← Back
Elevator apt, semi-fireproof without stores
175-21 88 AVENUE
QUEENS · BIN 4210397
💬 Discuss this project
1963Year Built
6Stories
D1Building Class
R7AZoning
100,947 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BONNIE LYNN REALTY CORP · 24,000 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHELLY ESTATES GROUP1307/08/2026
JERRICK ASSOCIATES503/22/2026
BONNIE LYNN REALTY1303/22/2026
BONNIE LYNN CORP103/22/2026
BONNIE DYNN REALTY CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JERRICK ASSOCIATES INCGeneral Contractor507/08/2026
BIG APPLE FIRE SPRKL CO IFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLOMON ROSENZWEIG P.E. P1801201/08/2025
LEVIN ENGINEERING PLLC1267106/02/2021
Building Lifecycle
All (109)Filed (5)Permit Issued (4)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (4)Special Inspection (18)
11/14/2025
Violation issued (HPD, closed)
C
08/05/2025
Signed off — Alteration
EXTERIOR FACADE REPAIRS. FACE BRICK REPLACEMENT, CUT AND POINT, WINDOW SILL REPLACEMENT
Q01058111-I1
08/05/2025
Cycle 10 facade report submitted
08/05/2025
Cycle 10 facade report signed — SAFE
07/23/2025
Violation issued (HPD, closed)
C
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/22/2025
Violation issued (HPD, closed)
C
07/16/2025
Cycle 10 facade inspection completed
07/01/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, open)
C
05/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/11/2025
Permit issued — Structural
Q01117700-I1-ST
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Solomon Rosenzweig
02/05/2025
Special inspection requirement — Final
Max Lee
02/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Solomon Rosenzweig
02/05/2025
Special inspection requirement — Structural Steel - Details
Solomon Rosenzweig
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Solomon Rosenzweig
02/05/2025
Special inspection requirement — Structural Steel - Welding
Solomon Rosenzweig
01/23/2025
Filed — Alteration
INDOOR GARAGE REPAIR
Q01117700-P1
01/23/2025
Special inspection requirement — Final
01/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/23/2025
Special inspection requirement — Concrete - Cast-In-Place
01/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/23/2025
Special inspection requirement — Structural Steel - Details
01/23/2025
Special inspection requirement — Structural Steel - Welding
01/08/2025
Filed — Alteration
INDOOR GARAGE REPAIR
Q01117700-I1
12/09/2024
Signed off — Alteration
Q01050068-I1
09/24/2024
Permit issued — General Construction
Q01058111-I1-GC
08/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Solomon Rosenzweig
08/30/2024
Special inspection requirement — Post-installed Anchors
Solomon Rosenzweig
08/30/2024
Special inspection requirement — Masonry
Solomon Rosenzweig
07/08/2024
Filed — Alteration
EXTERIOR FACADE REPAIRS. FACE BRICK REPLACEMENT, CUT AND POINT, WINDOW SILL REPLACEMENT
Q01058111-I1
05/30/2024
Permit issued — Sidewalk Shed
Q01050068-I1-SH
05/29/2024
Filed — Alteration
Q01050068-I1
05/29/2024
Special inspection requirement — Final
Max Lee
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Solomon Rosenzweig
11/15/2023
Violation issued (HPD, closed)
C
11/15/2023
Violation issued (HPD, closed)
C
12/31/2022
Violation issued (HPD, closed)
C
12/31/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
B
06/17/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
A
06/17/2022
Violation issued (HPD, closed)
B
06/14/2022
Violation issued (HPD, closed)
C
01/22/2022
Cycle 9 facade report submitted
01/22/2022
Cycle 9 facade report signed — SWARMP
12/23/2021
Cycle 9 facade inspection completed
10/05/2021
Signed off — Alteration
Remove and replace existing fire sprinkler branch line to accommodate two additional fire sprinkler heads to provide required coverage of existing clothes dryers in residents' laundry room.
Q00522857-I1
09/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedGE 2A CONSTRUCTION02/11/2025
DOB NOWGeneral ConstructionSigned-offGE 2A CONSTRUCTION09/24/2024
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION05/30/2024
DOB NOWSprinklersSigned-offBIG APPLE FIRE SPRKL CO I07/13/2021
BISEQISSUEDGUL & G CONSTR. CORP06/23/2016
BISOTISSUEDEDIFICE DESIGN INC10/23/2015
BISEQISSUEDGUL & G CONSTR. CORP06/17/2015
BISFSISSUEDSTAR INDUSTRIAL SERV CO INC12/13/2005
BISPLISSUEDJOSEPH FERRIGNO PLUMBING & HTG.06/15/1998
BISFBISSUEDSTAR INDUSTRIES SERVICE CO IN06/11/1998
2 projects · most recent 09/04/2024
FiledStatusContractorScope
09/04/2024CompleteBOROWIDE ELECT'L CONTR'S—
12/06/2017CompleteSAFEWAY CONSTRUCTION, INC—
1 project · most recent 01/23/2025
Concrete
FiledStatusContractorScope
01/23/2025Permit IssuedJERRICK ASSOCIATES INCConcrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/28/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/26/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/05/2025Structural Stability – Alterations of existing buildingsSolomon Rosenzweigspecial
02/05/2025FinalMax Leeprogress
02/05/2025Concrete - Cast-In-PlaceSolomon Rosenzweigspecial
02/05/2025Structural Steel - DetailsSolomon Rosenzweigspecial
02/05/2025Tenant Protection Plan ComplianceSolomon Rosenzweigspecial
02/05/2025Structural Steel - WeldingSolomon Rosenzweigspecial
01/23/2025Final—progress
01/23/2025Tenant Protection Plan Compliance—special
01/23/2025Concrete - Cast-In-Place—special
01/23/2025Structural Stability – Alterations of existing buildings—special
01/23/2025Structural Steel - Details—special
01/23/2025Structural Steel - Welding—special
08/30/2024Structural Stability – Alterations of existing buildingsSolomon Rosenzweigspecial
08/30/2024Post-installed AnchorsSolomon Rosenzweigspecial
08/30/2024MasonrySolomon Rosenzweigspecial
05/29/2024FinalMax Leeprogress
05/29/2024Tenant Protection Plan ComplianceSolomon Rosenzweigspecial
05/15/2021Sprinkler SystemsDmitry Levinspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00522857-I1Request digital key ↗
08/22/2026Q01050068-I1Request digital key ↗
08/22/2026Q01058111-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
07/11/2016440223964Open ↗
10/26/2015421211147Open ↗
06/16/2015440223964Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/09/2015421211147Open ↗
06/16/2015440223964Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00522857-I1Open ↗
08/22/2026Q01050068-I1Open ↗
08/22/2026Q01058111-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026Q01058111-I1Open ↗
08/23/2026Q00522857-I1Open ↗
08/23/2026Q01117700-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/08/2017421211147Open ↗
09/09/2015421211147Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/09/2015421211147Open ↗
06/16/2015440223964Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q01058111-I1Open ↗
08/23/2026Q01117700-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/09/2015421211147Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/16/2015440223964Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/16/2015440223964Open ↗
▸Trade Schedules & Equipment1
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
06/16/2015440223964Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00522857-I1Open ↗
08/22/2026Q01058111-I1Open ↗
08/21/2026Q01117700-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/15/2017421211147Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/09/2015421211147Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/08/2017421211147Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/15/2015421211147Open ↗
10/26/2015421211147Open ↗
▸BISSHED LETTER1
07/11/2016440223964Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/08/2017421211147Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/08/2017421211147Open ↗
09/09/2015421211147Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
09/09/2015421211147Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/16/2015440223964Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/16/2015440223964Open ↗