← Back
Elevator cooperative
Concord Village
175 ADAMS STREET · BIN 3325915
💬 Discuss this project
1950Year Built
15Stories
D4Building Class
R7-1Zoning
883,265 sfGross Floor Area
1,026Units
LL97 CoveredRent Stabilized27 Open Violations 24 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: CONCORD VILLAGE OWNERS INC · 313,647 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 8 docs
Floor 8Under Construction5p · 1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES2109/17/2026
KINGS GROUP NY907/08/2026
JUNO CONTRACTING203/22/2026
NGE REST CORP103/22/2026
OWENR OF 175 ADAMS ST103/22/2026
CONCORD VILLAGES OWNERS3503/22/2026
QUANTUM DESIGN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
RIGHT WAY SERVICES NYC203/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TINDEL REPLACEMENT WINDOWGeneral Contractor903/21/2026
KINGS GROUP NY CORPGeneral Contractor507/08/2026
P & A INTERIOR RENOVATIONGeneral Contractor407/08/2026
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
CONSTRUCTION XPERT INCGeneral Contractor303/21/2026
MODERN CONCEPT RENOV INCGeneral Contractor209/17/2026
BERGER QUALITY ELEC'L CONElectrical203/22/2026
APOLLO ELECTRIC NYG, INCElectrical103/22/2026
VILLAGE P & H NY INCPlumbing107/08/2026
GALLANT ELEC'L CONST, INCElectrical103/22/2026
K & R ELECTRIC CO., INC.Electrical103/22/2026
RICHARD GRIMAElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
JNR PLUMBING INC DBAPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE RAJIV INC9613103/31/2026
JAMES A CLANCY9176102/21/2025
MSM ENGINEERING SERVICES,8449207/20/2023
Building Lifecycle
All (149)Filed (14)Permit Issued (16)Signed Off (8)Facade (FISP) (12)Violation (57)Inspection (5)Objection (16)Special Inspection (21)
09/16/2026
Permit issued — General Construction
B01379039-I1-GC
08/28/2026
Permit issued — Plumbing
B01379039-S1-PL
08/18/2026
Filed — Alteration
B01427879-I1
08/18/2026
Signed off — Alteration
B00791152-I1
07/09/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
07/08/2026
Special inspection requirement — Final
Esther Cheung
06/24/2026
Objection resolved — Addressed
06/08/2026
Filed — Alteration
PROPOSED COMBINATION OF APT 8A AND 8B WITH PROPOSED INTERIOR RENOVATIONS. REPLACE AND RELOCATE KITCHEN CABINETS, COUNTERS AND PLUMBING FIXTURES. RENOVATE EXISTING BATHROOMS. REPLACE ALL FINISHES IN AFFECTED AREAS. NEW LIGHTING WORK.
B01379039-S1
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Inspections
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — DPL-1
05/19/2026
Permit issued — General Construction
B01379039-I1-GC
05/01/2026
Filed — Alteration
COMBINATION OF DWELLING UNITS 11C AND 11D ON 11TH FLOOR, PER TPPN 3/1997. REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01396021-I1
05/01/2026
Special inspection requirement — Final
Esther Cheung
04/30/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
03/31/2026
Filed — Alteration
PROPOSED COMBINATION OF APT 8A AND 8B WITH PROPOSED INTERIOR RENOVATIONS. REPLACE AND RELOCATE KITCHEN CABINETS, COUNTERS AND PLUMBING FIXTURES. RENOVATE EXISTING BATHROOMS. REPLACE ALL FINISHES IN AFFECTED AREAS. NEW LIGHTING WORK.
B01379039-I1
03/17/2026
Signed off — Alteration
Installation of PV System on existing roof top. No changes to the use egress or occupancy.
B01113563-I1
04/25/2025
Signed off — Alteration
B01060925-I1
03/05/2025
Permit issued — Solar
B01113563-I1-SL
02/21/2025
Filed — Alteration
Installation of PV System on existing roof top. No changes to the use egress or occupancy.
B01113563-I1
01/13/2025
Permit issued — General Construction
B00791152-I1-GC
01/02/2025
Violation issued (ECB, closed)
Construction
12/31/2024
Permit issued — General Construction
B00791152-I1-GC
12/12/2024
Permit issued — General Construction
B00791152-I1-GC
09/18/2024
Special inspection requirement — Final
James Clancy
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
09/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
09/18/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
09/09/2024
Signed off — Alteration
B01044294-I1
06/06/2024
Filed — Alteration
B01060925-I1
06/06/2024
Permit issued — Sidewalk Shed
B01060925-I1-SH
05/31/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/24/2024
Permit issued — General Construction
B01044294-I1-GC
05/16/2024
Filed — Alteration
B01044294-I1
03/08/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2023
Permit issued — Plumbing
B00893219-S1-PL
07/29/2023
Permit issued — General Construction
B00893219-I1-GC
07/25/2023
Objection raised — Scope
07/25/2023
Objection resolved — Addressed
07/20/2023
Filed — Alteration
Propose plumbing work at partial 3rd floor Apt#3A as per plans. No change in use, egress, or occupancy.
B00893219-I1
07/20/2023
Filed — Alteration
Propose plumbing work at partial 3rd floor Apt#3A as per plans. No change in use, egress, or occupancy.
B00893219-S1
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
07/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
06/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
06/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
06/21/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
06/21/2023
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
02/18/2023
Filed — Alteration
B00791152-I1
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMODERN CONCEPT RENOV INC09/16/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC08/28/2026
DOB NOWGeneral ConstructionPermit IssuedMODERN CONCEPT RENOV INC05/19/2026
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL03/05/2025
DOB NOWGeneral ConstructionSigned-offTINDEL REPLACEMENT WINDOW01/13/2025
DOB NOWGeneral ConstructionSigned-offTINDEL REPLACEMENT WINDOW12/31/2024
DOB NOWGeneral ConstructionSigned-offTINDEL REPLACEMENT WINDOW12/12/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/06/2024
DOB NOWGeneral ConstructionSigned-offP & A INTERIOR RENOVATION05/24/2024
DOB NOWPlumbingSigned-offJNR PLUMBING INC DBA08/21/2023
DOB NOWGeneral ConstructionSigned-offP & A INTERIOR RENOVATION07/29/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/04/2021
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION XPERT INC07/21/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP06/11/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/08/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/08/2020
BISPLISSUEDORBIT PLBG & HTG INC01/12/2017
BISOTISSUEDBIZON RUBBISH REMOVAL INC08/24/2016
BISOTISSUEDCESAR & SON CONSTRUCTION05/06/2016
BISMHISSUEDAIR DEPOT COMM. REFR. COR02/26/2014
BISOTISSUEDKAY WATERPROOFING CORP01/28/2013
BISOTISSUEDKAY WATERPROOFING CORP06/25/2012
BISEQISSUEDROCK SCAFFOLDING CORP06/15/2012
BISPLISSUEDWATER WORKS MECH LTD02/28/2011
BISOTISSUEDRITE-WAY WOOD-CRAFTS CO02/23/2011
BISOTISSUEDTOWER CONSTRUCTION NY INC09/21/2010
BISOTISSUEDRUSSO BRO INTERNATIONAL CORP07/05/2005
BISEQISSUEDNUMBER ONE JNV ENTERPRISE05/31/2005
BISPLISSUEDA-I WATERMAIN & SEWER01/24/2005
BISOTISSUEDABASI CONST12/21/2004
BIS—ISSUEDJP FENDT CONSTRUCTION & DEVELOPM02/19/2003
BISEQISSUEDSPING SCAFFOLDING09/12/2002
BISPLISSUEDLIBERTY PLUMBING INC.08/01/2002
BISOTISSUEDJ.P.FENDT CONSTRUCTION & DEVELOP04/16/2002
BISOTISSUEDVARS RESTORATION INC04/27/2001
BISEQISSUEDSPRING SCAFFOLDING INC01/26/2001
BIS—ISSUEDSTRUCTURE TONE, LLC06/05/1997
BISOTISSUEDGABE CONSTRUCTION06/28/1996
2 projects · most recent 06/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/08/2026Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
07/20/2023Signed-offJNR PLUMBING INC DBAWater/Sanitary
20 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedVMA ELECTRICAL CORP.General Wiring
08/05/2026Permit IssuedMAC ELECT'L CONTR. INC.General Wiring
11/30/2025CompleteBERGER QUALITY ELEC'L CON—
07/17/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
07/01/2025CompleteWCK ELECTRIC CORP.General Wiring
06/04/2025Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
10/30/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
06/18/2024CompleteBOROWIDE ELECT'L CONTR'S—
03/19/2024CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
03/01/2024CompleteAPOLLO ELECTRIC NYG, INC—
10/13/2023CompleteS.A.L. ELECTRIC CO INC.—
09/29/2021CompleteJ.G.C. ELECTRIC, LLCGeneral Wiring
06/21/2021Permit IssuedRIDGE ELECTRIC CORP.General Wiring
05/17/2021Permit IssuedRIDGE ELECTRIC CORP.General Wiring
01/21/2021CompleteRESPONSE ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/31/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/09/2026Lighting in dwelling unitsEsther Cheungenergy_progress
07/08/2026FinalEsther Cheungprogress
05/01/2026FinalEsther Cheungprogress
09/18/2024FinalJames Clancyprogress
09/18/2024Fire-Resistant Penetrations and JointsJames Clancyspecial
09/18/2024Structural Stability – Alterations of existing buildingsJames Clancyspecial
09/18/2024Energy Code Compliance InspectionsJames Clancyprogress
09/18/2024Air barrier - visual inspectionJames Clancyenergy_progress
07/20/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/20/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/20/2023Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
07/18/2023Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
06/21/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
06/21/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
06/21/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
06/21/2023Interior lighting powerMOHAMED MAHMOUDenergy_progress
11/25/2022FinalVINCENT ORTIZprogress
11/25/2022Fenestration and door U-factor and product ratingsVINCENT ORTIZenergy_progress
11/25/2022Fenestration areasVINCENT ORTIZenergy_progress
11/25/2022Fenestration air leakageVINCENT ORTIZenergy_progress
11/25/2022Energy Code Compliance InspectionsVINCENT ORTIZprogress
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/01/2026B00528399-I1Request digital key ↗
09/01/2026B00534044-I1Request digital key ↗
08/27/2026B00791152-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00351881-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION20
05/11/2023301499019Open ↗
09/09/2022301499019Open ↗
09/07/2022301499019Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION12
05/07/2021321070595Open ↗
05/05/2021321070595Open ↗
01/26/2017321400596Open ↗
Showing 3 of 12 on file for this type
▸BISSIDEWALK BRIDGING APPLICATION APPROVAL REQUIRED PRIOR TO PERMIT.1
05/05/2021321070595Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
11/16/2018321076697Open ↗
10/30/2018321070595Open ↗
07/10/2017321400596Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026B00791152-I1Open ↗
09/29/2026B00791152-I1Open ↗
09/29/2026B00791152-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00528399-I1Open ↗
09/01/2026B00534044-I1Open ↗
09/01/2026B00551953-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026B01113563-I1Open ↗
09/23/2026B00893219-I1Open ↗
09/23/2026B00893219-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/03/2013320781454Open ↗
06/19/2012320494657Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/03/2013320781454Open ↗
06/19/2012320494657Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/22/2021340810527Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/22/2021340810527Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/22/2021340810527Open ↗
▸Trade Schedules & Equipment11
▸BISEQUIPMENT USE APPLICATION-PERMIT4
12/19/2014320781454Open ↗
12/19/2014320781454Open ↗
12/19/2014320781454Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/16/2018321076697Open ↗
06/29/2016321400596Open ↗
▸BISSCHEDULE B - PLUMBING2
02/15/2011320270283Open ↗
08/24/2010320206380Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/12/2011320270283Open ↗
04/18/2011320270283Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
10/24/2016321400596Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
11/16/2018321076697Open ↗
10/30/2018321070595Open ↗
06/29/2016321400596Open ↗
▸BISSTREET TREE CHECKLIST1
06/29/2016321400596Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00351881-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00528399-I1Open ↗
08/27/2026B00791152-I1Open ↗
08/27/2026B00893219-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/16/2018321076697Open ↗
10/30/2018321070595Open ↗
06/29/2016321400596Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/15/2011320270283Open ↗
08/24/2010320206380Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/16/2018321076697Open ↗
10/30/2018321070595Open ↗
07/10/2017321400596Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/01/2022321070595Open ↗
07/10/2017321400596Open ↗
03/06/2017321233982Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/01/2022321070595Open ↗
05/07/2021321070595Open ↗
05/05/2021321070595Open ↗
▸BISTR8: Energy Code Progress Inspections2
12/19/2014320781454Open ↗
12/19/2014320781454Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/21/2012320477845Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00528399-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/01/2022321070595Open ↗
05/07/2021321070595Open ↗
05/05/2021321070595Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST8
12/10/2014320781454Open ↗
11/17/2014320781454Open ↗
10/22/2014320781454Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/03/2013320781454Open ↗
06/20/2012320494657Open ↗
05/16/2012320477845Open ↗
Showing 3 of 5 on file for this type
▸BISCCD1-Construction Code Determination1
07/25/2012320477845Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/30/2018321070595Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/11/2023301499019Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/22/2026B01113563-I1Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
04/01/2022321070595Open ↗
06/30/2021321070595Open ↗
04/22/2021340810527Open ↗
Showing 3 of 17 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
09/22/2010320206380Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
11/16/2018321076697Open ↗
10/30/2018321070595Open ↗
06/29/2016321400596Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
09/09/2022301499019Open ↗
06/30/2021321070595Open ↗
11/26/2018321070595Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/22/2021340810527Open ↗
08/24/2010320206380Open ↗
▸Other Documents1
▸BISSupporting Document: Fee Exempt1
05/05/2021321070595Open ↗