BuildNYC
Elevator apt, semi-fireproof with stores
175 WEST 87TH STREET
MANHATTAN · BIN 1032228
💬 Discuss this project
1975Year Built
32Stories
D7Building Class
R7-2Zoning
324,992 sfGross Floor Area
269Units
LL97 CoveredRent Stabilized122 Active Violations 103 unresolved · 19 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: Uws Ventures IV · 45,219 sf lot · 7.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUWS Ventures IV, LLC17p · 3 filings · 18 docs
Floor 32Unit 32D, Unit 32E, Unit 32H5p · 4 filings · 20 docs
Floor 31Unit 31GUnder Construction18p · 7 filings · 20 docs
Floor 30Unit 30D, Unit 30F, Unit 30HUnder Construction26p · 7 filings · 20 docs
Floor 29Unit 29H9p · 5 filings · 19 docs
Floor 28Unit 28E, Unit 28G22p · 4 filings · 20 docs
Floor 27Unit 27B, Unit 27F, Unit 27HUnder Construction21p · 7 filings · 20 docs
Floor 26Unit 26D, Unit 26E, Unit 26F12p · 6 filings · 18 docs
Floor 25Unit 25F, Unit 25G21p · 7 filings · 20 docs
Floor 24Unit 24B, Unit 24C, Unit 24H11p · 5 filings · 20 docs
Floor 23Unit 23G9p · 4 filings · 12 docs
Floor 22Unit 22A, Unit 22E, Unit 22HUnder Construction20p · 9 filings · 20 docs
Floor 21Unit 21B, Unit 21F, Unit 21H18p · 4 filings · 20 docs
Floor 20Uws Ventures IV, LLC18p · 7 filings · 20 docs
Floor 19Unit 19B21p · 5 filings · 20 docs
Floor 18Unit 18E18p · 3 filings · 18 docs
Floor 17Unit 17E, Unit 17G12p · 7 filings · 20 docs
Floor 16Unit 16B, Unit 16HUnder Construction11p · 3 filings · 9 docs
Floor 15Unit 15BUnder Construction18p · 2 filings · 16 docs
Floor 14Unit 14E, Unit 14F, Unit 14GUnder Construction19p · 9 filings · 20 docs
Floor 13Unit 13E, Unit 13GUnder Construction19p · 8 filings · 20 docs
Floor 12Unit 12E, Unit 12FUnder Construction20p · 4 filings · 20 docs
Floor 11Unit 11B, Unit 11HUnder Construction27p · 12 filings · 20 docs
Floor 10Uws Ventures IV, LLC8p · 3 filings · 12 docs
Floor 9
Floor 8Unit 8HUnder Construction14p · 2 filings · 16 docs
Floor 7Unit 7B, Unit 7G, Unit 7HUnder Construction20p · 7 filings · 20 docs
Floor 6Unit 6B, Unit 6F, Unit 6G +1Under Construction20p · 10 filings · 20 docs
Floor 5Unit 5B, Unit 5DUnder Construction16p · 6 filings · 20 docs
Floor 4Unit 4P, Unit 4QUnder Construction26p · 7 filings · 20 docs
Floor 3Unit 3A, Unit 3B, Unit 3D +6Under Construction85p · 14 filings · 20 docs
Floor 2Unit 2C, Unit 2E, Unit 2GUnder Construction66p · 10 filings · 20 docs
Floor 1Uws Ventures IV, LLCUnder Construction43p · 5 filings · 20 docs
CellarUws Ventures IV, LLCUnder Construction43p · 4 filings · 20 docs
BasementUws Ventures IV, LLCUnder Construction16p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation17p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Uws Ventures IV58410/13/2026
121 Seaman Avenue5207/08/2026
Grenadier Realty1503/21/2026
A&E Real Estate1403/22/2026
Glenn Gardens Associates803/21/2026
Development Holdings JW603/22/2026
910 Grand Concourse407/08/2026
Energy Building Construction403/22/2026
JW Development103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2018$220.5M—— → —$678/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG Engineering2907/15/2026
Guerin Glass Architects6311/05/2025
Guth Deconzo Consulting Engineers601/18/2023
Ospino Engineering106/02/2022
Gurvinder Singh401/19/2022
KMB Design Group209/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting12603/21/2026
WRG Engineering P C6603/21/2026
Hierarch-E203/21/2026
GC1 Expediting203/21/2026
NYC Department of Design and Construction203/21/2026
Construction Permit Services103/21/2026
HS Design Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JW Development HoldingsGeneral Contractor27607/08/2026
Henry Myers P & HPlumbing9607/08/2026
Total NY ConstructionScaffold1707/08/2026
Argon ElectricalElectrical1403/22/2026
JW Development HoldingsScaffold1207/08/2026
Argon ElectricalElectrical803/21/2026
Energy Building ConstructionScaffold403/21/2026
KG SprinklerFire Protection207/08/2026
Expert CM NYGeneral Contractor209/17/2026
Apex Group NYScaffold203/21/2026
Associated Electric Cont of NElectrical203/21/2026
Dunn Co SafetyElectrical103/21/2026
NU-Wire ElectricElectrical103/22/2026
Ohm's ElectricalElectrical103/21/2026
Davrial EnterprisesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG Engineering44035807/15/2026
Guth Deconzo Consulting E1210601/18/2023
KMB Design Group513109/23/2021
Building Lifecycle
All (300)Filed (48)Permit Issued (80)Signed Off (4)Facade (FISP) (3)Violation (60)Inspection (25)Objection (50)Special Inspection (30)
09/16/2026
Permit issued — General Construction
M01407784-I1-GC
09/05/2026
Violation issued (HPD, open)
C
09/05/2026
Violation issued (HPD, open)
B
09/05/2026
Violation issued (HPD, open)
A
08/31/2026
Violation issued (HPD, open)
C
08/13/2026
Violation issued (HPD, open)
A
08/13/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
C
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2026
Violation issued (HPD, open)
A
07/16/2026
Violation issued (HPD, open)
A
07/15/2026
Filed — Alteration
Interior renovation of existing apartments 6F, 11H, &22D. No change to use, occupancy or egress.
M01407784-I1
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Winston Garcia
07/08/2026
Permit issued — Suspended Scaffold
M01419502-I1-SC
06/30/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
A
06/29/2026
Violation issued (HPD, closed)
B
06/25/2026
Filed — Alteration
M01419502-I1
06/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, closed)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
B
06/15/2026
Violation issued (HPD, closed)
B
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, closed)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, closed)
B
06/12/2026
Violation issued (HPD, closed)
B
06/12/2026
Violation issued (HPD, closed)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, closed)
B
06/12/2026
Violation issued (HPD, open)
A
06/12/2026
Violation issued (HPD, closed)
A
06/12/2026
Violation issued (HPD, open)
A
06/12/2026
Violation issued (HPD, open)
A
06/12/2026
Violation issued (HPD, open)
A
06/12/2026
Violation issued (HPD, closed)
A
06/12/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, closed)
A
06/08/2026
Violation issued (HPD, closed)
A
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedExpert CM NY09/16/2026
DOB NOWSuspended ScaffoldPermit IssuedEnergy Building Contructi07/08/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings06/03/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings06/02/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings06/02/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings05/29/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings05/29/2026
DOB NOWStructuralPermit IssuedJW Development Holdings05/29/2026
DOB NOWGeneral ConstructionPermit IssuedExpert CM NY03/13/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/27/2026
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings11/25/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings11/25/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings11/25/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings09/24/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings09/09/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings08/27/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings06/03/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings05/28/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/18/2025
DOB NOWGeneral ConstructionSigned-offJW Development Holdings02/18/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/18/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/18/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/14/2025
DOB NOWGeneral ConstructionSigned-offJW Development Holdings02/14/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/14/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/14/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings02/14/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings01/15/2025
DOB NOWSidewalk ShedSigned-offApex Group NY11/20/2024
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings10/03/2024
DOB NOWGeneral ConstructionSigned-offJW Development Holdings10/03/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H09/19/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H09/05/2024
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings09/04/2024
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings07/10/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H07/05/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H07/01/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H06/25/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H05/09/2024
DOB NOWSidewalk ShedSigned-offTotal NY Construction03/28/2024
+ 60 more permits on file
2 projects · most recent 01/18/2023
Associated Ducts and Piping Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/18/2023——Associated Ducts and Piping, Ventilation Systems
Ventilation
Tjernlund CDB8 800 CFM · Exhaust Fan ×5
Ducts & Piping
Lg ARUNO48GSS4 54,000 BTU · Vrf Outdoor ×1
12/29/2022——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems
Cooling
Lg ARUN072BSS5 77,000 BTU · Vrf Outdoor ×2
Heating
Lg ARUN072BSS5 77,000 BTU · Vrf Outdoor ×2
23 projects · most recent 06/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/14/2024Permit IssuedHenry Myers P & HGas, Water/Sanitary
02/15/2024Permit IssuedHenry Myers P & HGas, Water/Sanitary
01/18/2024Permit IssuedHenry Myers P & HGas, Water/Sanitary
01/08/2024Permit IssuedHenry Myers P & HGas, Water/Sanitary
12/05/2023Permit IssuedHenry Myers P & HGas, Water/Sanitary
12/05/2023Permit IssuedHenry Myers P & HGas, Water/Sanitary
11/21/2023Permit IssuedHenry Myers P & HGas, Water/Sanitary
05/12/2023Permit IssuedHenry Myers P & HGas, Water/Sanitary
10/06/2022——Gas, Water/Sanitary
06/17/2021Permit IssuedHenry Myers P & HGas, Water/Sanitary
02/02/2021Permit IssuedHenry Myers P & HGas, Water/Sanitary
02/02/2021Permit IssuedHenry Myers P & HGas, Water/Sanitary
02/02/2021Permit IssuedHenry Myers P & HGas, Water/Sanitary
07/09/2020Permit IssuedHenry Myers P & HGas, Water/Sanitary
07/09/2020Permit IssuedHenry Myers P & HGas, Water/Sanitary
25 projects · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026Permit IssuedArgon ElectricalGeneral Wiring
04/08/2026Permit IssuedArgon ElectricalGeneral Wiring
04/02/2026CompleteArgon ElectricalGeneral Wiring
04/02/2026CompleteArgon ElectricalGeneral Wiring
02/04/2026CompleteArgon ElectricalGeneral Wiring
01/16/2026CompleteArgon ElectricalGeneral Wiring
11/26/2025Permit IssuedArgon ElectricalGeneral Wiring
11/26/2025Permit IssuedArgon ElectricalGeneral Wiring
10/16/2025Permit IssuedArgon ElectricalGeneral Wiring
10/13/2025Permit IssuedArgon ElectricalGeneral Wiring
07/18/2025CompleteArgon ElectricalGeneral Wiring
07/18/2025CompleteArgon ElectricalGeneral Wiring
06/24/2025CompleteArgon ElectricalGeneral Wiring
06/17/2025CompleteArgon ElectricalGeneral Wiring
06/05/2025CompleteArgon ElectricalGeneral Wiring
2 projects · most recent 02/27/2024
Masonry
FiledStatusContractorScope
02/27/2024Permit IssuedJW Development HoldingsMasonry
10/29/2021Permit IssuedJW Development HoldingsMasonry
1 project · most recent 09/19/2019
Fence
FiledStatusContractorScope
09/19/2019Permit IssuedJW Development HoldingsFence
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/15/2026Fire-Resistant Penetrations and JointsWinston Garciaspecial
05/27/2026Final—progress
02/09/2026Fire-Resistant Penetrations and Joints—special
02/04/2026Final—progress
01/20/2026Structural Stability – Alterations of existing buildingsWinston Garciaspecial
01/20/2026Fire-Resistant Penetrations and JointsWinston Garciaspecial
01/20/2026FinalWinston Garciaprogress
01/07/2026Fire-Resistant Penetrations and JointsWinston Garciaspecial
11/10/2025FinalWinston Garciaprogress
07/29/2025Lighting controlsWinston Garciaenergy_progress
07/29/2025Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/29/2025Tenant Protection Plan Compliance—special
07/29/2025FinalWinston Garciaprogress
07/29/2025Maintenance informationWinston Garciaenergy_progress
07/29/2025Interior lighting powerWinston Garciaenergy_progress
01/22/2025FinalWinston Garciaprogress
01/22/2025Fire-Resistant Penetrations and JointsWinston Garciaspecial
08/19/2024MasonryWinston Garciaspecial
08/15/2024Tenant Protection Plan ComplianceWinston Garciaspecial
08/08/2024FinalWinston Garciaprogress
07/30/2024Tenant Protection Plan ComplianceWinston Garciaspecial
07/30/2024Fire-Resistant Penetrations and JointsWinston Garciaspecial
06/11/2024Insulation placement and R valuesWinston Garciaenergy_progress
06/05/2024FinalWinston Garciaprogress
05/28/2024Energy Code Compliance InspectionsWinston Garciaprogress
Latest 25 of 150.
▾Documents — 1,053 on file (BIS + DOB NOW)
▸Plans & Drawings102
▸DOB NOWPlans/Sketch61
09/03/2026M00502002-I1Request digital key ↗
09/03/2026M00502046-I1Request digital key ↗
09/03/2026M00524964-I1Request digital key ↗
Showing 3 of 61 on file for this type
▸DOB NOWPlans/Sketch - Plumbing25
09/05/2026M00192029-I1Request digital key ↗
09/05/2026M00279092-I1Request digital key ↗
09/05/2026M00244199-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - General Construction10
09/04/2026M00448299-I1Request digital key ↗
09/04/2026M00448255-I1Request digital key ↗
09/04/2026M00448178-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/03/2026M00210313-P1Request digital key ↗
09/03/2026M00210313-P3Request digital key ↗
09/03/2026M00210313-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00229843-I1Request digital key ↗
▸Applications & Permits116
▸BISWORK PERMIT APPLICATION58
08/22/2023140999891Open ↗
01/06/2023123812106Open ↗
05/17/2022140896564Open ↗
Showing 3 of 58 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION56
08/10/2023140999891Open ↗
07/27/2023140999891Open ↗
01/09/2023140917239Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWState DEC Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications385
▸DOB NOWDPL-1: Design Professional Seal & Signature102
09/05/2026M00076867-I1Open ↗
09/05/2026M00244680-I1Open ↗
09/05/2026M00244300-I1Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWProgress Inspector Seal & Signature87
10/13/2026M00978452-I1Open ↗
10/13/2026M00978452-I1Open ↗
10/13/2026M00978452-I1Open ↗
Showing 3 of 87 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
03/17/2020123829697Open ↗
03/17/2020123829697Open ↗
02/03/2020123798060Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature60
10/13/2026M00978452-I1Open ↗
10/13/2026M00978452-I1Open ↗
09/06/2026M00447710-I1Open ↗
Showing 3 of 60 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
03/12/2021140999891Open ↗
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
03/17/2020123829697Open ↗
02/03/2020123798060Open ↗
01/27/2020123798024Open ↗
Showing 3 of 24 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
03/12/2021140999891Open ↗
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
03/12/2021140999891Open ↗
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/17/2020140896564Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection59
▸DOB NOWTenant Protection Plan29
09/03/2026M00210313-P2Open ↗
09/03/2026M00210313-I1Open ↗
09/03/2026M00210313-P1Open ↗
Showing 3 of 29 on file for this type
▸BISTenant Protection Plan and Notes25
01/27/2020123798024Open ↗
01/22/2020123798033Open ↗
11/20/2019123791110Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
08/22/2023140999891Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
03/22/2021140896564Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos127
▸DOB NOWDEP ACP-5: Asbestos Assessment Report96
09/05/2026M00244680-I1Open ↗
09/05/2026M00244300-I1Open ↗
09/05/2026M00192029-I1Open ↗
Showing 3 of 96 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
06/25/2020140917239Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/22/2021140896564Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance77
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS45
03/17/2020123829697Open ↗
03/17/2020123829697Open ↗
02/03/2020123798060Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
03/22/2021140896564Open ↗
12/28/2020140953001Open ↗
12/21/2020140953001Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
06/25/2020140917239Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
03/12/2021140999891Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
03/12/2021140999891Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY17
03/22/2021140896564Open ↗
03/12/2021140999891Open ↗
12/28/2020140953001Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/22/2023140999891Open ↗
Showing 1 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
05/17/2022140896564Open ↗
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT38
01/26/2022123760661Open ↗
03/12/2021140999891Open ↗
12/21/2020140953001Open ↗
Showing 3 of 38 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW312
05/24/2023123751298Open ↗
05/24/2023123751289Open ↗
04/08/2022123687876Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET27
03/17/2020123829697Open ↗
02/03/2020123798060Open ↗
01/27/2020123798024Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION18
08/22/2023140999891Open ↗
08/10/2023140999891Open ↗
01/09/2023140917239Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
03/12/2021140999891Open ↗
12/21/2020140953001Open ↗
06/25/2020140916203Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM6
08/07/2023140999891Open ↗
01/06/2023123812106Open ↗
05/17/2022140896564Open ↗
Showing 3 of 6 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
11/08/2019123740461Open ↗
11/08/2019123740452Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSite Survey: Initial1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type