Elevator cooperative
Concord Village
175 ADAMS STREET · BIN 3325912
💬 Discuss this project
1950Year Built
15Stories
D4Building Class
R7-1Zoning
883,265 sfGross Floor Area
1,026Units
LL97 CoveredRent Stabilized26 Open Violations 23 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: CONCORD VILLAGE OWNERS INC · 313,647 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 17 docs
Floor 11Under Construction3p · 1 filing · 4 docs
Floor 10
Floor 9
Floor 82p · 1 filing · 15 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES2108/06/2026
CONCORD VILLAGE OWNERS3903/22/2026
BEST ENERGY POWER 2015 LL103/22/2026
CONCORD VILLAGE ASSOCIATES903/21/2026
QUANTUM DESIGN103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
TINDEL REPLACEMENT WINDOWGeneral Contractor407/08/2026
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
CROSSFIELD PLBG.&HTGPlumbing207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
KCM PLUMBING & HEATING COPlumbing207/08/2026
INTELOGIC ELECTRIC INC 003404General Contractor203/22/2026
JUNO CONTRACTING CORPGeneral Contractor203/21/2026
JEONG YUNGElectrical203/21/2026
REG-ED CONSTRUCTION INCGeneral Contractor203/21/2026
HERTLER NADILE P & H, INCPlumbing107/08/2026
RICHMOND PLBG & HEATINGPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
TEC PLUMBING CORPPlumbing107/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
JUBILEE ELEC'L SERVICE COElectrical103/22/2026
K & R ELECTRIC CO., INC.Electrical103/22/2026
RICHARD GRIMAElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
AUROUS CONSTRUCTION COLL*General Contractor104/09/2026
NYC NEWLINE CONTRACTORSGeneral Contractor107/08/2026
REDLINE CONSTR & MGMT LLCGeneral Contractor108/06/2026
REDLINE CONSTRUCTION & MAGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MALETZ DESIGN3250205/27/2025
JAMES A CLANCY9176104/15/2025
MOORE ASSOCIATES, LLC3408212/13/2021
BATLIBOI STUDIO / ARCHITE7658111/09/2021
URBAN PIONEERING ARCHITEC6521111/25/2019
Building Lifecycle
All (183)Filed (23)Permit Issued (18)Signed Off (12)Facade (FISP) (15)Violation (45)Inspection (11)Objection (29)Special Inspection (30)
08/25/2026
Filed — Alteration
Renovation of existing 9th floor apartments to combine units# D & E. Work to include new partitions, New finishes & lighting throughout. No change in use, egress or occupancy.
B01450592-S1
08/25/2026
Filed — Alteration
Renovation of existing 9th floor apartments to combine units# D & E. Work to include new partitions, New finishes & lighting throughout. No change in use, egress or occupancy.
B01450592-I1
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/24/2026
Special inspection requirement — Lighting controls
08/24/2026
Special inspection requirement — Interior lighting power
08/24/2026
Special inspection requirement — Final
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
08/18/2026
Signed off — Alteration
Complete window replacement throughout, no change to use, egress or occupancy.
B00791166-I1
08/05/2026
Permit issued — General Construction
B01277801-I1-GC
07/16/2026
Special inspection requirement — Fenestration areas
VINCENT ORTIZ
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
VINCENT ORTIZ
07/16/2026
Special inspection requirement — Final
VINCENT ORTIZ
07/16/2026
Special inspection requirement — Fenestration air leakage
VINCENT ORTIZ
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
VINCENT ORTIZ
04/17/2026
Signed off — Alteration
renovation of existing 8th fl apts to combine unit# D & E; work to include new partitions and finishes. no change in use, egress or occupancy.
B01169785-I1
04/17/2026
Signed off — Alteration
renovation of existing 8th fl apts to combine unit# D & E; work to include new partitions and finishes. no change in use, egress or occupancy.
B01169785-S1
01/18/2026
Objection resolved — Addressed
12/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Objection raised — Scope
11/25/2025
Objection raised — Admin
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Scope
11/22/2025
Filed — Alteration
Complete window replacement throughout, no change to use, egress or occupancy.
B00791166-P2
10/31/2025
Violation issued (ECB, open)
Construction
10/21/2025
Objection resolved — Addressed
10/15/2025
Cycle 10 facade report signed — SAFE
10/08/2025
Objection resolved — Addressed
10/08/2025
Objection resolved — Addressed
10/08/2025
Objection resolved — Addressed
10/08/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Other
09/26/2025
Objection raised — Scope
09/26/2025
Objection raised — Cost
09/26/2025
Objection raised — Scope
09/26/2025
Objection raised — Other
09/23/2025
Signed off — Alteration
B01116656-I1
09/17/2025
Filed — Alteration
COMBINE UNITS 11G AND 11H ON 11TH FLOOR PER TPPN 3/1997, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01277801-I1
09/05/2025
Violation issued (ECB, open)
Construction
09/05/2025
Violation issued (ECB, closed)
Construction
09/05/2025
Violation issued (ECB, closed)
Construction
09/05/2025
Violation issued (ECB, open)
Construction
09/05/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/04/2025
Cycle 10 facade report submitted
08/26/2025
Special inspection requirement — Final
Esther Cheung
07/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01061524-I1
07/08/2025
Cycle 10 facade inspection completed
07/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH MALETZ
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIZABETH MALETZ
06/05/2025
Special inspection requirement — Lighting controls
ELIZABETH MALETZ
06/05/2025
Special inspection requirement — Interior lighting power
ELIZABETH MALETZ
06/05/2025
Special inspection requirement — Final
ELIZABETH MALETZ
06/03/2025
Permit issued — Sidewalk Shed
B01061524-I1-SH
05/27/2025
Filed — Alteration
renovation of existing 8th fl apts to combine unit# D & E; work to include new partitions and finishes. no change in use, egress or occupancy.
B01169785-P2
05/27/2025
Filed — Alteration
renovation of existing 8th fl apts to combine unit# D & E; work to include new partitions and finishes. no change in use, egress or occupancy.
B01169785-P1
04/22/2025
Permit issued — Solar
B01113560-I1-SL
04/15/2025
Filed — Alteration
Installation of PV System on existing roof top. No changes to the use egress or occupancy.
B01113560-I1
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedREDLINE CONSTR & MGMT LLC08/05/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/03/2025
DOB NOWSolarPermit IssuedBEST ENERGY POWER 2015 LL04/22/2025
DOB NOWGeneral ConstructionSigned-offAUROUS CONSTRUCTION COLL*03/05/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/03/2025
DOB NOWGeneral ConstructionSigned-offREDLINE CONSTRUCTION & MA01/27/2025
DOB NOWGeneral ConstructionSigned-offTINDEL REPLACEMENT WINDOW01/14/2025
DOB NOWGeneral ConstructionSigned-offTINDEL REPLACEMENT WINDOW09/09/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/06/2024
DOB NOWPlumbingSigned-offRICHMOND PLBG & HEATING01/11/2024
DOB NOWGeneral ConstructionSigned-offNYC NEWLINE CONTRACTORS09/07/2022
DOB NOWPlumbingSigned-offTEC PLUMBING CORP12/10/2021
DOB NOWGeneral ConstructionSigned-offREG-ED CONSTRUCTION INC11/24/2021
DOB NOWPlumbingSigned-offHERTLER NADILE P & H, INC09/28/2021
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO10/21/2020
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO02/13/2020
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING08/29/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/08/2019
BISOTISSUEDREDLINE CONSTRUCTION & MA11/15/2019
BISOTISSUEDJUNO CONTRACTING CORP05/13/2019
BISMHISSUEDSYSTEMS 2000 PLUMBING SER01/18/2019
BISFSISSUEDCHAMPION COMBUSTION CORP12/10/2018
BISPLISSUEDHERTLER NADILE P & H, INC03/02/2016
BISOTISSUEDESPACE PLUS INC02/26/2016
BISOTISSUEDPRESPA CONTRACTING INC12/01/2015
BISOTISSUEDRITE-WAY WOOD-CRAFTS CO03/26/2014
BISMHISSUEDAIR DEPOT COMM. REFR. COR02/25/2014
BISPLISSUEDAMERITALIA PLBG & HTG COR09/24/2013
BISPLISSUEDHENRY MYERS P & H, INC05/24/2012
BISOTISSUEDDE WAL INC05/07/2012
BISEQISSUEDBRENMAC CONSTRUCTION INC04/05/2012
BISOTISSUEDDE WAL INC03/09/2012
BISOTISSUEDKAY WATERPROOFING CORP02/17/2012
BISPLISSUEDAMERITALIA PLBG & HTG COR10/17/2011
BISOTISSUEDKAY WATERPROOFING CORP08/16/2011
BISEQISSUEDBRENMAC CONSTRUCTION INC06/27/2011
BISOTISSUEDEAST RIVER CONTRACTING CORP06/02/2009
BISOTISSUEDEAST RIVER CONTRACTING CORP10/16/2006
BISEQISSUEDJ & G GEN CONT06/06/2006
BISOTISSUEDRCD RESTORATIONS INC05/19/2006
+ 10 more permits on file
1 project · most recent 08/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/25/2026——Gas, Water/Sanitary
19 projects · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025CompleteBERGER QUALITY ELEC'L CON—
03/06/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
06/18/2024CompleteBOROWIDE ELECT'L CONTR'S—
01/15/2024CompleteHIGH BEAM ELECTRIC CORP.General Wiring
05/11/2022Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
01/25/2022Permit IssuedMATIA ELECTRICAL CORPGeneral Wiring
01/11/2022Permit IssuedFRIED ELECTRIC CO.General Wiring
11/10/2021CompleteJ.A. LEE ELEC SVCS LLC—
06/21/2021Permit IssuedRIDGE ELECTRIC CORP.General Wiring
05/17/2021Permit IssuedRIDGE ELECTRIC CORP.General Wiring
01/08/2021CompleteR & T ELECTRICAL CORP—
10/13/2020CompleteK & R ELECTRIC CO., INC.General Wiring
06/19/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/04/2019CompleteJUBILEE ELEC'L SERVICE CO—
04/08/2019CompleteJUBILEE ELEC'L SERVICE CO—
1 project · most recent 04/15/2025
FiledStatusContractorScope
04/15/2025Permit IssuedBEST ENERGY POWER 2015 LL152 panels, 63.84 kw, 50,400 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and Joints—special
08/24/2026Fire-Resistant Penetrations and Joints—special
08/24/2026Lighting controls—energy_progress
08/24/2026Interior lighting power—energy_progress
08/24/2026Final—progress
08/24/2026Energy Code Compliance Inspections—progress
07/16/2026Fenestration areasVINCENT ORTIZenergy_progress
07/16/2026Energy Code Compliance InspectionsVINCENT ORTIZprogress
07/16/2026FinalVINCENT ORTIZprogress
07/16/2026Fenestration air leakageVINCENT ORTIZenergy_progress
07/16/2026Fenestration and door U-factor and product ratingsVINCENT ORTIZenergy_progress
08/26/2025FinalEsther Cheungprogress
06/05/2025Fire-Resistant Penetrations and JointsELIZABETH MALETZspecial
06/05/2025Energy Code Compliance InspectionsELIZABETH MALETZprogress
06/05/2025Lighting controlsELIZABETH MALETZenergy_progress
06/05/2025Interior lighting powerELIZABETH MALETZenergy_progress
06/05/2025FinalELIZABETH MALETZprogress
09/18/2024Air barrier - visual inspectionJames Clancyenergy_progress
09/18/2024Fire-Resistant Penetrations and JointsJames Clancyspecial
09/18/2024Structural Stability – Alterations of existing buildingsJames Clancyspecial
09/18/2024Energy Code Compliance InspectionsJames Clancyprogress
09/18/2024FinalJames Clancyprogress
08/02/2022FinalEsther Cheungprogress
12/14/2021HVAC-R and service water piping design and insulationJAMES MOOREenergy_progress
12/14/2021Energy Code Compliance InspectionsJAMES MOOREprogress
Latest 25 of 38.
▾Documents — 321 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
09/01/2026B00561366-I1Request digital key ↗
09/01/2026B00595071-P1Request digital key ↗
09/01/2026B00595071-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00472892-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00190874-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00134697-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00212865-I1Request digital key ↗
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION19
11/15/2019340697632Open ↗
11/06/2019340697632Open ↗
05/15/2019321800495Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
11/06/2019340697632Open ↗
04/27/2019340674513Open ↗
10/04/2018321837321Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026B00190874-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/02/2026B00134697-I1Open ↗
09/01/2026B00561366-I1Open ↗
09/01/2026B00472892-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
05/24/2019321762099Open ↗
05/15/2019321800495Open ↗
03/26/2019321762099Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/25/2026B01277801-I1Open ↗
09/02/2026B00791166-I1Open ↗
09/02/2026B00791166-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/04/2018321837321Open ↗
06/14/2018321762099Open ↗
12/05/2015321280056Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/06/2019340697632Open ↗
04/27/2019340674513Open ↗
10/04/2018321837321Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01169785-I1Open ↗
08/27/2026B01113560-I1Open ↗
08/25/2026B00626779-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/06/2019340697632Open ↗
04/27/2019340674513Open ↗
02/20/2014340114851Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/06/2019340697632Open ↗
04/27/2019340674513Open ↗
02/20/2014340114851Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/08/2013320781365Open ↗
03/05/2012320444042Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE APPLICATION-PERMIT4
12/19/2014320781365Open ↗
12/19/2014320781365Open ↗
12/19/2014320781365Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/20/2014340114851Open ↗
03/05/2012320444042Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
06/12/2014320372459Open ↗
07/02/2012320444042Open ↗
06/20/2012320444042Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/24/2016321315965Open ↗
11/04/2015321265046Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/04/2018321837321Open ↗
▸BISEQUIPMENT USE PERMITS1
12/18/2014320781365Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes6
10/04/2018321837321Open ↗
07/09/2018321800495Open ↗
07/09/2018321800495Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00212865-I1Open ↗
08/13/2026B00190874-I1Open ↗
▸BISSTREET TREE CHECKLIST1
11/06/2019340697632Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/01/2026B00561366-I1Open ↗
09/01/2026B00472892-I1Open ↗
09/01/2026B00595071-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
11/06/2019340697632Open ↗
10/04/2018321837321Open ↗
07/09/2018321800495Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/15/2019321800495Open ↗
03/26/2019321762099Open ↗
06/14/2018321762099Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/23/2020321800495Open ↗
03/26/2019321762099Open ↗
04/11/2016321315965Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/23/2020321800495Open ↗
11/19/2020340697632Open ↗
11/06/2019340697632Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
12/19/2014320781365Open ↗
12/19/2014320781365Open ↗
03/26/2014340114851Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/06/2019340697632Open ↗
02/20/2014340114851Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00595071-I1Open ↗
08/13/2026B00626779-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/19/2020340697632Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/05/2012320444042Open ↗
▸BISNYCECC ANALYSIS1
11/06/2019340697632Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/23/2020321800495Open ↗
11/19/2020340697632Open ↗
11/06/2019340697632Open ↗
Showing 3 of 4 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/19/2019321837321Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
11/23/2020321800495Open ↗
11/19/2020340697632Open ↗
07/19/2019321837321Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
02/24/2016321315965Open ↗
12/05/2015321280056Open ↗
11/04/2015321265046Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2014320372459Open ↗
01/07/2013320444042Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
01/07/2013320444042Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT25
11/23/2020321800495Open ↗
11/06/2019340697632Open ↗
07/19/2019321837321Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/19/2020340697632Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET11
09/18/2018321837321Open ↗
07/09/2018321800495Open ↗
06/13/2018321762099Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION7
11/08/2019340697632Open ↗
04/27/2019340674513Open ↗
07/28/2015340114851Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
07/19/2019321837321Open ↗
06/19/2019321837321Open ↗
05/24/2019321762099Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/06/2019340697632Open ↗
04/27/2019340674513Open ↗
02/20/2014340114851Open ↗