Walk-up apt, over six families with stores
195 HUMBOLDT STREET
BROOKLYN · BIN 3429901
💬 Discuss this project
2024Year Built
4Stories
C7Building Class
R6Zoning
10,894 sfGross Floor Area
11Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 195 HUMBOLDT HOLDINGS LLC · 3,228 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 52p · 2 filings · 4 docs
Floor 43p · 3 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 3 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 2 docs
2 jobs · most recent 06/24/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×2
10/11/2019Signed-offBUILDERS GROUP USA INCAir Conditioning Systems
Cooling
Daikin 4MXS36NMVJU 36,000 BTU · Heat Pump Outdoor ×6
3MXS24NMVJU 24,000 BTU · Heat Pump Outdoor ×1
5MXS48TVJU 47,000 BTU · Heat Pump Outdoor ×1
RMXS48LVJU 48,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 06/24/2026
Sprinkler System
FiledStatusContractorScope
06/24/2026——Sprinkler System
2 jobs · most recent 06/24/2026
Water/Sanitary Storm
FiledStatusContractorScope
06/24/2026——Water/Sanitary
10/11/2019——Storm, Water/Sanitary
6 jobs · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
07/03/2024CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
04/13/2024CompleteSOLAS ELECTRICAL CORP—
01/02/2024CompleteHIGH QUALITY ELECTRIC OF—
08/13/2020CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
08/13/2020CompleteHIVOLTS ELECTRICAL INC—
1 job · most recent 11/04/2020
Steel Concrete
FiledStatusContractorScope
11/04/2020——Steel, Concrete
Building Lifecycle
All (151)Filed (23)Permit Issued (15)Signed Off (8)Violation (4)Inspection (6)Objection (62)Special Inspection (30)Tax Incentive (3)
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Open
07/06/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
421-a(16) construction completed
06/26/2026
Objection raised — Structural
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Structural
06/26/2026
Objection raised — Cost
06/26/2026
Objection raised — Scope
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Addressed
06/24/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S3
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2026
Special inspection requirement — Post-installed Anchors
06/24/2026
Special inspection requirement — Sprinkler Systems
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Accessibility
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Cost
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Other
06/11/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S2
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/10/2026
Special inspection requirement — Maintenance information
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/27/2026
Objection raised — Cost
05/27/2026
Objection raised — Other
05/19/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S1
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2026
Special inspection requirement — Mechanical Systems
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Maintenance information
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/18/2026
Special inspection requirement — Post-installed Anchors
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
05/18/2026
Special inspection requirement — Shutoff dampers
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/11/2026
Objection raised — Fire_Protection
05/11/2026
Objection raised — Scope
04/20/2026
Special inspection requirement — Air barrier — testing
04/12/2026
Objection resolved — Addressed
04/12/2026
Special inspection requirement — Insulation placement and R values
Latest 60 of 151 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST 187 HOLDINGS2007/08/2026
OWNERS REP707/08/2026
BUILDERS GROUP303/22/2026
BUILDERS GROUP USA203/22/2026
195 HUMBOLDT LLC203/22/2026
195 HUMBOLDT HOLDINGS LLC203/21/2026
MIRON REALTY1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1603/21/2026
BAC Developers Group403/21/2026
NYC DESIGN FILE203/21/2026
AE DESIGN SOLUTION803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor907/08/2026
STATELINE BUILDERS INCGeneral Contractor407/08/2026
ABRAHAM RUTNERElectrical303/21/2026
TRUE POWER ELECL CONT LLC 004599General Contractor203/22/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
YELLOW HAT CONSTRUCTION IGeneral Contractor104/09/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
NIKOLAI KATZElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor104/09/2026
NIKOLAI KATZ ARCHITECTGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616907/26/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC02/10/2025
DOB NOWSupported ScaffoldSigned-offBUILDERS GROUP USA07/11/2024
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA07/08/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/15/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/19/2024
DOB NOWPlumbingSigned-offA M B MECHANICAL INC01/17/2024
DOB NOWSprinklersSigned-offYG SERVICES INC01/17/2024
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA01/16/2024
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA01/11/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL01/02/2024
DOB NOWStructuralSigned-offBUILDERS GROUP USA07/21/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA01/13/2023
DOB NOWConstruction FenceSigned-offYELLOW HAT CONSTRUCTION I11/04/2022
DOB NOWConstruction FenceSigned-offSTATELINE BUILDERS INC05/21/2021
DOB NOWConstruction FenceSigned-offSTATELINE BUILDERS INC01/29/2020
BIS—ISSUEDBUILDERS GROUP USA INC05/20/2024
BIS—ISSUEDBUILDERS GROUP USA INC03/04/2024
BIS—ISSUEDBUILDERS GROUP USA INC01/01/2024
BIS—ISSUEDBUILDERS GROUP USA INC12/27/2023
BIS—ISSUEDBUILDERS GROUP USA INC10/31/2023
BIS—ISSUEDBUILDERS GROUP USA INC07/24/2023
BIS—ISSUEDBUILDERS GROUP USA INC05/25/2023
BIS—ISSUEDSTATELINE BUILDERS INC03/25/2022
BISOTISSUEDSTATELINE BUILDERS INC03/02/2021
BIS—ISSUEDSTATELINE BUILDERS INC09/18/2020
BISOTISSUEDHIGH RISE BUILD & DES INC04/07/2017
BISEQISSUEDHIGH RISE BUILD & DES INC04/07/2017
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
06/24/2026Post-installed Anchors—special
06/24/2026Fire-Resistant Penetrations and Joints—special
06/24/2026Sprinkler Systems—special
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
06/10/2026Maintenance information—energy_progress
06/10/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026HVAC-R and service water heating equipment—energy_progress
06/10/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Mechanical Systems—special
05/18/2026Shutoff dampers—energy_progress
05/18/2026HVAC-R and service water heating system controls—energy_progress
05/18/2026Maintenance information—energy_progress
05/18/2026HVAC-R and service water piping design and insulation—energy_progress
05/18/2026Duct leakage testing, insulation and design—energy_progress
05/18/2026HVAC-R and service water heating equipment—energy_progress
05/18/2026Energy Code Compliance Inspections—progress
05/18/2026Final—progress
05/18/2026Post-installed Anchors—special
04/20/2026Air barrier — testing —energy_progress
04/12/2026Fenestration and door U-factor and product ratings—energy_progress
04/12/2026Protection of exposed foundation insulation—energy_progress
04/12/2026Interior lighting power—energy_progress
04/12/2026Fenestration areas—energy_progress
04/12/2026Insulation placement and R values—energy_progress
Latest 25 of 76.
▾Documents — 254 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch17
08/27/2026B00830579-P1Request digital key ↗
08/27/2026B00830579-I1Request digital key ↗
08/27/2026B00830579-P5Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/15/2026B00244787-I1Request digital key ↗
08/14/2026B00244787-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00271546-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026B00224580-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026B00224556-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026B00259924-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION35
11/06/2025322122332Open ↗
07/29/2025321941048Open ↗
02/05/2025321941048Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION12
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/04/2024321956914Open ↗
05/18/2020321956914Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/08/2024321941048Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/12/2025322122332Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISZONING DIAGRAM4
02/14/2024321941048Open ↗
01/25/2024321941048Open ↗
03/28/2023321941048Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
11/13/2025322122332Open ↗
09/17/2019321941048Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
11/13/2025322122332Open ↗
09/30/2024321941048Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/17/2019321941048Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/13/2025322122332Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/13/2025322122332Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/13/2025322122332Open ↗
▸BISVERIFY TAX LOT1
07/15/2024321941048Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/29/2026B00244787-I1Open ↗
08/29/2026B00244787-P1Open ↗
08/27/2026B00830579-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026B00830579-S2Open ↗
08/29/2026B00830579-P2Open ↗
08/27/2026B00224556-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B00830579-S2Open ↗
08/29/2026B00830579-P2Open ↗
08/27/2026B00224556-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/15/2019321941048Open ↗
04/18/2017321531142Open ↗
03/08/2017321531142Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/08/2017321531142Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/08/2017321531142Open ↗
▸Trade Schedules & Equipment1
▸BISDEFERRED SITE SEWER CONNECTION APPROVAL1
09/19/2024321941048Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
09/09/2025321941048Open ↗
04/04/2024321956914Open ↗
05/18/2020321956914Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
09/10/2024321941048Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/16/2020321941048Open ↗
▸BISSTREET TREE SIGNOFF1
04/07/2025321941048Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026B01359448-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/08/2017321531142Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/15/2019321941048Open ↗
04/18/2017321531142Open ↗
03/08/2017321531142Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2020321941048Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2025321941048Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: SOIL INSPECTION5
08/25/2025321941048Open ↗
08/21/2025321941048Open ↗
08/20/2025321941048Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/16/2024321941048Open ↗
07/01/2021321531142Open ↗
09/16/2020321941048Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/30/2025321941048Open ↗
01/30/2025321941048Open ↗
▸BISSOIL REPORT2
02/20/2020321941048Open ↗
02/20/2020321941048Open ↗
▸BIS__EPIC TESTING SERVICES (SOIL REPORT)2
07/23/2025321941048Open ↗
09/16/2020321941048Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/23/2025321941048Open ↗
01/30/2025321941048Open ↗
▸BISMECHANICAL SYSTEMS1
09/10/2024321941048Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/10/2024321941048Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/30/2025321941048Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/10/2024321941048Open ↗
▸Approvals, Objections & Sign-offs32
▸BISLETTERS - SUPPORTING DOCUMENTATION20
11/12/2025322122332Open ↗
11/12/2025322122332Open ↗
11/12/2025322122332Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
08/09/2024321941048Open ↗
08/08/2024321941048Open ↗
03/20/2023321941048Open ↗
Showing 3 of 10 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
07/17/2024321941048Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
09/08/2025321941048Open ↗
▸Cost, Insurance & Ownership18
▸BISPROJECT-SPECIFIC GL INSURANCE8
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
01/04/2024321941048Open ↗
Showing 3 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)8
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/26/2024321941048Open ↗
▸BISCOST AFFIDAVIT1
03/08/2017321531142Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION11
10/31/2024321956914Open ↗
09/19/2024321941048Open ↗
08/15/2024321941048Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
11/06/2025322122332Open ↗
05/12/2021322095843Open ↗
01/03/2020321941048Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/18/2020321956914Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION5
04/04/2024321956914Open ↗
04/04/2024321956914Open ↗
04/04/2024321956914Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/06/2025322122332Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISUNDERPINNING (2014)2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISPLOT DIAGRAM2
11/12/2025322122332Open ↗
09/26/2019321941048Open ↗
▸BISLOWEST FLOOR ELEVATION2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISSITE SURVEY: FINAL1
—321941048Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/13/2025322122332Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01359448-I1Open ↗