175-44 LIBERTY AVENUE
QUEENS · South Jamaica · BIN 4217963
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
M1-2AZoning
2,580 sfGross Floor Area
2Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: Iglesia Cristiana, EL Redentor · 1,907 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 22 filings
Floor 14 filings
Cellar3 filings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/17/2023$920K—Private party → IGLESIA CRISTIANA,EL REDENTOR,INC.$357/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
F360 Architecture406/19/2024
New Air Solution204/09/2024
Jose A. Santos P.E.P.C203/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Poseidon Expediting & Consulting SE403/21/2026
Up Design Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Batz EnterprisesGeneral Contractor307/08/2026
Kle ConstructionGeneral Contractor107/08/2026
Innovation PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292506/19/2024
New Air Solution8418204/09/2024
Building Lifecycle
All (81)Filed (8)Permit Issued (4)Signed Off (3)Violation (24)Inspection (6)Objection (9)Special Inspection (25)
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/05/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
07/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
07/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
07/05/2024
Objection resolved — Addressed
07/03/2024
Objection raised — Scope
06/19/2024
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-P2
06/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
06/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
05/23/2024
Signed off — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-I1
05/23/2024
Signed off — Alteration
PROPOSE NEW TOILET ROOM @ CELLAR AND HC TOILET ROOM @ 1ST FLOOR. ALL FIXTURES ON 2ND FLOOR TO REMAIN. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
Q00889830-I1
05/13/2024
Permit issued — Structural
Q00918235-I1-ST
04/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/15/2024
Signed off — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-I1
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
04/15/2024
Special inspection requirement — Mechanical Systems
Tianchen Hu
04/15/2024
Special inspection requirement — Final
Tianchen Hu
04/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
04/09/2024
Filed — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-P1
04/09/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00883869-I1-GC
03/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
03/18/2024
Special inspection requirement — Structural Steel - Details
Jose Santos
03/18/2024
Special inspection requirement — Final
Juan Ramos
03/14/2024
Filed — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-P1
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-P1
02/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
02/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
02/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
02/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
02/06/2024
Special inspection requirement — Final
Juan Ramos
02/06/2024
Special inspection requirement — Structural Steel - Details
Jose Santos
02/01/2024
Filed — Alteration
PROPOSED TO REPLACE THE EXITING ROOFTOP W/ NEW SPLIT AIR CONDITIONING SYSTEM ON FIRST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00998545-I1
02/01/2024
Permit issued — Mechanical Systems
Q00998545-I1-MS
01/31/2024
Permit renewed — General Construction
Renewed without changes
Q00883869-I1-GC
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/29/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
11/16/2023
Permit issued — Plumbing
Q00889830-I1-PL
11/02/2023
Permit issued — General Construction
Q00883869-I1-GC
09/14/2023
Filed — Alteration
PROPOSE TO INSTALL STRUCTURAL MEMBERS TO SUPPORT THE EXISTING STRUCTURE AND REMOVE THE REAR PARTITION AS PER PLANS SUBMITTED HEREWITH.
Q00918235-I1
09/06/2023
Objection resolved — Addressed
08/22/2023
Objection raised — Other
08/22/2023
Objection raised — Scope
08/04/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
07/02/2023
Objection raised — Admin
06/27/2023
Objection raised — Scope
06/20/2023
Filed — Alteration CO
PROPOSE TO CONVERTI 1ST FLOOR FROM STORE/ OFFICE TO COMMUNITY FACILITY (ASSEMBLY PURPOSES WITH OCCUPANT LOAD FEWER THAN 75 PERSONS AND 2ND FLOOR TO BE CONVERTED FROM RESIDENTIAL UNIT TO BIBLE STUDY ROOMS TO BE USED IN ACCESSORY TO COMMUNITY FACILITY BELOW
Q00883869-I1
06/16/2023
Filed — Alteration
PROPOSE NEW TOILET ROOM @ CELLAR AND HC TOILET ROOM @ 1ST FLOOR. ALL FIXTURES ON 2ND FLOOR TO REMAIN. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
Q00889830-I1
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Batz Enterprises—
DOB NOW—Kle Construction—
DOB NOW—Batz Enterprises—
DOB NOW—Innovation Plumbing—
DOB NOW—Batz Enterprises—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00889830-I1Request the plans ↗
08/24/2026Q00918235-P1Request the plans ↗
08/24/2026Q00918235-I1Request the plans ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00883869-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026Q00883869-P1Open ↗
09/23/2026Q00883869-P1Open ↗
09/02/2026Q00918235-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00918235-P1Open ↗
08/24/2026Q00918235-I1Open ↗
08/23/2026Q00998545-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00883869-P1Open ↗
09/02/2026Q00918235-P1Open ↗
09/01/2026Q00883869-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00883869-I1Open ↗
08/13/2026Q00883869-P2Open ↗
08/13/2026Q00883869-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00918235-P1Open ↗
08/24/2026Q00918235-I1Open ↗
08/23/2026Q00998545-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/22/2026Q00883869-P1Open ↗
08/22/2026Q00883869-I1Open ↗
08/15/2026Q00883869-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00883869-I1Open ↗