Two family brick
1740 SUMMERFIELD STREET
QUEENS · Ridgewood · BIN 4086062
💬 Discuss this project
2023Year Built
3Stories
B1Building Class
R5BZoning
3,626 sfGross Floor Area
2Units
Two family brick · 2,500 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof5p · 1 filing · 20 docs
Floor 321p · 2 filings · 20 docs
Floor 221p · 2 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Flushing804/04/2023
Jspcllc109/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 Design1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC ConstructionScaffold303/21/2026
LXC Constructionspecialty_contractor303/21/2026
Crossfield Plumbing & Heatingspecialty_contractor207/08/2026
Sunpower Corporation, SystemsGeneral Contractor110/30/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Flushing Engineering Service4373804/04/2023
Triangle Inspection & Tes7495301/27/2023
Building Lifecycle
01/25/2024
Signed off — Alteration
INSTALL PLUMBING AND SPRINKLER SYSTEM FOR A NEW TWO FAMILY HOUSE
Q00649317-I1
12/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/28/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating12/29/2022
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating12/13/2022
DOB NOWConstruction FenceSigned-offLXC Construction10/25/2022
DOB NOWMechanical SystemsPermit IssuedLXC Construction10/22/2022
BISOTISSUEDSunpower Corporation, Systems10/30/2023
1 project · most recent 04/04/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/04/2023Permit IssuedLXC ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
2 projects · most recent 11/08/2023
General Wiring
FiledStatusContractorScope
11/08/2023CompleteBerger Quality Electrical—
12/13/2022CompleteKJK ElectricGeneral Wiring
1 project · most recent 04/04/2023
Steel Concrete Masonry
FiledStatusContractorScope
04/04/2023Permit IssuedLXC ConstructionSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/28/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
10/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/28/2023Fail-Final CND-Occupancy InspectionFailView ↗
08/10/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
04/11/2023Subgrade InspectionsKY FUspecial
04/11/2023Fire-Resistant Penetrations and JointsKY FUspecial
04/11/2023Structural Steel - DetailsKY FUspecial
04/11/2023Mechanical SystemsKY FUspecial
04/11/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKY FUspecial
04/11/2023Structural Steel - High Strength BoltingKY FUspecial
04/11/2023Concrete - Cast-In-PlaceKY FUspecial
04/11/2023MasonryKY FUspecial
04/11/2023Excavations - Sheeting, Shoring, and BracingKY FUspecial
04/11/2023FinalKY FUprogress
04/11/2023Footing and FoundationKY FUprogress
04/11/2023Duct leakage testing, insulation and designKY FUenergy_progress
04/11/2023HVAC-R and service water heating equipmentKY FUenergy_progress
04/11/2023Electric vehicle service equipment requirementsKY FUenergy_progress
04/11/2023HVAC-R and service water heating system controlsKY FUenergy_progress
04/11/2023Fenestration and door U-factor and product ratingsKY FUenergy_progress
04/11/2023Air barrier — testing KY FUenergy_progress
04/11/2023Maintenance informationKY FUenergy_progress
04/11/2023MeteringKY FUenergy_progress
04/11/2023Ventilation and air distribution systemKY FUenergy_progress
04/11/2023Interior lighting powerKY FUenergy_progress
04/11/2023Permanent certificateKY FUenergy_progress
04/11/2023Air barrier - visual inspectionKY FUenergy_progress
04/11/2023HVAC-R and service water piping design and insulationKY FUenergy_progress
04/11/2023Fenestration air leakageKY FUenergy_progress
Latest 25 of 122.
219 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account