3 Open Violations 1 unresolved · 2 paperwork only ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 8 docs
Floor 38Under Construction2p · 1 filing
Floor 37Under Construction1p · 1 filing · 9 docs
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20Under Construction1 filing
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Under Construction1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction6p · 5 filings · 2 docs
CellarUnder Construction5p · 4 filings · 9 docs
Site & exteriorUnder Construction4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST82OWNER15209/13/2026
LEVINE BUILDERS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPRING SCAFFOLDING LLC2203/21/2026
RIZZO GROUP2603/21/2026
PATUXENT ENGINEERING1203/21/2026
UNITED SAFETY CONSULTANTS1203/21/2026
EUROCELT EXPEDITING, INC603/21/2026
LOMBARDO BUILDING CONSULTANTS603/21/2026
DOMANI CONSULTING403/21/2026
GRS CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor3608/25/2026
J.E. LEVINE BUILDER INCGeneral Contractor2208/14/2026
KG SPRINKLER CORPFire Protection607/08/2026
DEFALCO CONSTRUCTION INCGeneral Contractor607/08/2026
NORTHEAST MASONRY & RESTOGeneral Contractor607/08/2026
DONATO PLUMBING GROUP INCPlumbing407/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing207/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor207/08/2026
DELCO ELECTRICAL CORP.Electrical203/22/2026
WALSH FACADE SERVICES INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871604/30/2026
LANGAN ENG, ENV, SURVEYIN1265910/02/2025
SURFACE DESIGN PROFESSION3968103/19/2025
WSP USA CORP1848203/19/2025
VILLA PEX CONSULTING ENGI8408102/11/2025
Building Lifecycle
All (228)Filed (73)Permit Issued (70)Signed Off (8)Violation (8)Inspection (25)Objection (14)Special Inspection (30)
08/24/2026
Permit issued — Sidewalk Shed
M01190163-I1-SH
08/13/2026
Permit issued — Curb Cut
M01428750-I1-CC
08/12/2026
Permit issued — Sidewalk Shed
M01119945-I1-SH
07/27/2026
Filed — Alteration
Herewith filing curb cut on East 82nd Street. Work in conjunction with New Building #M00995463-I1, and BPP application #141025469.
M01428750-I1
07/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/15/2026
Filed — Alteration
INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01189728-P5
05/26/2026
Permit issued — Sidewalk Shed
M01190163-I1-SH
05/13/2026
Signed off — Alteration
M01193725-I1
05/13/2026
Signed off — Alteration
Installation and use of temporary exterior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.
M01191832-I1
05/07/2026
Permit issued — Boiler Equipment
M01099682-I1-BE
05/06/2026
Filed — Alteration
INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01189728-P4
05/05/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
05/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/01/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/30/2026
Filed — Alteration
Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
M01029556-P2
04/29/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/14/2026
Filed — Alteration
INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01189728-P3
04/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/06/2026
Filed — New Building
HEREWITH FILING ERECTION OF NEW RESIDENTIAL BUILDING (tax lot 31).
M00995463-S6
04/06/2026
Permit issued — Protection and Mechanical Methods
M00995463-S6-PMM
03/24/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
03/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/27/2026
Permit issued — Sidewalk Shed
M01190163-I1-SH
02/27/2026
Permit issued — Protection and Mechanical Methods
M01119945-S2-PMM
02/27/2026
Permit issued — Supported Scaffold
M01190163-S3-SF
02/27/2026
Permit issued — Protection and Mechanical Methods
M01190163-S6-PMM
02/27/2026
Permit issued — Protection and Mechanical Methods
M01190163-S2-PMM
02/27/2026
Permit issued — Construction Fence
M01190163-S1-FN
02/27/2026
Permit issued — Protection and Mechanical Methods
M01190163-S4-PMM
02/27/2026
Permit issued — Protection and Mechanical Methods
M01190163-S5-PMM
02/27/2026
Permit issued — Construction Fence
M01119945-S1-FN
02/17/2026
Permit issued — Standpipe
M01178285-I1-EW-SD
02/10/2026
Filed — Alteration
M01139260-P2
02/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/05/2026
Permit issued — Protection and Mechanical Methods
M01139260-I1-PMM
01/04/2026
Violation issued (ECB, closed)
Unknown
12/31/2025
Violation issued (ECB, open)
Construction
12/18/2025
Filed — Alteration
Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
M01029556-P1
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
12/15/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
12/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
12/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEED BEAM/OVERHEAD PROTECTION.AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE NEED BEAM SYSTEM/OVERHEAD PROTECTION AT THE NORTH ELEVATION ON THE 8TH FLOOR OVER THE NORTH NEIGHBOR BUILDING.
M01190163-P9
12/08/2025
Filed — Alteration
INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01189728-P2
12/05/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEED BEAM/OVERHEAD PROTECTION.AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE NEED BEAM SYSTEM/OVERHEAD PROTECTION AT THE NORTH ELEVATION ON THE 8TH FLOOR OVER THE NORTH NEIGHBOR BUILDING.
M01190163-P8
11/13/2025
Permit issued — Structural
M01020970-I1-ST
11/13/2025
Permit issued — Mechanical Systems
M01029261-I1-MS
11/12/2025
Permit issued — General Construction
M00995463-I1-GC
11/12/2025
Permit issued — Mechanical Systems
M01100574-I1-MS
11/12/2025
Permit issued — Protection and Mechanical Methods
M01276254-I1-PMM
Latest 60 of 228 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/24/2026
DOB NOWCurb CutPermit IssuedJ.E. LEVINE BUILDER INC08/13/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/12/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/26/2026
DOB NOWBoiler EquipmentPermit IssuedFRANKIE PLBG & HTG L.L.C05/07/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedWALSH FACADE SERVICES INC04/06/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWStandpipePermit IssuedH M SPRINKLER INC02/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedUNIVERSAL BUILD SUPP LLC01/05/2026
DOB NOWStructuralPermit IssuedJ.E. LEVINE BUILDER INC11/13/2025
DOB NOWMechanical SystemsPermit IssuedJ.E. LEVINE BUILDER INC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC11/12/2025
DOB NOWMechanical SystemsPermit IssuedJ.E. LEVINE BUILDER INC11/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedJ.E. LEVINE BUILDER INC11/12/2025
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC11/07/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC11/07/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC11/07/2025
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC10/28/2025
DOB NOWSupported ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO10/28/2025
DOB NOWSuspended ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO10/27/2025
DOB NOWSuspended ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO10/27/2025
DOB NOWStructuralPermit IssuedJ.E. LEVINE BUILDER INC10/27/2025
DOB NOWSuspended ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO09/30/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC09/24/2025
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC09/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC09/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedJ.E. LEVINE BUILDER INC09/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offDEFALCO CONSTRUCTION08/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offDEFALCO CONSTRUCTION08/21/2025
DOB NOWSuspended ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO08/19/2025
DOB NOWSupported ScaffoldPermit IssuedNORTHEAST MASONRY & RESTO08/18/2025
DOB NOWCurb CutPermit IssuedJ.E. LEVINE BUILDER INC06/04/2025
+ 10 more permits on file
1 project · most recent 04/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/30/2026Permit IssuedDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
11 projects · most recent 03/26/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedVANGUARD MAINTENANCE &General Wiring, HVAC Wiring
02/23/2026Permit IssuedTOP SHELF ELECTRIC CORP—
12/16/2025Permit IssuedDELCO ELECTRICAL CORP.General Wiring
10/09/2025Permit IssuedDELCO ELECTRICAL CORP.—
10/09/2025Permit IssuedDELCO ELECTRICAL CORP.—
04/24/2025Permit IssuedDELCO ELECTRICAL CORP.—
04/15/2025Permit IssuedROBERT B SAMUELS, INCGeneral Wiring
02/26/2025Permit IssuedDELCO ELECTRICAL CORP.—
02/13/2025Permit IssuedDELCO ELECTRICAL CORP.3 meters, 3 new_meters
12/20/2024Permit IssuedDELCO ELECTRICAL CORP.General Wiring
12/20/2024Permit IssuedDELCO ELECTRICAL CORP.—
2 projects · most recent 04/06/2026
Concrete
FiledStatusContractorScope
04/06/2026Permit IssuedWALSH FACADE SERVICES INC7 scope_items
09/15/2025Permit IssuedJ.E. LEVINE BUILDER INCConcrete
3 projects · most recent 12/08/2025
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
12/08/2025Permit IssuedSPRING SCAFFOLDING LLCFence, Scaffold, Sidewalk Shed
08/19/2025Permit IssuedNORTHEAST MASONRY & RESTOScaffold
10/15/2024Permit IssuedSPRING SCAFFOLDING LLCFence, Sidewalk Shed
2 projects · most recent 06/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/15/2026Permit IssuedNORTHEAST MASONRY & RESTOSuspended Scaffold (SC)
09/29/2025Permit IssuedNORTHEAST MASONRY & RESTOSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
07/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/09/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
05/05/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRICHARD GREENWALDspecial
05/05/2026Post-installed AnchorsRICHARD GREENWALDspecial
05/05/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
03/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRICHARD GREENWALDspecial
03/24/2026Post-installed AnchorsRICHARD GREENWALDspecial
03/24/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/24/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
12/15/2025Post-installed AnchorsRICHARD GREENWALDspecial
12/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRICHARD GREENWALDspecial
12/15/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
12/15/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
10/27/2025Air barrier - visual inspectionRICHARD GREENWALDenergy_progress
10/27/2025Fenestration areasRICHARD GREENWALDenergy_progress
10/27/2025Air barrier continuity plan testingRICHARD GREENWALDenergy_progress
10/27/2025Exterior Insulation and Finish Systems (EIFS)RICHARD GREENWALDspecial
10/27/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
10/27/2025Post-installed AnchorsRICHARD GREENWALDspecial
10/27/2025Wall Panels, Curtain Walls, and VeneersRICHARD GREENWALDspecial
10/27/2025MasonryRICHARD GREENWALDspecial
10/27/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
10/27/2025Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
10/27/2025Protection of exposed foundation insulationRICHARD GREENWALDenergy_progress
10/27/2025Fenestration and door U-factor and product ratingsRICHARD GREENWALDenergy_progress
10/27/2025Fenestration air leakageRICHARD GREENWALDenergy_progress
Latest 25 of 96.
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings74
▸DOB NOWPlans/Sketch74
08/27/2026M00995463-S1Request digital key ↗
08/27/2026M00995463-I1Request digital key ↗
08/27/2026M00995463-P5Request digital key ↗
Showing 3 of 74 on file for this type
▸Applications & Permits16
▸DOB NOWDEP Stormwater Construction Permit10
08/27/2026M00995463-P2Open ↗
08/27/2026M00995463-S1Open ↗
08/27/2026M00995463-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/28/2025141025469Open ↗
03/26/2024141025469Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/26/2024141025469Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications162
▸DOB NOWDPL-1: Design Professional Seal & Signature77
08/27/2026M00995463-S1Open ↗
08/27/2026M00995463-I1Open ↗
08/27/2026M00995463-P5Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
09/02/2026M01029556-P1Open ↗
09/02/2026M01029556-P1Open ↗
09/02/2026M01029556-P1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/02/2026M01029556-P1Open ↗
09/01/2026M00995463-P7Open ↗
09/01/2026M00995463-P7Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/26/2024141025469Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/26/2024141025469Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/27/2026M00995463-I1—
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
03/04/2025141025469Open ↗
09/05/2024141025469Open ↗
▸DOB NOWStreet Tree Checklist2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
03/04/2025141025469Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/04/2025141025469Open ↗
▸BISSTREET TREES SITE PLAN1
03/03/2025141025469Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/27/2026M00995463-S1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
03/04/2025141025469Open ↗
03/04/2025141025469Open ↗
▸Other Documents34
▸DOB NOWManufacturer's Specifications7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWCalculations7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWWind Tunnel Test Report4
08/27/2026M00995463-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/26/2024141025469Open ↗
03/26/2024141025469Open ↗
▸DOB NOWSite Survey: Initial2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDHCR Document2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/27/2026M00995463-S2Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
08/27/2026M00995463-I1Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/04/2025141025469Open ↗