← Back
Primarily 1 family with 1 store or office
175-44 LIBERTY AVENUE
QUEENS · BIN 4217963
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
M1-2AZoning
2,580 sfGross Floor Area
2Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: IGLESIA CRISTIANA,EL REDENTOR,INC. · 1,907 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 26p · 1 filing · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/17/2023$920K—Private party → IGLESIA CRISTIANA,EL REDENTOR,INC.$357/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
F360 ARCHITECTURE PLLC406/19/2024
NEW AIR SOLUTION INC.204/09/2024
JOSE A. SANTOS P.E.P.C203/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
UP DESIGN SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BATZ ENTERPRISES INCGeneral Contractor307/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292506/19/2024
NEW AIR SOLUTION INC8418204/09/2024
Building Lifecycle
All (82)Filed (8)Permit Issued (5)Signed Off (3)Violation (24)Inspection (7)Objection (10)Special Inspection (25)
11/25/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
10/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
07/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
07/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
07/05/2024
Objection resolved — Addressed
07/03/2024
Objection raised — Scope
06/19/2024
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-P2
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
06/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
06/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
05/23/2024
Signed off — Alteration
PROPOSE NEW TOILET ROOM @ CELLAR AND HC TOILET ROOM @ 1ST FLOOR. ALL FIXTURES ON 2ND FLOOR TO REMAIN. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
Q00889830-I1
05/23/2024
Signed off — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-I1
05/13/2024
Permit issued — Structural
Q00918235-I1-ST
04/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/15/2024
Signed off — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-I1
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
04/15/2024
Special inspection requirement — Mechanical Systems
Tianchen Hu
04/15/2024
Special inspection requirement — Final
Tianchen Hu
04/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
04/09/2024
Filed — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-P1
03/18/2024
Special inspection requirement — Structural Steel - Details
Jose Santos
03/18/2024
Special inspection requirement — Final
Juan Ramos
03/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
03/14/2024
Filed — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-P1
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-P1
02/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
02/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
02/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
02/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
02/06/2024
Special inspection requirement — Final
Juan Ramos
02/06/2024
Special inspection requirement — Structural Steel - Details
Jose Santos
02/01/2024
Filed — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-I1
02/01/2024
Permit issued — Mechanical Systems
Q00998545-I1-MS
01/31/2024
Permit issued — General Construction
Q00883869-I1-GC
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/29/2023
Violation issued (HPD, open)
I
11/16/2023
Permit issued — Plumbing
Q00889830-I1-PL
11/02/2023
Permit issued — General Construction
Q00883869-I1-GC
09/14/2023
Filed — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-I1
09/06/2023
Objection resolved — Addressed
09/06/2023
Objection resolved — Addressed
08/22/2023
Objection raised — Other
08/22/2023
Objection raised — Scope
08/04/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
07/02/2023
Objection raised — Admin
06/27/2023
Objection raised — Scope
06/20/2023
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-I1
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBATZ ENTERPRISES05/13/2024
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC02/01/2024
DOB NOWGeneral ConstructionPermit IssuedBATZ ENTERPRISES01/31/2024
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC11/16/2023
DOB NOWGeneral ConstructionPermit IssuedBATZ ENTERPRISES11/02/2023
1 project · most recent 12/20/2023
General Wiring
FiledStatusContractorScope
12/20/2023CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/16/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/15/2024Fire-Resistant Penetrations and JointsJose Santosspecial
07/15/2024Fire-Resistance Rated ConstructionJose Cruzprogress
07/15/2024Energy Code Compliance InspectionsJose Cruzprogress
07/15/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
06/07/2024Fire-Resistant Penetrations and JointsJose Santosspecial
06/07/2024Fire-Resistance Rated ConstructionJose Cruzprogress
06/07/2024Energy Code Compliance InspectionsJose Cruzprogress
06/07/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
04/15/2024HVAC-R and service water heating equipmentTianchen Huenergy_progress
04/15/2024Fire-Resistant Penetrations and JointsTianchen Huspecial
04/15/2024Mechanical SystemsTianchen Huspecial
04/15/2024FinalTianchen Huprogress
04/15/2024Energy Code Compliance InspectionsTianchen Huprogress
04/15/2024HVAC-R and service water heating system controlsTianchen Huenergy_progress
04/15/2024HVAC-R and service water piping design and insulationTianchen Huenergy_progress
03/18/2024Structural Steel - DetailsJose Santosspecial
03/18/2024FinalJuan Ramosprogress
03/18/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
02/13/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
02/13/2024Fire-Resistant Penetrations and JointsJose Santosspecial
02/13/2024Fire-Resistance Rated ConstructionJose Cruzprogress
02/13/2024Energy Code Compliance InspectionsJose Cruzprogress
02/06/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
02/06/2024FinalJuan Ramosprogress
02/06/2024Structural Steel - DetailsJose Santosspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00889830-I1Request digital key ↗
08/24/2026Q00918235-P1Request digital key ↗
08/24/2026Q00918235-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00883869-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026Q00883869-P1Open ↗
09/23/2026Q00883869-P1Open ↗
09/02/2026Q00918235-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00918235-P1Open ↗
08/24/2026Q00918235-I1Open ↗
08/23/2026Q00998545-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00883869-P1Open ↗
09/02/2026Q00918235-P1Open ↗
09/01/2026Q00883869-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00883869-I1Open ↗
08/13/2026Q00883869-P2Open ↗
08/13/2026Q00883869-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00918235-P1Open ↗
08/24/2026Q00918235-I1Open ↗
08/23/2026Q00998545-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/22/2026Q00883869-P1Open ↗
08/22/2026Q00883869-I1Open ↗
08/15/2026Q00883869-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00883869-I1Open ↗