← Back
QUEENS
175 BEACH 30 STREET
QUEENS · BIN 4625489
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
Floor 32p · 1 filing · 12 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.206/08/2025
Building Lifecycle
All (49)Filed (2)Objection (17)Special Inspection (30)
07/13/2025
Objection raised — Zoning
07/13/2025
Objection raised — Zoning
07/13/2025
Objection raised — Zoning
07/13/2025
Objection raised — Zoning
07/13/2025
Objection raised — Zoning
06/25/2025
Objection raised — Admin
06/25/2025
Objection raised — Structural
06/25/2025
Objection raised — Structural
06/25/2025
Objection raised — Scope
06/25/2025
Objection raised — Structural
06/25/2025
Objection raised — Zoning
06/25/2025
Objection raised — Admin
06/25/2025
Objection raised — Inspections
06/25/2025
Objection raised — Scope
06/25/2025
Objection raised — Zoning
06/24/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Admin
06/08/2025
Filed — New Building
Proposed installation of temporary construction fence in conjunction with NB application # Q01211806-I1
Q01211806-S3
06/02/2025
Filed — New Building
Proposed installation of temporary construction fence in conjunction with NB application # Q01211806-I1
Q01211806-I1
04/16/2025
Special inspection requirement — Mechanical Systems
04/16/2025
Special inspection requirement — Concrete - Cast-In-Place
04/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/16/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
04/16/2025
Special inspection requirement — Heating Systems
04/16/2025
Special inspection requirement — Masonry
04/16/2025
Special inspection requirement — Subgrade Inspections
04/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/16/2025
Special inspection requirement — Final
04/16/2025
Special inspection requirement — Lowest Floor Elevation
04/16/2025
Special inspection requirement — Footing and Foundation
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
04/16/2025
Special inspection requirement — Preliminary
04/16/2025
Special inspection requirement — Structural Wood Frame
04/16/2025
Special inspection requirement — Fenestration air leakage
04/16/2025
Special inspection requirement — Maintenance information
04/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
04/16/2025
Special inspection requirement — Metering
04/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/16/2025
Special inspection requirement — Fenestration areas
04/16/2025
Special inspection requirement — Permanent certificate
04/16/2025
Special inspection requirement — Insulation placement and R values
04/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/16/2025
Special inspection requirement — Ventilation and air distribution system
04/16/2025
Special inspection requirement — Interior lighting power
04/16/2025
Special inspection requirement — Air barrier - visual inspection
04/16/2025
Special inspection requirement — Air barrier — testing
Nothing on file for this building.
1 project · most recent 06/08/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric CU-1: MXZ-SM48NAMHZ AH-1, AH-2 & AH-3: MSZ-GS09 AH-4: MSZ-GS12 48,000 BTU · Vrf Outdoor ×2
Ventilation
Panasonic FV-08VQ5 80 CFM · Exhaust Fan ×4
FV-15VQ5 150 CFM · Exhaust Fan ×2
1 project · most recent 06/08/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
06/08/2025——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 06/08/2025
Concrete Masonry Wood
FiledStatusContractorScope
06/08/2025——Concrete, Masonry, Wood
1 project · most recent 06/08/2025
Fence
FiledStatusContractorScope
06/08/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/16/2025Mechanical Systems—special
04/16/2025Concrete - Cast-In-Place—special
04/16/2025Excavations - Sheeting, Shoring, and Bracing—special
04/16/2025Fire-Resistant Penetrations and Joints—special
04/16/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/16/2025Heating Systems—special
04/16/2025Masonry—special
04/16/2025Subgrade Inspections—special
04/16/2025Subsurface Investigations (Borings/Test Pits)—special
04/16/2025Final—progress
04/16/2025Lowest Floor Elevation—progress
04/16/2025Footing and Foundation—progress
04/16/2025Energy Code Compliance Inspections—progress
04/16/2025Fire-Resistance Rated Construction—progress
04/16/2025Preliminary—progress
04/16/2025Structural Wood Frame—progress
04/16/2025Fenestration air leakage—energy_progress
04/16/2025Maintenance information—energy_progress
04/16/2025HVAC-R and service water heating system controls—energy_progress
04/16/2025Fenestration and door U-factor and product ratings—energy_progress
04/16/2025Metering—energy_progress
04/16/2025HVAC-R and service water piping design and insulation—energy_progress
04/16/2025Fenestration areas—energy_progress
04/16/2025Permanent certificate—energy_progress
04/16/2025Insulation placement and R values—energy_progress
Latest 25 of 32.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/14/2026Q01211806-S3Request digital key ↗
08/14/2026Q01211806-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01211806-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01211806-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01211806-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01211806-S3Open ↗
08/20/2026Q01211806-I1Open ↗
08/20/2026Q01211806-S4Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01211806-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q01211806-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01211806-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01211806-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01211806-I1Open ↗