← Back
Two stories - detached, small or mid-size
174 UTTER AVENUE
STATEN ISLAND · BIN 5152340
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
3,501 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Structural
Floor 11 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS308/14/2025
C&P DESIGN CONSULTANTS105/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PISILI INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472208/14/2025
SRA PLANNING & EXPEDITING5677105/22/2024
Building Lifecycle
All (34)Filed (3)Permit Issued (2)Signed Off (1)Inspection (2)Special Inspection (26)
09/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Final
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
09/08/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
08/14/2025
Filed — New Building
APPLICATION FILED TO CONSTRUCT A SLAB ON GRADE - ONE (1) STORY FRAME - DETACHED TWO (2) CAR GARAGE IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION # S08006287-I1
S01111228-P1
05/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Final
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
02/14/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
01/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2024
Permit issued — Structural
S01111228-I1-GC-CX
09/27/2024
Filed — New Building
APPLICATION FILED TO CONSTRUCT A SLAB ON GRADE - ONE (1) STORY FRAME - DETACHED TWO (2) CAR GARAGE IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION # S08006287-I1
S01111228-I1
08/16/2024
Signed off — Full Demolition
S01042724-I1
07/18/2024
Permit issued — Full Demolition
S01042724-I1-FD
05/22/2024
Filed — Full Demolition
S01042724-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedPISILI INC10/14/2024
DOB NOWFull DemolitionSigned-offPISILI INC07/18/2024
1 project · most recent 11/26/2024
General Wiring
FiledStatusContractorScope
11/26/2024CompleteCECO ELECTRIC INCGeneral Wiring
1 project · most recent 08/14/2025
Wood
FiledStatusContractorScope
08/14/2025Permit IssuedPISILI INCWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/08/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
09/08/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
09/08/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
09/08/2025Subgrade InspectionsStanislav Pilipenkospecial
09/08/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
09/08/2025FinalStanislav Pilipenkoprogress
09/08/2025Footing and FoundationStanislav Pilipenkoprogress
09/08/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
09/08/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
09/08/2025Permanent certificateStanislav Pilipenkoenergy_progress
09/08/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
09/08/2025Fenestration areasStanislav Pilipenkoenergy_progress
09/08/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
02/14/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
02/14/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
02/14/2025Subgrade InspectionsStanislav Pilipenkospecial
02/14/2025FinalStanislav Pilipenkoprogress
02/14/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
02/14/2025Footing and FoundationStanislav Pilipenkoprogress
02/14/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
02/14/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
02/14/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
02/14/2025Permanent certificateStanislav Pilipenkoenergy_progress
02/14/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
02/14/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
Latest 25 of 26.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S01042724-I1Request digital key ↗
08/18/2026S01111228-P1Request digital key ↗
08/18/2026S01111228-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026S01111228-I1Open ↗
08/23/2026S01111228-I1Open ↗
08/23/2026S01111228-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026S01111228-I1Open ↗
08/23/2026S01111228-I1Open ↗
08/23/2026S01111228-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
08/13/2026S01042724-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01042724-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01042724-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01042724-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01042724-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01111228-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01111228-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01111228-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01042724-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01042724-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01111228-I1Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification3
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
08/13/2026S01042724-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026S01111228-I1Open ↗
08/13/2026S01111228-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01042724-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01042724-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01111228-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026S01042724-I1Open ↗