← Back
Zoned residential, not Manhattan
174 EAGLE STREET
BROOKLYN · BIN 3063963
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6BZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 174 EAGLE ST LLC · 2,500 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction62p · 1 filing · 20 docs
PenthouseUnder Construction58p · 1 filing · 20 docs
Floor 4Under Construction59p · 1 filing · 20 docs
Floor 3Under Construction59p · 1 filing · 20 docs
Floor 2Under Construction58p · 1 filing · 20 docs
Floor 1Under Construction59p · 1 filing · 20 docs
CellarUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
174 EAGLE ST LLC103/22/2026
A&O DEVELOPMENT NY CORP103/22/2026
AO DEVELOPMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2024$1.9M—Private party → 174 EAGLE ST LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC803/21/2026
DALTON103/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENWOOD MONITORING LLCGeneral Contractor1207/19/2026
A.A.Z ENTERPRISES CORPGeneral Contractor207/08/2026
C & A ELECTRICAL CORPElectrical103/22/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor104/09/2026
PLBG P & H INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811808/05/2026
Building Lifecycle
All (131)Filed (22)Permit Issued (15)Signed Off (9)Violation (4)Inspection (7)Objection (44)Special Inspection (30)
08/05/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-A4
07/30/2026
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S1
07/17/2026
Permit issued — General Construction
B01011349-I1-GC
07/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FRANZ SEBORGA
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
FRANZ SEBORGA
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
07/07/2026
Special inspection requirement — Sprinkler Systems
FRANZ SEBORGA
07/07/2026
Special inspection requirement — Post-installed Anchors
FRANZ SEBORGA
07/07/2026
Special inspection requirement — Maintenance information
FRANZ SEBORGA
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
FRANZ SEBORGA
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANZ SEBORGA
06/22/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Scope
05/27/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-A3
04/17/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Scope
04/08/2026
Special inspection requirement — Lighting in dwelling units
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Protection of exposed foundation insulation
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Fenestration areas
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Lighting controls
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Maintenance information
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Air barrier — testing
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Masonry
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Subgrade Inspections
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Fenestration air leakage
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Electrical motors and elevators
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Preliminary
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Insulation placement and R values
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Metering
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Interior lighting power
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Air barrier - visual inspection
FRANZ SEBORGA
04/08/2026
Special inspection requirement — Exterior lighting power
FRANZ SEBORGA
04/01/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-A2
02/12/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-A1
02/05/2026
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S3
02/04/2026
Objection resolved — Addressed
02/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2026
Objection resolved — Addressed
01/21/2026
Objection raised — Scope
01/20/2026
Objection raised — Cost
01/09/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-P8
01/08/2026
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S6
01/08/2026
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-P9
01/08/2026
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S4
01/08/2026
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S5
01/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01188034-I1
12/05/2025
Signed off — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-S2
11/17/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Scope
11/05/2025
Filed — New Building
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01011349-P5
11/03/2025
Permit issued — Mechanical Systems
B01011349-S3-MS
09/02/2025
Permit issued — Construction Fence
B01011349-S2-FN
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC07/17/2026
DOB NOWMechanical SystemsSigned-offGREENWOOD MONITORING LLC11/03/2025
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC09/02/2025
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC07/16/2025
DOB NOWSupported ScaffoldSigned-offGREENWOOD MONITORING LLC06/04/2025
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC03/04/2025
DOB NOWPlumbingSigned-offBRUCHE MECHANICAL NY LLC03/03/2025
DOB NOWPlumbingSigned-offPLBG P & H INC03/03/2025
DOB NOWStructuralPermit IssuedGREENWOOD MONITORING LLC10/31/2024
DOB NOWSupport of ExcavationSigned-offGREENWOOD MONITORING LLC10/31/2024
DOB NOWFoundationSigned-offGREENWOOD MONITORING LLC10/31/2024
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC10/31/2024
DOB NOWFull DemolitionSigned-offA.A.Z ENTERPRISES CORP09/27/2024
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC08/22/2024
DOB NOWConstruction FenceSigned-offA.A.Z ENTERPRISES CORP07/12/2024
1 project · most recent 08/05/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedGREENWOOD MONITORING LLCAir Conditioning Systems, Heating Systems
Cooling
Cooper & Hunter CH−HPR12−230VO 12,000 BTU · Heat Pump Outdoor ×2
CH−HPR36M−230VO 36,000 BTU · Heat Pump Outdoor ×2
CH−HVHP36M−230VO 36,000 BTU · Heat Pump Outdoor ×2
CH-HPR36M-230VO,CH-HPR36M-230VO 12,000 BTU · Heat Pump Outdoor ×10
CH-RHP12-230VO, CH-RVHP36M-230VO 36,000 BTU · Split System ×10
CH-RVHP36M-230VO,CH-RHP12-230VO 36,000 BTU · Heat Pump Outdoor ×10
Heating
Cooper & Hunter CH−HPR12−230VO 12,000 BTU · Heat Pump Outdoor ×2
CH−HPR36M−230VO 37,000 BTU · Heat Pump Outdoor ×2
CH−HVHP36M−230VO 37,000 BTU · Heat Pump Outdoor ×2
CH-HPR36M-230VO,CH-HPR36M-230VO 12,000 BTU · Heat Pump Outdoor ×10
CH-RHP12-230VO, CH-RVHP36M-230VO 37,000 BTU · Split System ×10
CH-RVHP36M-230VO,CH-RHP12-230VO 37,000 BTU · Heat Pump Outdoor ×10
1 project · most recent 08/05/2026
Sprinkler System
FiledStatusContractorScope
08/05/2026Signed-offPLBG P & H INCSprinkler System
1 project · most recent 08/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offPLBG P & H INCStorm, Water/Sanitary
3 projects · most recent 02/18/2026
General Wiring
FiledStatusContractorScope
02/18/2026CompleteKENNETH FISK ELECTRIC CORGeneral Wiring
03/21/2025Permit IssuedC & A ELECTRICAL CORPGeneral Wiring
02/28/2025CompleteRICHARD NEU—
1 project · most recent 08/05/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/05/2026Permit IssuedGREENWOOD MONITORING LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/07/2026Sprinkler SystemsFRANZ SEBORGAspecial
07/07/2026Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
07/07/2026Post-installed AnchorsFRANZ SEBORGAspecial
07/07/2026Energy Code Compliance InspectionsFRANZ SEBORGAprogress
07/07/2026HVAC-R and service water heating equipmentFRANZ SEBORGAenergy_progress
07/07/2026Maintenance informationFRANZ SEBORGAenergy_progress
07/07/2026HVAC-R and service water heating system controlsFRANZ SEBORGAenergy_progress
07/07/2026HVAC-R and service water piping design and insulationFRANZ SEBORGAenergy_progress
07/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFRANZ SEBORGAspecial
04/08/2026Subgrade InspectionsFRANZ SEBORGAspecial
04/08/2026MasonryFRANZ SEBORGAspecial
04/08/2026Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
04/08/2026Concrete - Cast-In-PlaceFRANZ SEBORGAspecial
04/08/2026Insulation placement and R valuesFRANZ SEBORGAenergy_progress
04/08/2026Fenestration air leakageFRANZ SEBORGAenergy_progress
04/08/2026Protection of exposed foundation insulationFRANZ SEBORGAenergy_progress
04/08/2026Interior lighting powerFRANZ SEBORGAenergy_progress
04/08/2026Air barrier - visual inspectionFRANZ SEBORGAenergy_progress
04/08/2026MeteringFRANZ SEBORGAenergy_progress
04/08/2026PreliminaryFRANZ SEBORGAprogress
04/08/2026Fire-Resistance Rated ConstructionFRANZ SEBORGAprogress
04/08/2026Energy Code Compliance InspectionsFRANZ SEBORGAprogress
04/08/2026Exterior lighting powerFRANZ SEBORGAenergy_progress
04/08/2026Air barrier — testing FRANZ SEBORGAenergy_progress
04/08/2026Lighting in dwelling unitsFRANZ SEBORGAenergy_progress
Latest 25 of 150.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/25/2026B01046563-I1Request digital key ↗
08/22/2026B01188034-I1Request digital key ↗
08/21/2026B01229510-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/22/2025340910820Open ↗
05/31/2024340910820Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/31/2024340910820Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram7
08/17/2026B01011349-A4Open ↗
08/13/2026B01011349-P8Open ↗
08/13/2026B01011349-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/17/2026B01011349-A4Open ↗
08/13/2026B01011349-P2Open ↗
08/13/2026B01011349-P8Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature39
09/01/2026B01011349-P8Open ↗
09/01/2026B01011349-P8Open ↗
08/28/2026B01011349-A3Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/22/2026B01188034-I1Open ↗
08/21/2026B01229510-I1Open ↗
08/17/2026B01011349-A3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B01011349-P8Open ↗
08/28/2026B01011349-A3Open ↗
08/26/2026B01011349-S1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/31/2024340910820Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/31/2024340910820Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B01011349-I1Open ↗
08/13/2026B01011349-P3Open ↗
08/13/2026B01011349-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSewer Cut-Off1
08/13/2026B01046563-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01046563-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01046563-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01046563-I1Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist7
08/17/2026B01011349-A4Open ↗
08/13/2026B01011349-P2Open ↗
08/13/2026B01011349-I1Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/20/2024340910820Open ↗
▸BISSTREET TREE CHECKLIST1
05/31/2024340910820Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01011349-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01011349-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026B01046563-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01046563-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/17/2026340910820Open ↗
02/17/2026340910820Open ↗
02/17/2026340910820Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/17/2026340910820Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
09/20/2024340910820Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/31/2024340910820Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/31/2024340910820Open ↗
▸Other Documents29
▸DOB NOWProperty Ownership Certification8
08/17/2026B01011349-P2Open ↗
08/17/2026B01011349-I1Open ↗
08/17/2026B01011349-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial7
08/17/2026B01011349-A4Open ↗
08/13/2026B01011349-P5Open ↗
08/13/2026B01011349-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/17/2026B01011349-A4Open ↗
08/13/2026B01011349-I1Open ↗
08/13/2026B01011349-P5Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
09/20/2024340910820Open ↗
09/20/2024340910820Open ↗
09/20/2024340910820Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01046563-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01046563-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01011349-S6Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01046563-I1Open ↗