← Back
BuildNYC
One family attached or semi-detached
175 NORTH BURGHER AVENUE
STATEN ISLAND · BIN 5145793
💬 Discuss this project
2004Year Built
2Stories
A5Building Class
R3AZoning
1,088 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 1,872 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
North Burgher Builders303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering106/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Solar ElectricalElectrical103/21/2026
Danick Electrical ContractingElectrical103/21/2026
NYSSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841106/03/2025
Building Lifecycle
07/24/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01235703-I1
06/05/2025
Permit issued — Solar
S01235703-I1-SL
06/03/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01235703-I1
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
06/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS06/05/2025
BIS—ISSUEDRHC Construction03/14/2005
BIS—ISSUEDRHC Construction06/02/2004
BIS—ISSUEDCleveland Sitework08/27/2002
1 project · most recent 06/03/2025
FiledStatusContractorScope
06/03/2025CompleteNY Solar Electrical—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/03/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/03/2025Energy Code Compliance InspectionsROBERT MASONEprogress
06/03/2025FinalROBERT MASONEprogress
06/03/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account