RoofUnder Construction2 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
INSTALLATION ROOF PROTECTION PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. OF THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF WITH PLYWOOD ON TOP AND PIPE SCAFFOLD FRAME.
On file for this project
24 documents
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
PenthouseUnder Construction2p · 1 filing · 3 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
Floor 711p · 1 filing · 7 docs
Architecture
No filed description on record for this project.
On file for this project
7 documents · 1 drawing sheet
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28Under Construction23p · 2 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 3 drawing sheets
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Floor 27Under Construction3p · 2 filings · 16 docs
Fire ProtectionStructural
Issued Permit Scope
Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Sprinkler Standpipe modification to floors listed in relation to compliance with LL26.
On file for this project
13 documents · 1 drawing sheet
Floor 26Under Construction27p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Standpipe · Structural
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 4 drawing sheets
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Latest 3 of 4 filings on this floor.
Floor 25Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 24Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 23Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 22Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 21Under Construction10p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Mechanical removal and modification for whiteboxed space on floors 3 and 21.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 20Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 19Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 18Under Construction6p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
EQUIPMENT USE: DUAL 7000# CAPACITY PERSONNEL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 17Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 16Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 15Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 13Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 12Under Construction7p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Latest 3 of 4 filings on this floor.
Floor 11Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 10Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 9Under Construction5p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 8Under Construction5p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 7Under Construction5p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 6Under Construction5p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 5Under Construction6p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 2 drawing sheets
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 4Under Construction5p · 3 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
General Construction · Standpipe · Structural
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 1 drawing sheet
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Floor 3Under Construction187p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 3 drawing sheets
Project M01341709Permit Issued · 04/27/2026
THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION
On file for this project
3 documents · 2 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Latest 3 of 7 filings on this floor.
Floor 2Under Construction187p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 3 drawing sheets
Mechanical modification within cellar and first floor restaurant space as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
22 documents · 1 drawing sheet
Standpipe modification on the second floor as per plans filed herewith. Connect new SD piping to existing riser, install new fire hose cabinet.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction177p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 4 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Mechanical modification within cellar and first floor restaurant space as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarUnder Construction120p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Protection and Mechanical Methods · Standpipe · Structural · Support of Excavation
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 9 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents · 1 drawing sheet
Sprinkler Standpipe modification to floors listed in relation to compliance with LL26.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction182p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Support of Excavation
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
On file for this project
61 documents · 5 drawing sheets
TEMPORARY DRY STANDPIPE IN CONJUNCTION WITH FDNY LNO VARIANCE (RECORD NUMBER 2025-TMENGR-001688-PLAN)
On file for this project
19 documents
Sprinkler Standpipe modification to floors listed in relation to compliance with LL26.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.