← Back
Two stories - detached, small or mid-size
174 UTTER AVENUE
STATEN ISLAND · BIN 5009194
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
3,501 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalCivil
Floor 29p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS608/15/2025
C&P DESIGN CONSULTANTS203/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P DESIGN CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PISILI INCGeneral Contractor407/08/2026
STATEN ISLAND MECH LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472508/15/2025
SRA PLANNING & EXPEDITING5677308/15/2025
Building Lifecycle
All (54)Filed (7)Permit Issued (4)Signed Off (4)Inspection (7)Objection (2)Special Inspection (30)
03/11/2026
Signed off — Alteration CO
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ADDITTION TO ENLARGE AN EXISTING FULLY DETACHED ONE (1) FAMILY HOME
S08006287-I1
11/28/2025
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM MONTAGUE
11/28/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
11/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Heating Systems
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Final
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
11/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
11/28/2025
Special inspection requirement — Shutoff dampers
Stanislav Pilipenko
11/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
11/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/15/2025
Filed — Alteration CO
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ADDITTION TO ENLARGE AN EXISTING FULLY DETACHED ONE (1) FAMILY HOME
S08006287-P2
04/10/2025
Signed off — Alteration
Installation of new 17' curb cut associated with new NB S08051991-I1
S08051991-I1
03/27/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/14/2025
Signed off — Alteration
application filed to install plumbing , gas fired fixtures and drywell for storm water detention in connection with alteration type 1 application # S08006287-I1
S08050743-I1
03/12/2025
Filed — Alteration
Installation of new 17' curb cut associated with new NB S08051991-I1
S08051991-P1
02/14/2025
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Heating Systems
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM MONTAGUE
02/07/2025
Signed off — Alteration
application filed to construct a basement and two (2) story frame addition to an existing one (1) family fully detached home - with an existing one (1) car fully detached garage
S08050737-I1
01/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/10/2024
Permit issued — Curb Cut
S08051991-I1-CC
08/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Filed — Alteration
application filed to install plumbing , gas fired fixtures and drywell for storm water detention in connection with alteration type 1 application # S08006287-I1
S08050743-P1
07/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/05/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/30/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/19/2024
Permit issued — Plumbing
S08050743-I1-PL
03/13/2024
Permit issued — General Construction
S08006287-I1-GC-CX
03/01/2024
Permit issued — Construction Fence
S08050737-I1-FN
12/28/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Scope
07/05/2023
Filed — Alteration CO
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ADDITTION TO ENLARGE AN EXISTING FULLY DETACHED ONE (1) FAMILY HOME
S08006287-I1
06/05/2023
Filed — Alteration
application filed to install plumbing , gas fired fixtures and drywell for storm water detention in connection with alteration type 1 application # S08006287-I1
S08050743-I1
06/05/2023
Filed — Alteration
application filed to construct a basement and two (2) story frame addition to an existing one (1) family fully detached home - with an existing one (1) car fully detached garage
S08050737-I1
12/13/2022
Filed — Alteration
Installation of new 17' curb cut associated with new NB S08051991-I1
S08051991-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPISILI INC11/10/2024
DOB NOWPlumbingSigned-offSTATEN ISLAND MECH LLC03/19/2024
DOB NOWGeneral ConstructionPermit IssuedPISILI INC03/13/2024
DOB NOWConstruction FenceSigned-offPISILI INC03/01/2024
1 project · most recent 08/15/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/15/2025Permit IssuedPISILI INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
N/A N/A 33,000 BTU · Condensing Unit ×2
Ventilation
N/A N/A 100 CFM · Erv ×2
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
2 projects · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025CompleteCECO ELECTRIC INCGeneral Wiring
03/27/2024CompleteCECO ELECTRIC INC1 meters, 1 new_meters
1 project · most recent 08/15/2025
Wood
FiledStatusContractorScope
08/15/2025Permit IssuedPISILI INCWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/27/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Pass-Final PL - UndergroundPassView ↗
06/05/2024Pass-Final PL - UndergroundPassView ↗
05/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
11/28/2025Chimneys and ventsStanislav Pilipenkospecial
11/28/2025Structural Stability – Alterations of existing buildingsWILLIAM MONTAGUEspecial
11/28/2025Subgrade InspectionsStanislav Pilipenkospecial
11/28/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/28/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
11/28/2025Heating SystemsStanislav Pilipenkospecial
11/28/2025Mechanical SystemsStanislav Pilipenkospecial
11/28/2025Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
11/28/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
11/28/2025FinalStanislav Pilipenkoprogress
11/28/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
11/28/2025Footing and FoundationStanislav Pilipenkoprogress
11/28/2025Structural Wood FrameStanislav Pilipenkoprogress
11/28/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
11/28/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
11/28/2025Maintenance informationStanislav Pilipenkoenergy_progress
11/28/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
11/28/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
11/28/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
11/28/2025Permanent certificateStanislav Pilipenkoenergy_progress
11/28/2025FireplacesStanislav Pilipenkoenergy_progress
11/28/2025Shutoff dampersStanislav Pilipenkoenergy_progress
11/28/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
11/28/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
02/14/2025Chimneys and ventsStanislav Pilipenkospecial
Latest 25 of 55.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S08051991-I1Request digital key ↗
08/23/2026S08051991-P1Request digital key ↗
08/23/2026S08050737-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
12/18/2024540236252Open ↗
09/15/2022540236252Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/26/2023540236252Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S08006287-P2Open ↗
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P5Open ↗
08/13/2026S08006287-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08006287-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026S08050743-P1Open ↗
08/24/2026S08006287-P2Open ↗
08/24/2026S08006287-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S08051991-P1Open ↗
08/23/2026S08051991-I1Open ↗
08/23/2026S08050737-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S08050743-P1Open ↗
09/01/2026S08050743-P1Open ↗
08/24/2026S08006287-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/15/2022540236252Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/15/2022540236252Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/18/2026S08006287-P2Open ↗
08/18/2026S08006287-P5Open ↗
08/14/2026S08006287-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08006287-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08006287-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08006287-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026S08006287-P5Open ↗
08/18/2026S08006287-P2Open ↗
08/14/2026S08006287-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S08006287-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S08006287-P5Open ↗
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P2Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/15/2022540236252Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08006287-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/26/2023540236252Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/15/2022540236252Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION4
12/26/2023540236252Open ↗
12/26/2023540236252Open ↗
12/26/2023540236252Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P2Open ↗
08/13/2026S08006287-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P2Open ↗
08/13/2026S08006287-P5Open ↗
▸DOB NOWPlot Diagram3
08/13/2026S08006287-P2Open ↗
08/13/2026S08006287-I1Open ↗
08/13/2026S08006287-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026S08006287-P2Open ↗
08/18/2026S08006287-P5Open ↗
08/14/2026S08006287-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/26/2023540236252Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
12/26/2023540236252Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S08006287-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08006287-I1Open ↗