| Owner | Filings | Most Recent |
|---|---|---|
| 99 EVERGREEN | 37 | 04/09/2026 |
| BONLAND INDUSTRIES | 3 | 03/21/2026 |
| 2500 PARK AVENUE | 1 | 03/21/2026 |
| SHLEPPERS | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/20/2026 | $9.8M | — | 99 EVERGREEN LLC → TERRENO CANAL STREET LLC | $252/sf building |
| 09/19/2019 | $11.6M | — | 185 CSW REALTY LLC → 99 EVERGREEN, LLC | $299/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| KCE CONSULTING ENGINEERING PLLC | 2 | 02/11/2026 |
| KUSHNER STUDIOS | 4 | 06/19/2023 |
| MCLAREN ENGINEERING GROUP | 6 | 02/01/2023 |
| ASDA ARCHITECTURE + DESIGN | 2 | 04/19/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| KUSHNER STUDIOS | 12 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SERVICE SIGN ERECTORS | Scaffold | 2 | 07/08/2026 |
| EQUATORIAL RENOVATIONS CO | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| KCE CONSULTING ENGINEERIN | 3712 | 2 | 02/11/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | SERVICE SIGN ERECTORS CO | 04/23/2021 |
| DOB NOW | Sign | Signed-off | SERVICE SIGN ERECTORS CO | 04/23/2021 |
| DOB NOW | Structural | Signed-off | EQUATORIAL RENOVATIONS | 03/11/2020 |
| BIS | OT | ISSUED | EQUATORIAL RENOVATIONS CO | 03/11/2020 |
| BIS | MH | ISSUED | BONLAND INDUSTRIES | 11/14/2007 |
| BIS | PL | ISSUED | D.D.S. MECH PBG&HTG CORP | 10/09/2007 |
| BIS | OT | ISSUED | BONLAND INDUSTRIES | 04/27/2007 |
| BIS | OT | ISSUED | BONLAND INDUSTRIES | 10/31/2006 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/19/2023 | — | — | Associated Ducts and Piping, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/19/2023 | — | — | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/12/2026 | Structural Wood Frame | Kemba Walcott | progress |
| 02/12/2026 | Structural Steel - Welding | Kemba Walcott | special |
| 02/12/2026 | Concrete - Cast-In-Place | Kemba Walcott | special |
| 02/12/2026 | Masonry | Kemba Walcott | special |
| 02/12/2026 | Wood – Seismic Resistance | Kemba Walcott | special |
| 02/12/2026 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |
| 02/12/2026 | Structural Steel - Details | Kemba Walcott | special |
| 02/12/2026 | Subgrade Inspections | Kemba Walcott | special |
| 02/12/2026 | Structural Steel - High Strength Bolting | Kemba Walcott | special |
| 02/12/2026 | Post-installed Anchors | Kemba Walcott | special |
| 02/12/2026 | Final | Kemba Walcott | progress |
| 02/11/2026 | Concrete - Cast-In-Place | Kemba Walcott | special |
| 02/11/2026 | Masonry | Kemba Walcott | special |
| 02/11/2026 | Post-installed Anchors | Kemba Walcott | special |
| 02/11/2026 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |
| 02/11/2026 | Structural Steel - High Strength Bolting | Kemba Walcott | special |
| 02/11/2026 | Structural Steel - Welding | Kemba Walcott | special |
| 02/11/2026 | Subgrade Inspections | Kemba Walcott | special |
| 02/11/2026 | Structural Steel - Details | Kemba Walcott | special |
| 02/11/2026 | Wood – Seismic Resistance | Kemba Walcott | special |
| 02/11/2026 | Final | Kemba Walcott | progress |
| 02/11/2026 | Structural Wood Frame | Kemba Walcott | progress |
| 07/12/2023 | Insulation placement and R values | — | energy_progress |
| 07/12/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 07/12/2023 | Fire-Resistance Rated Construction | — | progress |