← Back
Walk-up cooperative
Cobble Heights
174 PACIFIC STREET · BIN 3003067
💬 Discuss this project
1889Year Built
4Stories
C6Building Class
R6Zoning
32,052 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Walk-up cooperative · Owner of record: COBBLE HEIGHTS OWNERS CORP. · 16,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof2p · 1 filing · 5 docs
Floor 35p · 2 filings · 20 docs
Floor 2
Floor 1
Mezzanine1p · 1 filing · 17 docs
Basement2p · 1 filing · 4 docs
6 jobs · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedA.C.M. ELEC'L CONTR'G CORGeneral Wiring
03/29/2024CompleteVERTEX ELECTRIC CORP.General Wiring
10/24/2022CompleteS.A.L. ELECTRIC CO INC.—
08/04/2022CompleteS.A.L. ELECTRIC CO INC.—
07/02/2021CompleteEVERBRIGHT ELECTRIC INCGeneral Wiring
08/05/2020CompleteTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (106)Filed (18)Permit Issued (15)Signed Off (12)Violation (28)Inspection (5)Objection (10)Special Inspection (18)
02/25/2025
Signed off — Alteration
Exterior facade repairs including select brick masonry repairs as shown on drawings and as specified. No change to use, egress, or occupancy.
B00975180-I1
12/31/2024
Signed off — Alteration
B01071479-I1
09/12/2024
Permit issued — General Construction
B01071479-I1-GC
07/31/2024
Filed — Alteration
B01071479-I1
05/20/2024
Signed off — Alteration
New ceiling work in Apt#1. Existing drop ceiling below ductwork to be repaired. New lighting. Existing ducts and AC unit to be replaced. No change of use, egress or occupancy.
B00984577-I1
03/25/2024
Permit issued — General Construction
B00975180-I1-GC
03/11/2024
Permit issued — General Construction
B00984577-I1-GC-CX
02/14/2024
Filed — Alteration
Exterior facade repairs including select brick masonry repairs as shown on drawings and as specified. No change to use, egress, or occupancy.
B00975180-I1
02/13/2024
Permit issued — General Construction
B00984577-I1-GC-CX
01/29/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Mechanical
01/11/2024
Objection raised — Admin
01/11/2024
Objection raised — Zoning
01/11/2024
Objection raised — Scope
01/05/2024
Filed — Alteration
New ceiling work in Apt#1. Existing drop ceiling below ductwork to be repaired. New lighting. Existing ducts and AC unit to be replaced. No change of use, egress or occupancy.
B00984577-I1
01/03/2024
Special inspection requirement — Mechanical Systems
Luis Pichardo
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
01/03/2024
Special inspection requirement — Final
RONALD VILLANO
01/03/2024
Special inspection requirement — Lighting in dwelling units
RONALD VILLANO
12/11/2023
Signed off — Alteration
B00916066-I1
12/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Nicholas Melone
12/11/2023
Special inspection requirement — Masonry
Nicholas Melone
12/11/2023
Special inspection requirement — Final
Nicholas Melone
12/04/2023
Signed off — Alteration
General Construction at the Basement, 1st and Mezzanine of a residential unit (1D) in an existing 4 story, multiple dwelling it includes new partitions, finishes. & Plumbing. No change in use egress or occupancy.
B00821431-I1
12/04/2023
Signed off — Alteration
B00821368-I1
10/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2023
Special inspection requirement — Energy Code Compliance Inspections
ROBERTA WOELFLING
10/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
10/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERTA WOELFLING
10/18/2023
Filed — Alteration
General Construction at the Basement, 1st and Mezzanine of a residential unit (1D) in an existing 4 story, multiple dwelling it includes new partitions, finishes. & Plumbing. No change in use egress or occupancy.
B00821431-P1
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2023
Permit issued — Mechanical Systems
B00916066-I1-MS
08/11/2023
Filed — Alteration
B00916066-I1
07/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2023
Permit issued — Plumbing
B00821431-I1-PL
06/01/2023
Permit issued — General Construction
B00821368-I1-GC
02/21/2023
Objection raised — Admin
02/21/2023
Objection resolved — Addressed
02/15/2023
Filed — Alteration
General Construction at the Basement, 1st and Mezzanine of a residential unit (1D) in an existing 4 story, multiple dwelling it includes new partitions, finishes. & Plumbing. No change in use egress or occupancy.
B00821431-I1
02/15/2023
Filed — Alteration
B00821368-I1
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
B00399338-I1
01/20/2022
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
B00399338-P3
12/21/2021
Signed off — Alteration
B00399382-I1
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2021
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
B00399338-P2
10/26/2021
Permit issued — Mechanical Systems
B00399382-I1-MS
07/23/2021
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION
B00444263-I1
07/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
07/19/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION
B00444263-P1
07/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
06/04/2021
Signed off — Alteration
B00381247-I1
06/03/2021
Signed off — Alteration
B00381248-I1
05/18/2021
Permit issued — Plumbing
B00444263-I1-PL
05/12/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION
B00444263-I1
Latest 60 of 106 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COBBLE HEIGTTHS OWNERS3207/08/2026
COBBLE HEIGHTS OWNERS2503/22/2026
COBBLE HILL OWNERS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC BUILDING CONSULTANTS1003/21/2026
AE DESIGN SOLUTION403/21/2026
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
BOYD CONSULTING203/21/2026
METRO DESIGN CONSULTANTS INC203/21/2026
ARINNITY NYC103/21/2026
J CALLAHAN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor807/08/2026
ART DECO ENTERPRISES INCGeneral Contractor603/21/2026
HAKKA CONTRACTING, INCGeneral Contractor303/21/2026
BROCHI CONSTRUCTION LLCGeneral Contractor307/08/2026
CITY DECK NEW YORK LLCGeneral Contractor303/21/2026
DEMARI SERVICES INCGeneral Contractor203/21/2026
JOANN PRICEElectrical103/21/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
JOSEPH ALOIAElectrical103/21/2026
VERTEX ELECTRIC CORP.Electrical103/22/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ALKLEM PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342107/31/2024
COMPLY BUILDING GROUP8622107/31/2024
MELONE ARCHITECTS2944102/14/2024
BUILDTECH ENGINEERING6369101/05/2024
VINCENT J. LIOTTA P. E.1974410/18/2023
THE VILNITS GROUP LLC1223207/19/2021
CHARLES G MICHEL ENGINEER2871109/28/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCITY DECK NEW YORK LLC09/12/2024
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC03/25/2024
DOB NOWGeneral ConstructionSigned-offART DECO ENTERPRISES INC03/11/2024
DOB NOWGeneral ConstructionSigned-offART DECO ENTERPRISES INC02/13/2024
DOB NOWMechanical SystemsSigned-offBROCHI CONSTRUCTION LLC08/21/2023
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP06/02/2023
DOB NOWGeneral ConstructionSigned-offBROCHI CONSTRUCTION LLC06/01/2023
DOB NOWMechanical SystemsSigned-offHAKKA CONTRACTING, INC10/26/2021
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP05/18/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO04/06/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2021
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/02/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC08/12/2020
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC08/12/2020
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC07/16/2019
BISOTISSUEDARTUR KALAJ03/30/2021
BISOTISSUEDHAKKA CONTRACTING, INC12/24/2020
BISOTISSUEDHENRY RESTORATION LTD10/22/2020
BISEQISSUEDSPRING SCAFFOLDING LLC08/12/2020
BISPLISSUEDRRP PLUMBING CORP11/17/2016
BISOTISSUEDBRIGHTON CONTRACTORS INC11/07/2016
BISPLISSUEDPAT SEMENTA P & H CO INC11/19/2015
BISPLISSUEDA.M.N. CORPORATION12/24/2014
BISOTISSUEDCASTLES UNLIMITED LLC12/15/2014
BISPLISSUEDPAT SEMENTA P & H CO INC03/17/2014
BISPLISSUEDPAT SEMENTA P & H CO INC05/30/2012
BISOTISSUEDGERARDO FAJARDO05/30/2012
BISMHISSUEDEXCEL BUILDERS & RENOVATO09/23/2011
BISOTISSUEDEXCEL BUILDERS & RENOVATO03/17/2011
BISOTISSUEDEXCEL BUILDERS & RENOVATO11/18/2010
BISOTISSUEDEXCEL BUILDERS & RENOVATO11/18/2010
BISPLISSUEDRANDAZZO PLBG AND HTG,LLC10/19/2010
BISOTISSUEDM2 CONTRACTING CORP09/01/2010
BISOTISSUEDBEYOND PERFECT PAINTING I02/15/2010
BISPLISSUEDARIEL SERVICES INC06/10/2008
BISOTISSUEDRERFECT RENOVATION05/19/2008
BISPLISSUEDKARL'S PLBG & HTG CO INC03/23/2006
BISOTISSUEDBETTER BUILT LLC02/10/2006
BISPLISSUEDMARTIN PLG & HTG INC03/03/2003
BISOTISSUEDKAM CHEUNG CONST INC02/12/2003
+ 5 more permits on file
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/03/2024Mechanical SystemsLuis Pichardospecial
01/03/2024Fire-Resistant Penetrations and JointsLuis Pichardospecial
01/03/2024FinalRONALD VILLANOprogress
01/03/2024Lighting in dwelling unitsRONALD VILLANOenergy_progress
12/11/2023Tenant Protection Plan ComplianceNicholas Melonespecial
12/11/2023MasonryNicholas Melonespecial
12/11/2023FinalNicholas Meloneprogress
10/19/2023Energy Code Compliance InspectionsROBERTA WOELFLINGprogress
10/19/2023Fire-Resistant Penetrations and JointsVincent Liottaspecial
10/19/2023HVAC-R and service water piping design and insulationROBERTA WOELFLINGenergy_progress
07/20/2021Fire-Resistant Penetrations and JointsILYA VILNITSspecial
07/19/2021Fire-Resistant Penetrations and JointsILYA VILNITSspecial
08/06/2019HVAC insulation and sealing LOUIS ARENAenergy_progress
08/06/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
08/06/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
08/05/2019HVAC insulation and sealing LOUIS ARENAenergy_progress
08/05/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
08/05/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Plumbing8
09/02/2026B00186506-I1Request digital key ↗
09/02/2026B00399338-P2Request digital key ↗
09/02/2026B00399338-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch7
08/27/2026B00821368-I1Request digital key ↗
08/27/2026B00821431-P1Request digital key ↗
08/27/2026B00916066-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00399382-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00381248-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00381247-I1Request digital key ↗
▸Applications & Permits50
▸BISWORK PERMIT APPLICATION20
03/30/2021340789588Open ↗
12/24/2020340766308Open ↗
10/22/2020340736644Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit15
08/13/2026B00916066-I1Open ↗
08/13/2026B01071479-I1Open ↗
08/13/2026B00399338-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
03/11/2021340736644Open ↗
01/12/2021340766308Open ↗
01/11/2021340736644Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/23/2017321468069Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026B00821368-I1Open ↗
08/27/2026B00821431-P1Open ↗
08/27/2026B00821431-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/19/2017321468069Open ↗
10/20/2016321468069Open ↗
08/09/2016320431261Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B00821431-I1Open ↗
08/31/2026B00821431-I1Open ↗
08/28/2026B00186506-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026B00821431-I1Open ↗
08/30/2026B00444263-P1Open ↗
08/27/2026B00984577-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/23/2020340789588Open ↗
10/13/2020340736644Open ↗
09/29/2020340766308Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/11/2021340736644Open ↗
09/29/2020340766308Open ↗
08/11/2020340754302Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/11/2020340754302Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/13/2008310140399Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/11/2020340754302Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/13/2008310140399Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
02/23/2012320431261Open ↗
10/19/2010320227312Open ↗
08/30/2010320206424Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
05/02/2011320227312Open ↗
04/01/2011320206424Open ↗
02/15/2011320206424Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/20/2016321468069Open ↗
▸Safety & Tenant Protection16
▸DOB NOWTenant Protection Plan10
08/13/2026B00399338-P1Open ↗
08/13/2026B00186506-I1Open ↗
08/13/2026B00381248-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES4
01/13/2021340736644Open ↗
09/29/2020340766308Open ↗
08/11/2020340754302Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
08/30/2010320206424Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/30/2021340789588Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00821368-I1Open ↗
08/27/2026B00821431-P1Open ↗
08/27/2026B00916066-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
10/19/2010320227312Open ↗
08/30/2010320206424Open ↗
05/13/2008310140399Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/24/2020340766308Open ↗
11/23/2020340789588Open ↗
10/20/2016321468069Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00399382-I1Open ↗
08/13/2026B00399338-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/22/2020340736644Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/19/2017321468069Open ↗
10/20/2016321468069Open ↗
08/09/2016320431261Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
07/01/2021340789588Open ↗
10/19/2017321468069Open ↗
08/09/2016320431261Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/01/2021340789588Open ↗
02/10/2021340736644Open ↗
11/23/2020340789588Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/22/2020340736644Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/11/2021340736644Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/23/2012320431261Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/22/2021340736644Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/23/2021340766308Open ↗
09/23/2021340766308Open ↗
07/01/2021340789588Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/23/2021340766308Open ↗
07/02/2021340789588Open ↗
06/07/2021340754302Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL8
12/14/2020340736644Open ↗
11/23/2020340789588Open ↗
09/29/2020340766308Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/15/2020340789588Open ↗
12/15/2020340789588Open ↗
12/15/2020340789588Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
09/23/2021340766308Open ↗
06/07/2021340754302Open ↗
05/11/2021340736644Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
02/23/2012320431261Open ↗
10/19/2010320227312Open ↗
05/13/2008310140399Open ↗
▸BISFINAL1
10/22/2020340736644Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT13
07/01/2021340789588Open ↗
12/22/2020340789588Open ↗
10/13/2020340736644Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/23/2021340766308Open ↗
04/22/2021340736644Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/29/2020340766308Open ↗
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026B00186506-I1Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION9
01/27/2021340766308Open ↗
01/13/2021340736644Open ↗
11/16/2020340766308Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
10/20/2016321468069Open ↗
02/23/2012320431261Open ↗
10/19/2010320227312Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/11/2021340736644Open ↗
11/23/2020340789588Open ↗
09/29/2020340766308Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/03/2018321468069Open ↗
10/19/2017321468069Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01071479-I1Open ↗