEDA K PLUS SERVICES INC02/27/2006
BISEQISSUEDA K PLUS SERVICES INC02/27/2006
BISEQISSUEDA K PLUS SERVICES INC10/14/2005
BIS—ISSUEDA K PLUS SERVICES INC10/14/2005
BISPLISSUEDACCURATE MECHANICAL INC10/11/2005
BISEQISSUEDA K PLUS SERVICES INC04/26/2005
BIS—ISSUEDA K PLUS SERVICES INC04/26/2005
BIS—ISSUEDSTATEWIDE DEMOLITION CORP.04/11/2005
BIS—ISSUEDSTATEWIDE DEMOLITION CORP.04/11/2005
BISEQISSUEDSTATEWIDE DEMOLITION CORP.04/11/2005
BISPLISSUEDHEADQUARTERS MECH CORP02/07/2000
BISOTISSUEDLEON CONSTRUCTION01/14/2000
BISOTISSUEDLEON CONSTRUCTION09/04/1996
1 project · most recent 01/11/2025
General Wiring
FiledStatusContractorScope
01/11/2025CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/14/2025Interior lighting powerJames Waienergy_progress
04/14/2025Tenant Protection Plan ComplianceJames Waispecial
04/14/2025Fire-Resistant Penetrations and JointsJames Waispecial
04/14/2025Energy Code Compliance InspectionsJames Waiprogress
04/14/2025FinalJames Waiprogress
04/14/2025Lighting controlsJames Waienergy_progress
04/04/2025Lighting controlsJames Waienergy_progress
04/04/2025Fire-Resistant Penetrations and JointsJames Waispecial
04/04/2025Tenant Protection Plan ComplianceJames Waispecial
04/04/2025Energy Code Compliance InspectionsJames Waiprogress
04/04/2025FinalJames Waiprogress
04/04/2025Interior lighting powerJames Waienergy_progress
02/18/2025Tenant Protection Plan ComplianceJames Waispecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01156655-I1Request digital key ↗
08/23/2026B01156655-S1Request digital key ↗
08/23/2026B01156655-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/24/2009320065353Open ↗
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01156655-P2Open ↗
09/02/2026B01156655-P2Open ↗
08/30/2026B01156655-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01156655-P2Open ↗
08/23/2026B01156655-I1Open ↗
08/23/2026B01156655-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B01156655-P2Open ↗
09/02/2026B01156655-P2Open ↗
08/30/2026B01156655-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/24/2009320065353Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/24/2009320065353Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/24/2009320065353Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/24/2009320065353Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/24/2009320065353Open ↗