← Back
City residence, one family
175 ST JAMES PLACE
BROOKLYN · BIN 3056699
💬 Discuss this project
1899Year Built
3Stories
A4Building Class
R6BZoning
2,960 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
City residence, one family · Owner of record: 175 ST. JAMES PLACE LLC · 2,500 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 20 docs
Floor 3Under Construction4p · 2 filings · 20 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1Under Construction2p · 1 filing · 11 docs
CellarUnder Construction6p · 2 filings · 20 docs
2 jobs · most recent 05/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/18/2026Permit IssuedPROSTAR PLUMBING AND HEATWater/Sanitary
12/27/2024Signed-offROCK E SMALL PLBG&HTG INCGas, Water/Sanitary
3 jobs · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026CompleteSUNBIRD ELECTRICAL CONTR—
12/05/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
04/01/2025CompleteRICHARD NEU—
Building Lifecycle
All (57)Filed (10)Permit Issued (7)Signed Off (2)Violation (7)Inspection (7)Special Inspection (24)
09/29/2026
Permit issued — Plumbing
B01401220-S1-PL
05/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2026
Permit issued — General Construction
B01401220-I1-GC
05/18/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CELLAR LEVEL OF EXISTING 3 STORY BUILDING AS PER PLANS.
B01401220-S1
05/13/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CELLAR LEVEL OF EXISTING 3 STORY BUILDING AS PER PLANS.
B01401220-I1
05/13/2026
Special inspection requirement — Interior lighting power
Rajiv Fernandez
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajiv Fernandez
05/12/2026
Special inspection requirement — Final
Rajiv Fernandez
02/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01202316-I1
02/19/2026
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949709-I1
12/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949709-P3
09/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/11/2025
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
09/11/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
09/11/2025
Special inspection requirement — Fenestration areas
09/11/2025
Special inspection requirement — Fenestration air leakage
04/16/2025
Violation issued (ECB, closed)
Unknown
04/16/2025
Violation issued (ECB, closed)
Unknown
04/08/2025
Violation issued (ECB, closed)
Unknown
04/01/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01202316-I1
04/01/2025
Permit issued — Sidewalk Shed
B01202316-I1-SH
12/30/2024
Violation issued (ECB, closed)
Construction
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
12/30/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
12/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
12/27/2024
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949709-P2
12/27/2024
Filed — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949788-P2
12/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
12/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
12/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
12/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
10/22/2024
Permit issued — General Construction
B00949709-I1-GC
10/11/2024
Permit issued — Plumbing
B00949788-I1-PL
03/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2024
Filed — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949788-P1
02/22/2024
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949709-P1
02/22/2024
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
02/22/2024
Special inspection requirement — Interior lighting power
JICHEN SUN
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
01/30/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2023
Permit issued — General Construction
B00949709-I1-GC
10/24/2023
Permit issued — Plumbing
B00949788-I1-PL
10/18/2023
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949709-I1
10/18/2023
Filed — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00949788-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY LINE PROPERTIES1207/08/2026
175 ST. JAMES PLACE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/21/2023$1.9M—— → —$635/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE RAJIV, INC.205/18/2026
PRIME ZONE BUILDING CONSULTING709/15/2025
ARQUITECTURA VARELA104/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor204/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor104/09/2026
GOWANUS CUSTOM INS LLCGeneral Contractor107/08/2026
PROSTAR PLUMBING AND HEATPlumbing109/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8864309/15/2025
NKM ENGINEERING PLLC6244110/18/2023
PRIME ZONE BUILDING CONSU9474110/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPROSTAR PLUMBING AND HEAT09/29/2026
DOB NOWGeneral ConstructionPermit IssuedGOWANUS CUSTOM INS LLC05/19/2026
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC04/01/2025
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP10/22/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/11/2024
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP10/25/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/24/2023
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/13/2026Interior lighting powerRajiv Fernandezenergy_progress
05/13/2026Energy Code Compliance InspectionsRajiv Fernandezprogress
05/12/2026FinalRajiv Fernandezprogress
09/11/2025Fenestration and door U-factor and product ratings—energy_progress
09/11/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
09/11/2025Structural Stability – Alterations of existing buildings—special
09/11/2025Energy Code Compliance InspectionsJICHEN SUNprogress
09/11/2025Air barrier - visual inspectionJICHEN SUNenergy_progress
09/11/2025Interior lighting powerJICHEN SUNenergy_progress
09/11/2025Fenestration areas—energy_progress
09/11/2025Fenestration air leakage—energy_progress
12/30/2024HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
12/30/2024HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
12/30/2024Energy Code Compliance InspectionsJICHEN SUNprogress
12/30/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
12/26/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
12/26/2024HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
12/26/2024Energy Code Compliance InspectionsJICHEN SUNprogress
12/26/2024HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
02/22/2024Air barrier - visual inspectionJICHEN SUNenergy_progress
02/22/2024Interior lighting powerJICHEN SUNenergy_progress
02/22/2024Energy Code Compliance InspectionsJICHEN SUNprogress
02/22/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
02/22/2024Energy Code Compliance InspectionsJICHEN SUNprogress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026B00949709-P1Request digital key ↗
08/25/2026B00949709-P3Request digital key ↗
08/25/2026B00949709-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/23/2026B00949788-I1Open ↗
08/23/2026B00949788-P1Open ↗
08/17/2026B01401220-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B01401220-I1Open ↗
08/31/2026B01401220-I1Open ↗
08/31/2026B01401220-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026B00949709-P1Open ↗
08/25/2026B00949709-P3Open ↗
08/25/2026B00949709-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00949709-P1Open ↗
08/22/2026B00949709-P3Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026B00949709-P1Open ↗
08/25/2026B00949709-P3Open ↗
08/25/2026B00949709-P2Open ↗
Showing 3 of 9 on file for this type