← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1740 GRAND AVENUE
BRONX · BIN 2008513
💬 Discuss this project
1940Year Built
6Stories
D1Building Class
R7-1Zoning
107,477 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized22 Active Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Tolentine-Zeiser Housing Development Fun D · 25,016 sf lot · 4.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 3 docs
Site & exteriorSycamore Birch Management23p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sycamore Row503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services109/27/2024
Syed Engineering207/25/2024
Ashraf109/27/2022
Enthink Engineers103/03/2022
Royal T&E109/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Permit Expediting403/21/2026
SNR Expediting Design203/21/2026
Sheikh Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triera ContractingScaffold407/08/2026
Jimmy G ConstructionGeneral Contractor403/21/2026
Jimmy G ConstructionScaffold307/08/2026
Royal Construction AssociatesGeneral Contractor303/21/2026
Royal Construction AssociatesScaffold303/21/2026
Satellite East PlumbingPlumbing203/22/2026
Safeline GroupScaffold107/08/2026
LXS AirGeneral Contractor103/21/2026
GSB Plumbing & HeatingPlumbing103/21/2026
Absolute Plumbing & Heating & MechanicalPlumbing106/25/2019
Dual Fuel Plumbing & HeatingPlumbing111/08/1996
Gowie PlumbingPlumbing108/15/1996
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Syed Engineering7054106/27/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
08/26/2026
1775 davidson ave and 1740 grand ave properties requiring an qualified retaining wall inspector (qrwi) to inspect the retaining wall which appears…
DOB violation · open
07/23/2026
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard
HPD violation · open
02/10/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/14/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH WINDOW PANE AT EAST WALL IN THE BATHROOM LOCATED AT APT 216, 2nd…
HPD violation · open
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSafeline Group11/07/2024
DOB NOWGeneral ConstructionSigned-offRoyal Construction Associates08/13/2024
DOB NOWSidewalk ShedSigned-offRoyal Construction Associates08/13/2024
DOB NOWSuspended ScaffoldSigned-offHarmel Singh07/05/2024
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction04/21/2023
DOB NOWGeneral ConstructionSigned-offJimmy G Construction04/20/2023
DOB NOWGeneral ConstructionSigned-offJimmy G Construction10/04/2022
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction03/04/2022
DOB NOWSidewalk ShedPermit IssuedTriera Contracting09/19/2019
DOB NOWSidewalk ShedPermit IssuedTriera Contracting09/07/2018
BISMHISSUEDLXS Air01/22/2020
BISPLISSUEDAbsolute Plumbing & Heating & Mechanical06/25/2019
BISPLISSUEDGSB Plumbing & Heating04/16/2019
BISBLISSUEDGSB Plumbing & Heating12/07/2017
BISPLISSUEDGSB Plumbing & Heating11/13/2017
BISBLISSUEDGSB Plumbing & Heating09/07/2017
BISPLISSUEDGSB Plumbing & Heating10/25/2016
BISBLISSUEDGSB Plumbing & Heating10/24/2016
BISPLISSUEDDual Fuel Plumbing & Heating11/08/1996
BISFSISSUEDLarry Berge11/06/1996
BISEQISSUEDColgate Scaffolding08/19/1996
BISPLISSUEDCape Plumbing08/15/1996
BISOTISSUEDSuperman Contracting06/26/1996
BISSPISSUEDApple Incineratir/Rockaway Plumbing12/27/1989
BISOTISSUEDApple Incinerator & Compaction12/14/1989
4 projects · most recent 03/03/2022
General Wiring Boiler Controls
FiledStatusContractorScope
03/03/2022Permit IssuedRichard Neu—
06/04/2019CompleteF & F ElectricalGeneral Wiring
10/31/2018CompleteWMS Electrical ContngBoiler Controls
09/06/2018Permit IssuedMeo Electric—
1 project · most recent 03/03/2022
Sidewalk Shed
FiledStatusContractorScope
03/03/2022Permit IssuedJimmy G ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/14/2024MasonryRAFI HAMIDspecial
06/14/2024Structural Stability – Alterations of existing buildingsRAFI HAMIDspecial
06/14/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
05/30/2024FinalRAFI HAMIDprogress
07/27/2022FinalBRIAN MCCAFFREYprogress
84 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account