175 WILLIS AVENUE · BIN 2093917
💬 Discuss this project
1961Year Built
19Stories
D1Building Class
R6Zoning
977,430 sfGross Floor Area
709Units
LL97 Covered12 Open Violations 8 unresolved · 4 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 268,760 sf lot · 3.64 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanical
Roof6p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA4409/13/2026
NEW YORK CITY HOUSING AUTHORITY607/08/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99203/22/2026
NEW YORK CITY HOUSING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC908/17/2026
YSRAEL A. SEINUK, P.C.108/02/2024
LAKHANI & JORDAN206/26/2024
STEPHEN B JACOBS GROUP106/24/2024
IP GROUP201/26/2024
JOEL PHAGOO P.E. PLLC111/14/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1403/21/2026
STEPHEN B JACOBS GROUP803/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor1207/08/2026
JCC CONSTRUCTION CORPPlumbing507/08/2026
SKYWORX CONTRACTING INCGeneral Contractor507/08/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor403/21/2026
P & K CONTRACTING INCGeneral Contractor407/08/2026
SKYLINE P & H INCPlumbing203/22/2026
MNK ENTERPRISES LLCGeneral Contractor208/20/2026
PEREIRA, WESLLEYElectrical103/21/2026
ALPHONSE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198106/20/2026
Building Lifecycle
All (100)Filed (17)Permit Issued (21)Signed Off (9)Facade (FISP) (12)Violation (20)Inspection (5)Special Inspection (16)
08/18/2026
Permit issued — Construction Fence
X01446150-I1-FN
08/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 225 WILLIS AVENUE, BRONX, NY 10454 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01446150-I1
08/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/22/2026
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE INSPECTION AT 225 WILLIS AVENUE,BRONX, NY 10454
X01414457-I1
07/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AT 225 WILLIS AVENUE, BRONX, NY 10454 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01431427-I1
07/16/2026
Permit issued — Sidewalk Shed
X01431427-I1-SH
07/02/2026
Permit issued — Suspended Scaffold
X01414457-I1-SC
06/20/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE INSPECTION AT 225 WILLIS AVENUE,BRONX, NY 10454
X01414457-I1
06/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
WALIUR RAHMAN
06/20/2026
Special inspection requirement — Post-installed Anchors
WALIUR RAHMAN
11/15/2025
Violation issued (FDNY_NOV, closed)
10/01/2025
Violation issued (FDNY_NOV, closed)
12/20/2024
Signed off — Alteration
NYCHA - BUILDING #8-PROPOSED REPLACEMENT OF UNDERGROUND WATER AND FIRELINE DISTRIBUTION PIPING. ALL AS PER PLANS FILED HEREWITH.
X00450839-I1
12/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/09/2024
Permit issued — Plumbing
X00450839-I1-PL
08/02/2024
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
X01048459-S1
06/26/2024
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
X01048459-S2
06/26/2024
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
X01048459-S3
06/24/2024
Filed — Alteration
Replacement of HVAC equipment (Vacuum pump, condensate pump)
X01048459-I1
06/10/2024
Special inspection requirement — Post-installed Anchors
06/10/2024
Special inspection requirement — Concrete - Cast-In-Place
06/10/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/10/2024
Special inspection requirement — Final
04/11/2024
Violation issued (ECB, open)
Local Law
01/26/2024
Filed — Alteration
NYCHA - BUILDING #8-PROPOSED REPLACEMENT OF UNDERGROUND WATER AND FIRELINE DISTRIBUTION PIPING. ALL AS PER PLANS FILED HEREWITH.
X00450839-S1
01/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/04/2024
Special inspection requirement — Post-installed Anchors
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/04/2024
Special inspection requirement — Standpipe Systems
12/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/30/2023
Permit issued — Plumbing
X00450839-I1-PL
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2022
Permit issued — Plumbing
X00450839-I1-PL
02/26/2021
Filed — Alteration
NYCHA - BUILDING #8-PROPOSED REPLACEMENT OF UNDERGROUND WATER AND FIRELINE DISTRIBUTION PIPING. ALL AS PER PLANS FILED HEREWITH.
X00450839-I1
09/25/2020
Signed off — Alteration
X00036861-I1
09/25/2020
Signed off — Alteration
X00024589-I1
09/25/2020
Signed off — Alteration
X00038863-I1
03/09/2020
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 225 WILLIS AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00063727-I1
03/09/2020
Signed off — Alteration
X00063700-I1
03/09/2020
Signed off — Alteration
X00064835-I1
11/25/2019
Permit issued — Sidewalk Shed
X00036861-I1-SH
11/25/2019
Permit issued — Construction Fence
X00024589-I1-FN
11/22/2019
Permit issued — Supported Scaffold
X00038863-I1-SF
10/16/2019
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 225 WILLIS AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00063727-P1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/05/2019
Permit issued — Supported Scaffold
X00063727-I1-SF
07/16/2019
Permit issued — Sidewalk Shed
X00063700-I1-SH
07/15/2019
Permit issued — Construction Fence
X00064835-I1-FN
09/10/2018
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00002464-I1
08/13/2018
Filed — Alteration
X00063700-I1
08/13/2018
Permit issued — Construction Fence
X00064835-I1-FN
08/13/2018
Permit issued — Sidewalk Shed
X00063700-I1-SH
08/10/2018
Filed — Alteration
X00064835-I1
08/10/2018
Permit issued — Supported Scaffold
X00063727-I1-SF
08/07/2018
Permit issued — Supported Scaffold
X00063727-I1-SF
08/06/2018
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 225 WILLIS AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00063727-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC08/18/2026
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC07/16/2026
DOB NOWSuspended ScaffoldSigned-offSHR3 CONSTRUCTION CORP07/02/2026
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP08/09/2024
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP10/30/2023
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP10/17/2022
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/25/2019
DOB NOWConstruction FenceSigned-offSTEEL CONSTRUCTION LLC11/25/2019
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC11/22/2019
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC08/05/2019
DOB NOWSidewalk ShedSigned-offP & K CONTRACTING INC07/16/2019
DOB NOWConstruction FenceSigned-offP & K CONTRACTING INC07/15/2019
DOB NOWConstruction FenceSigned-offP & K CONTRACTING INC08/13/2018
DOB NOWSidewalk ShedSigned-offP & K CONTRACTING INC08/13/2018
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC08/10/2018
DOB NOWSupported ScaffoldSigned-offSKYWORX CONTRACTING INC08/07/2018
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC06/27/2018
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC05/04/2018
DOB NOWConstruction FenceSigned-offSTEEL CONSTRUCTION LLC04/18/2018
DOB NOWSupported ScaffoldSigned-offVIKRANT CONTRACTING & BUI03/15/2018
DOB NOWSupported ScaffoldSigned-offVIKRANT CONTRACTING & BUI11/14/2017
BISMHISSUEDP & K CONTRACTING INC01/05/2021
BISPLISSUEDI.M.P. PLBG. & HTG. CORP12/10/2020
BISOTISSUEDP & K CONTRACTING INC03/04/2020
BISOTISSUEDP & K CONTRACTING INC06/07/2019
BISOTISSUEDP & K CONTRACTING INC05/07/2019
BISOTISSUEDP & K CONTRACTING INC07/25/2018
BISOTISSUEDVIKRANT CONTRACTING & BUILDER11/22/2017
BISEQISSUEDVIKRANT CONTRACTING & BUILDER10/13/2017
BISEQISSUEDVIKRANT CONTRACTING & BUILDER10/13/2017
BISEQISSUEDPARSONS CONSTRUCTION INC09/25/2017
BISEQISSUEDPARSONS CONSTRUCTION INC10/03/2016
BISEQISSUEDPARSONS CONSTRUCTION INC10/26/2015
BISPLISSUEDDNA PLUMBING CONTR. INC11/14/2000
BISPLISSUEDDNA PLUMBING CONTR. INC09/01/2000
BISOTISSUEDCRANE MECHANICAL CORP10/12/1999
BISPLISSUEDDNA PLUMBING CONTR. INC06/01/1999
BISOTISSUEDCRANE MECHANICAL CORP06/01/1999
BISOTISSUEDCRANE MECHANICAL CORP.01/26/1999
BISOTISSUEDCRANE MECHANICAL CORP.07/21/1998
+ 1 more permits on file
1 project · most recent 08/02/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/02/2024——Ventilation Systems
Ventilation
Greenheck GREENHECK SBE-1H24-3 1,250 CFM · Exhaust Fan ×1
Shipco BVC 18 CFM · Pump ×1
2 projects · most recent 08/02/2024
Storm Water/Sanitary
FiledStatusContractorScope
08/02/2024——Storm
01/26/2024Signed-offJCC CONSTRUCTION CORPWater/Sanitary
10 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
07/31/2026Permit IssuedSCHLESINGER ELECT'L CONTRGeneral Wiring
07/13/2026Permit IssuedLIT MODE ELECL CONTG INC—
09/29/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
06/08/2023CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
02/28/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
01/16/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
12/19/2018CompleteGILSTON ELEC'L CONTR. CORGeneral Wiring
12/10/2018CompleteAMIN ELECTRICAL CORP—
03/28/2018CompleteAMIN ELECTRICAL CORP—
1 project · most recent 08/02/2024
FiledStatusContractorScope
08/02/2024——1 scope_items
2 projects · most recent 08/17/2026
Fence Sidewalk Shed
FiledStatusContractorScope
08/17/2026Permit IssuedMNK ENTERPRISES LLCFence
07/16/2026Permit IssuedMNK ENTERPRISES LLCSidewalk Shed
1 project · most recent 06/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/20/2026Signed-offSHR3 CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/20/2026Alternative Materials - OTCR Buildings Bulletin NumberWALIUR RAHMANspecial
06/20/2026Post-installed AnchorsWALIUR RAHMANspecial
06/10/2024Post-installed Anchors—special
06/10/2024Concrete - Cast-In-Place—special
06/10/2024Subsurface Conditions – Fill Placement & In-Place Density—special
06/10/2024Tenant Protection Plan Compliance—special
05/10/2024Final—progress
01/26/2024Tenant Protection Plan Compliance—special
01/04/2024Post-installed Anchors—special
01/04/2024Fire-Resistant Penetrations and Joints—special
01/04/2024Standpipe Systems—special
07/24/2018FinalQAISAR KHANprogress
07/20/2018FinalQAISAR KHANprogress
06/27/2018PreliminaryQAISAR KHANprogress
04/26/2018FinalQAISAR KHANprogress
03/05/2018FinalQAISAR KHANprogress
▾Documents — 201 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch15
08/26/2026X00002464-I1Request digital key ↗
08/26/2026X00024589-I1Request digital key ↗
08/26/2026X00036861-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/26/2026X00063727-I1Request digital key ↗
08/15/2026X00063727-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00450839-I1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION15
01/05/2021220550231Open ↗
12/10/2020220550231Open ↗
03/04/2020220550231Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
06/04/2020220550231Open ↗
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026X00036861-I1Open ↗
08/26/2026X00038863-I1Open ↗
08/26/2026X00063727-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/10/2018240202071Open ↗
09/10/2018240202080Open ↗
05/17/2018240202115Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026X00024589-I1Open ↗
08/26/2026X00063700-I1Open ↗
08/24/2026X00038863-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X01414457-I1Open ↗
08/25/2026X01414457-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/10/2014220400830Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/11/2016220550231Open ↗
09/28/2016220550231Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026X00450839-I1Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES5
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/25/2018220550231Open ↗
09/28/2016220550231Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/25/2018220550231Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00038863-I1Open ↗
08/26/2026X00063727-I1Open ↗
08/26/2026X00063727-P1Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
10/09/2020220550231Open ↗
10/09/2020220550231Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/17/2018240202115Open ↗
10/11/2017240202115Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
07/25/2018220550231Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/20/2021220550231Open ↗
01/20/2021220550231Open ↗
10/11/2017240202115Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/17/2018240202115Open ↗
09/28/2016220550231Open ↗
12/10/2014220400830Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/11/2017240202071Open ↗
10/23/2015240119787Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/09/2020220550231Open ↗
05/17/2018240202115Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/11/2017240202115Open ↗
▸BISNYCECC ANALYSIS1
10/11/2017240202115Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/05/2021220550231Open ↗
05/05/2021220550231Open ↗
01/20/2021220550231Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs33
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/26/2026X00036861-I1Open ↗
08/18/2026X01446150-I1Open ↗
08/16/2026X01414457-I1Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/04/2020220550231Open ↗
08/01/2019220550231Open ↗
07/18/2019220550231Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/05/2021220550231Open ↗
08/24/2020220550231Open ↗
09/10/2018240202071Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER1
10/14/2016240119787Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT7
10/09/2020220550231Open ↗
05/17/2018240202115Open ↗
11/16/2017240206406Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
01/05/2021220550231Open ↗
03/04/2020220550231Open ↗
08/01/2019220550231Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms14
▸BISEFILING JOB APPLICATION COVER SHEET5
11/16/2017240206406Open ↗
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
09/10/2018240202071Open ↗
09/10/2018240202080Open ↗
05/17/2018240202115Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
06/17/2020220550231Open ↗
06/04/2020220550231Open ↗
03/14/2018240202115Open ↗
▸BISEFILING COVER SHEET2
09/28/2016220550231Open ↗
12/10/2014220400830Open ↗
▸Other Documents7
▸BISFEE EXEMPTION DOCUMENTATION4
10/11/2017240202115Open ↗
10/11/2017240202080Open ↗
10/11/2017240202071Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/23/2015240119787Open ↗
▸DOB NOWCalculations1
08/16/2026X01414457-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01414457-I1Open ↗