← Back
BuildNYC
Over six families without stores
1745 EASTBURN AVENUE
BRONX · BIN 2007412
💬 Discuss this project
1928Year Built
5Stories
C1Building Class
R8Zoning
—Gross Floor Area
38Units
144 Active Violations 141 unresolved · 3 paperwork only 3 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: 1745 Eastburn Ave · 3.39 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar6p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1745 Eastburn Ave303/22/2026
Alpha Rest and Watr103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering202/21/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Plumbing CompanyPlumbing203/21/2026
Arco Plumbing and HeatingPlumbing107/08/2026
1 R.S.General Contractor108/05/2013
Alpha Rest. and WatrGeneral Contractor110/22/2010
Alpha Restoration and WatGeneral Contractor210/01/2013
Ips PlumbingPlumbing208/10/2016
The Plumbing & Heating SpeciaPlumbing108/31/2012
Building Lifecycle
06/30/2026
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south yard
HPD violation · open
06/30/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT BBB, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · open
06/30/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM…
HPD violation · open
06/30/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND CEILING IN THE KITCHEN LOCATED…
HPD violation · open
06/30/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE…
HPD violation · open
215 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offArco Plumbing and Heating02/21/2020
DOB NOWBoiler EquipmentPermit IssuedApproved Oil of Brooklyn02/21/2020
BISFBISSUEDMichael S. Kaplan05/01/2018
BISPLISSUEDIps Plumbing08/10/2016
BISPLISSUEDIps Plumbing07/13/2015
BISFBISSUEDMichael S. Kaplan06/26/2015
BISOTISSUEDAlpha Restoration and Wat10/01/2013
BISEQISSUEDRock Group NY08/05/2013
BISOTISSUEDAlpha Restoration and Wat06/07/2013
BISPLISSUEDThe Plumbing & Heating Specia08/31/2012
BISPLISSUEDThe Plumbing Company04/10/2012
BISPLISSUEDThe Plumbing Company03/14/2011
BIS—ISSUEDAlpha Rest. and Watr10/22/2010
1 project · most recent 01/15/2020
FiledStatusContractorScope
01/15/2020CompleteDemand Electric—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/13/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
111 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account