Elevator apt, fireproof with stores
Knickerbocker Plaza
1749 2 AVENUE · BIN 1048914
💬 Discuss this project
1975Year Built
40Stories
D6Building Class
C2-8Zoning
693,459 sfGross Floor Area
586Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: KNICKERBOCKER PLAZA LLC · 49,146 sf lot · 14.11 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 3 filings · 19 docs
Floor 40Under Construction8p · 1 filing · 6 docs
Floor 39Under Construction8p · 1 filing · 6 docs
Floor 38Under Construction8p · 1 filing · 6 docs
Floor 37Under Construction8p · 1 filing · 6 docs
Floor 36Under Construction8p · 1 filing · 6 docs
Floor 35Under Construction8p · 1 filing · 6 docs
Floor 34Under Construction8p · 1 filing · 6 docs
Floor 33Under Construction8p · 1 filing · 6 docs
Floor 32Under Construction8p · 1 filing · 6 docs
Floor 31Under Construction8p · 1 filing · 6 docs
Floor 30Under Construction8p · 1 filing · 6 docs
Floor 29Under Construction8p · 1 filing · 6 docs
Floor 28Under Construction8p · 1 filing · 6 docs
Floor 27Under Construction8p · 1 filing · 6 docs
Floor 26Under Construction8p · 1 filing · 6 docs
Floor 25Under Construction8p · 1 filing · 6 docs
Floor 24Under Construction8p · 1 filing · 6 docs
Floor 23Under Construction8p · 1 filing · 6 docs
Floor 22Under Construction8p · 1 filing · 6 docs
Floor 21Under Construction8p · 1 filing · 6 docs
Floor 20Under Construction8p · 1 filing · 6 docs
Floor 19Under Construction8p · 1 filing · 6 docs
Floor 18Under Construction8p · 1 filing · 6 docs
Floor 17Under Construction8p · 1 filing · 6 docs
Floor 16Under Construction8p · 1 filing · 6 docs
Floor 15Under Construction8p · 1 filing · 6 docs
Floor 14Under Construction8p · 1 filing · 6 docs
Floor 13Under Construction8p · 1 filing · 6 docs
Floor 12Under Construction8p · 1 filing · 6 docs
Floor 11Under Construction8p · 1 filing · 6 docs
Floor 10Under Construction8p · 1 filing · 6 docs
Floor 9Under Construction8p · 1 filing · 6 docs
Floor 8Under Construction8p · 1 filing · 6 docs
Floor 7Under Construction8p · 1 filing · 6 docs
Floor 6Under Construction8p · 1 filing · 6 docs
Floor 5Under Construction8p · 1 filing · 6 docs
Floor 4Under Construction8p · 1 filing · 6 docs
Floor 3Under Construction8p · 1 filing · 6 docs
Floor 2Under Construction8p · 1 filing · 6 docs
Floor 1Under Construction11p · 2 filings · 14 docs
CellarUnder Construction1p · 1 filing · 6 docs
Sub-CellarUnder Construction1p · 1 filing · 6 docs
Sub-BasementUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION1409/09/2026
RY MANAGEMENT5407/29/2026
GGMC PARKING707/08/2026
KNICKERBOCKER PLAZA2003/22/2026
PLAZA GARAGE CORP403/22/2026
ELRO RESTORATION CORP.103/22/2026
OWNER OF THE BUILDING AT103/22/2026
OWNER OF BLDG 1763 2ND AV103/22/2026
KNICKERBOCKER PLAZA HOUSI203/22/2026
OWNER OF 1751 SECOND AVEN203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING510/18/2025
BOND ENGINEERING PC103/25/2025
PIRO STUDIO LLC105/02/2024
RIMKUS NEW YORK PLLC103/22/2024
IAA ARCHITECTS PLLC309/08/2021
F.P.VILLANO CONSULTING ENGINEER LLC207/30/2021
ASHRAF CORP103/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION803/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
RIMKUS NEW YORK PLLC203/21/2026
A K EXPEDITING203/21/2026
TASHEED BUILDING CONSULTANTS403/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1109/09/2026
SHAM CONSTRUCTION GROUPGeneral Contractor903/21/2026
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor207/29/2026
Z-CAR-DScaffold207/08/2026
KATAN P & H INCPlumbing107/08/2026
RUMBA AIR CONDITIONIN CORGeneral Contractor104/09/2026
CENTURY ELECTRIC CO.Electrical103/22/2026
PRINCIPAL ELECTRICAL CORPElectrical103/22/2026
ANASTASIOS MATSIKASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898310/18/2025
ROCK ARCH ENG CORP7831203/25/2025
PIRO STUDIO LLC7503105/02/2024
MG NEW YORK ARCHITECTS, P3444105/02/2024
RIMKUS NEW YORK, PLLC8123103/22/2024
BIZ DESIGNS LLC6312103/22/2024
ASHRAF CORPORATION1973309/08/2021
Building Lifecycle
All (144)Filed (14)Permit Issued (21)Signed Off (5)Facade (FISP) (15)Violation (60)Inspection (1)Special Inspection (28)
09/08/2026
Permit issued — Sidewalk Shed
M01033399-I1-SH
07/28/2026
Permit issued — General Construction
M01161963-I1-GC
06/09/2026
Signed off — Alteration
Installation of (2) 10 ton air cooled unit split systems. Installation at the 1st floor Lobby.
M01037920-I1
06/08/2026
Permit issued — Sidewalk Shed
M01033399-I1-SH
05/13/2026
Permit issued — General Construction
M01013409-I1-GC
04/13/2026
Permit issued — Suspended Scaffold
M01035156-I1-SC
03/09/2026
Permit issued — Sidewalk Shed
M01033399-I1-SH
03/06/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (ECB, closed)
Unknown
10/20/2025
Permit issued — Supported Scaffold
M01304196-I1-SF
10/18/2025
Filed — Alteration
M01304196-I1
10/16/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
10/07/2025
Violation issued (HPD, closed)
A
10/07/2025
Violation issued (HPD, closed)
A
09/12/2025
Filed — Alteration
Proposed installation of heavy duty sidewalk shed as per plans. Work to comply with New York City Building code Chapter 33. No change in use, egress or occupancy.
M01033399-P1
08/05/2025
Permit issued — General Construction
M01161963-I1-GC
07/01/2025
Cycle 9 facade report signed — SWARMP
06/30/2025
Filed — Alteration
Outriggers system installation for inspection of facade and repairs.
M01035156-P1
06/30/2025
Cycle 9 facade report submitted
06/27/2025
Permit issued — Mechanical Systems
M01037920-I1-MS
06/27/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
06/26/2025
Cycle 9 facade inspection completed
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
C
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
B
06/24/2025
Violation issued (HPD, closed)
A
05/16/2025
Permit issued — General Construction
M01013409-I1-GC
04/19/2025
Violation issued (ECB, closed)
Unknown
04/14/2025
Permit issued — Suspended Scaffold
M01035156-I1-SC
04/14/2025
Permit issued — Sidewalk Shed
M01033399-I1-SH
03/25/2025
Filed — Alteration
M01161963-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Muhammad Muhaysin
01/07/2025
Special inspection requirement — Masonry
Muhammad Muhaysin
01/02/2025
Special inspection requirement — Final
BRIAN O'CONNOR
11/14/2024
Violation issued (ECB, closed)
Construction
10/31/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/24/2024
Violation issued (ECB, closed)
Construction
05/16/2024
Permit issued — General Construction
M01013409-I1-GC
05/02/2024
Filed — Alteration
Installation of (2) 10 ton air cooled unit split systems. Installation at the 1st floor Lobby.
M01037920-I1
04/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL GADALETA
04/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
04/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
04/29/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
04/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
04/18/2024
Special inspection requirement — Final
PIETRO ROSATO
04/18/2024
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
04/15/2024
Permit issued — Suspended Scaffold
M01035156-I1-SC
04/12/2024
Filed — Alteration
Outriggers system installation for inspection of facade and repairs.
M01035156-I1
04/12/2024
Permit issued — Sidewalk Shed
M01033399-I1-SH
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP09/08/2026
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT07/28/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP06/08/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/13/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/13/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP03/09/2026
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP10/20/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT08/05/2025
DOB NOWMechanical SystemsSigned-offRUMBA AIR CONDITIONIN COR06/27/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/16/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/14/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP04/14/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/16/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/15/2024
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP04/12/2024
DOB NOWSignSigned-offZ-CAR-D CORP08/03/2021
DOB NOWSignSigned-offZ-CAR-D CORP08/02/2021
DOB NOWMechanical SystemsPermit IssuedSHAM CONSTRUCTION GROUP04/30/2021
DOB NOWPlumbingSigned-offKATAN P & H INC04/07/2021
DOB NOWGeneral ConstructionSigned-offSHAM CONSTRUCTION GROUP04/07/2021
DOB NOWGeneral ConstructionSigned-offSHAM CONSTRUCTION GROUP03/24/2021
BISOTISSUEDMILLENIUM RESTORATION CORP04/11/2019
BISOTISSUEDD.B.J. CONTRACTING CORP08/31/2018
BISMHISSUEDINTEGRATE COMFORT SYSTEM12/18/2017
BISOTISSUEDINTEGRATE COMFORT SYSTEM12/15/2017
BISOTISSUEDP&K BUILD NEW YORK CONST07/27/2017
BISOTISSUEDPRONOS CONSTRUCTION CORP07/19/2017
BISOTISSUEDP&K BUILD NEW YORK CONST06/22/2017
BISOTISSUEDP&K BUILD NEW YORK CONST08/31/2016
BIS—ISSUEDA.M.A HOLDINGS INC03/19/2014
BISPLISSUEDACCURATE MECHANICAL INC02/06/2014
BISOTISSUEDPK ASSOCIATES INC01/30/2014
BISOTISSUEDFUJ CONSTRUCTION INC11/13/2013
BISEQISSUEDSTEEL SYSTEMS LLC03/12/2013
BISOTISSUEDMAUCERI SIGN SYSTEMS LLC09/28/2012
BISOTRE-ISSUEDIRW RESTORATION CORP09/13/2011
BISOTISSUEDIRW RESTORATION CORP06/08/2011
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/19/2011
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM05/28/2010
BISPLISSUEDFIRST CHOICE PLUMBING COR04/01/2010
+ 27 more permits on file
2 projects · most recent 05/02/2024
Heating and Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/02/2024Signed-offRUMBA AIR CONDITIONIN CORHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P24-NMHU-E 2 tons · Vrf Indoor ×2
PEFY-P36-NMHU-E 3 tons · Vrf Indoor ×2
PUHY-P144-NMHU 144,000 BTU · Vrf Outdoor ×2
PEFY-P12-NMHU-E 1 tons · Vrf Indoor ×1
PEFY-P48-NMHU-E 4 tons · Vrf Indoor ×1
PEFY-P72-NMHU-E 6 tons · Vrf Indoor ×1
03/12/2021Permit IssuedSHAM CONSTRUCTION GROUPAssociated Ducts and Piping, Ventilation Systems—
9 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026CompleteUPTOWN ELECTRICAL INC—
06/11/2025Permit IssuedTOWER ELECTRIC INC.—
05/21/2024CompleteDELUXE ELECL & MAINT CORPGeneral Wiring
12/12/2023Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
11/18/2021Permit IssuedISLAND ELECTRIC CORP—
04/06/2021Permit IssuedJOE ELECTRICAL INCGeneral Wiring
03/30/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/08/2019Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
12/03/2018CompletePRINCIPAL ELECTRICAL CORPGeneral Wiring
1 project · most recent 09/12/2025
Sidewalk Shed
FiledStatusContractorScope
09/12/2025Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 06/30/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/30/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/13/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/16/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
06/27/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
06/27/2025Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
01/07/2025Tenant Protection Plan ComplianceMuhammad Muhaysinspecial
01/07/2025MasonryMuhammad Muhaysinspecial
01/02/2025FinalBRIAN O'CONNORprogress
04/29/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
04/29/2024Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
04/29/2024HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
04/29/2024HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
04/29/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
04/29/2024HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
04/18/2024FinalPIETRO ROSATOprogress
04/18/2024Mechanical SystemsPIETRO ROSATOspecial
03/01/2024Tenant Protection Plan ComplianceJeff Akermanspecial
03/01/2024MasonryWILLIAM DAVISspecial
03/01/2024FinalWILLIAM DAVISprogress
09/09/2021Fire-Resistant Penetrations and JointsAKM HOQUEspecial
09/09/2021Energy Code Compliance InspectionsAKM HOQUEprogress
09/09/2021Air barrier - visual inspectionAKM HOQUEenergy_progress
09/09/2021Interior lighting powerAKM HOQUEenergy_progress
09/09/2021Lighting controlsAKM HOQUEenergy_progress
08/20/2021Energy Code Compliance InspectionsAKM HOQUEprogress
08/20/2021Lighting controlsAKM HOQUEenergy_progress
08/20/2021Air barrier - visual inspectionAKM HOQUEenergy_progress
Latest 25 of 28.
▾Documents — 301 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/04/2026M00484346-I1Request digital key ↗
09/04/2026M00484350-I1Request digital key ↗
09/04/2026M00484350-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits49
▸BISWORK PERMIT APPLICATION26
04/11/2019123757997Open ↗
09/04/2018123546715Open ↗
12/19/2017123227025Open ↗
Showing 3 of 26 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
07/25/2018123227025Open ↗
Showing 3 of 22 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/09/2013120367913Open ↗
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
02/05/2020123757997Open ↗
02/05/2020123757997Open ↗
11/09/2018123546715Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/19/2026M00484342-I1Open ↗
09/19/2026M00484342-I1Open ↗
09/19/2026M00484342-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/04/2026M00484346-I1Open ↗
09/03/2026M00484342-I1Open ↗
08/27/2026M01013409-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/19/2026M00484342-I1Open ↗
09/01/2026M00484342-P1Open ↗
08/27/2026M01013409-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
12/19/2017123227025Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
07/25/2017123330886Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/21/2012121385946Open ↗
06/02/2010120367913Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/12/2013140061661Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/12/2013140061661Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE PERMITS4
08/22/2018123227025Open ↗
11/20/2014121905304Open ↗
11/12/2014121905304Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
03/31/2014121905304Open ↗
03/03/2014121905304Open ↗
05/26/2010120242077Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
08/22/2018123227025Open ↗
11/12/2014121905304Open ↗
11/20/2014121905304Open ↗
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/31/2014121905304Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/26/2010120242077Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
12/19/2017123227025Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/04/2026M00484346-I1Open ↗
09/03/2026M00484342-I1Open ↗
08/27/2026M01013409-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
04/07/2011120652427Open ↗
04/07/2011120652427Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
12/19/2017123227025Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/21/2012121385946Open ↗
06/02/2010120367913Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
02/01/2014121905304Open ↗
01/31/2014121905304Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/05/2020123757997Open ↗
03/21/2019123757997Open ↗
11/09/2018123546715Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/05/2020123757997Open ↗
11/09/2018123546715Open ↗
08/22/2018123227025Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
11/20/2014121905304Open ↗
11/04/2014121905304Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00484342-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/12/2013140061661Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
02/05/2020123757997Open ↗
11/09/2018123546715Open ↗
08/22/2018123227025Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
10/22/2012121150627Open ↗
09/21/2012121385946Open ↗
04/07/2011120652427Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/09/2013120367913Open ↗
01/25/2011120367913Open ↗
01/25/2011120367913Open ↗
▸BISCCD1-Construction Code Determination1
10/13/2011120652427Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
02/05/2020123757997Open ↗
03/21/2019123757997Open ↗
11/09/2018123546715Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET14
03/21/2019123757997Open ↗
09/04/2018123546715Open ↗
12/19/2017123227025Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION6
07/25/2018123227025Open ↗
07/12/2018123227025Open ↗
11/07/2014121905304Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM6
02/05/2020123757997Open ↗
11/09/2018123546715Open ↗
08/22/2018123227025Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/12/2013140061661Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
03/12/2013140061661Open ↗
06/14/2010120242077Open ↗
05/26/2010120242077Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01035156-P1Open ↗
08/13/2026M01035156-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01035156-I1Open ↗
08/13/2026M01035156-P1Open ↗