← Back
Two family converted from one family
175-04 145 DRIVE
QUEENS · BIN 4285363
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3-2Zoning
2,336 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.58 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 27p · 2 filings · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
2 jobs · most recent 02/09/2026
General Wiring
FiledStatusContractorScope
02/09/2026CompleteREDLINE ELECTRIC INC—
11/15/2024CompleteC & A ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (51)Filed (9)Permit Issued (7)Signed Off (6)Inspection (9)Special Inspection (20)
03/12/2026
Signed off — Alteration
Q01311153-I1
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
03/10/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
03/10/2026
Special inspection requirement — Final
Ayracon Almaraz
03/06/2026
Filed — Alteration
Q01311153-P1
03/01/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
03/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
03/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
03/01/2026
Special inspection requirement — Final
Ayracon Almaraz
11/05/2025
Permit issued — Solar
Q01311153-I1-SL
10/31/2025
Filed — Alteration
Q01311153-I1
10/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Signed off — Alteration
17 feet curb cut in conjunction with ALT-CO application # Q01121983-I1.
Q01209779-I1
08/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2025
Filed — Alteration CO
Q01121983-P1
05/22/2025
Signed off — Alteration
STRUCTURAL FRAMING AND PARTIAL DEMOLITION INCONJUNCTION WITH ALT CO APP# Q01121983-I1.
Q01132632-I1
05/22/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT CO APP # Q01121983-I1. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01135384-I1
05/22/2025
Signed off — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01121983-I1.
Q01122279-I1
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2025
Signed off — Alteration
TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION.
Q01066179-I1
05/01/2025
Permit issued — General Construction
Q01121983-I1-GC
04/22/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/14/2025
Permit issued — Curb Cut
Q01209779-I1-CC
04/11/2025
Filed — Alteration
17 feet curb cut in conjunction with ALT-CO application # Q01121983-I1.
Q01209779-I1
12/31/2024
Filed — Alteration CO
Q01121983-I1
11/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/06/2024
Permit issued — Plumbing
Q01135384-I1-PL
11/01/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT CO APP # Q01121983-I1. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01135384-I1
10/31/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/31/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
10/30/2024
Permit issued — Structural
Q01132632-I1-ST
10/25/2024
Filed — Alteration
STRUCTURAL FRAMING AND PARTIAL DEMOLITION INCONJUNCTION WITH ALT CO APP# Q01121983-I1.
Q01132632-I1
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
10/25/2024
Special inspection requirement — Final
HARI SONI
10/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
10/25/2024
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
10/10/2024
Permit issued — Foundation
Q01122279-I1-FO
10/04/2024
Filed — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01121983-I1.
Q01122279-I1
10/04/2024
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
10/04/2024
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
10/04/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
10/04/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/04/2024
Special inspection requirement — Final
HARI SONI
09/16/2024
Permit issued — Construction Fence
Q01066179-I1-FN
06/13/2024
Filed — Alteration
TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION.
Q01066179-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2025$1.4M—AVIV DEVELOPMENT CORP → Private party$599/sf building
07/16/2024$510K—— → —$218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC203/06/2026
TABRIZ GROUP ENTERPRISES206/02/2025
TABRIZ DESIGN GROUP504/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor1107/08/2026
REDLINE ELECTRIC INCElectrical103/22/2026
TRINITY SOLAR LLCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036203/06/2026
TABRIZ GROUP ENTERPRISES3275311/01/2024
TRIANGLE INSPECTION & TES7495111/01/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC11/05/2025
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC05/01/2025
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC04/14/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/06/2024
DOB NOWStructuralSigned-offPRECISION HOME DEV INC10/30/2024
DOB NOWFoundationSigned-offPRECISION HOME DEV INC10/10/2024
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC09/16/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/10/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
03/10/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
03/10/2026Energy Code Compliance InspectionsAyracon Almarazprogress
03/10/2026FinalAyracon Almarazprogress
03/01/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
03/01/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
03/01/2026Energy Code Compliance InspectionsAyracon Almarazprogress
03/01/2026FinalAyracon Almarazprogress
10/31/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/31/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
10/25/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/25/2024Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
10/25/2024FinalHARI SONIprogress
10/25/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
10/25/2024Structural Wood FrameBAKHTIAR SHAMLOOprogress
10/04/2024Footing and FoundationBAKHTIAR SHAMLOOprogress
10/04/2024Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
10/04/2024Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
10/04/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/04/2024FinalHARI SONIprogress
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026Q01066179-I1Request digital key ↗
08/21/2026Q01122279-I1Request digital key ↗
08/21/2026Q01132632-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01121983-P1Open ↗
08/13/2026Q01121983-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q01132632-I1Open ↗
09/02/2026Q01132632-I1Open ↗
09/01/2026Q01311153-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026Q01066179-I1Open ↗
08/21/2026Q01122279-I1Open ↗
08/21/2026Q01132632-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01132632-I1Open ↗
09/01/2026Q01311153-I1Open ↗
09/01/2026Q01135384-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026Q01122279-I1Open ↗
08/21/2026Q01132632-I1Open ↗
08/21/2026Q01135384-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01122279-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01122279-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01311153-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01121983-I1Open ↗
08/13/2026Q01121983-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01121983-P1Open ↗
08/20/2026Q01121983-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01121983-I1Open ↗