← Back
Walk-up apt, over six families with stores
1750 2 AVENUE
MANHATTAN · BIN 1050206
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C2-8Zoning
7,535 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 1750-1752 SECOND AVENUE OWNER LLC · 2,000 sf lot · 3.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Roof2p · 2 filings · 17 docs
Cellar1p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENETREE MANAGEMENT307/08/2026
1750-1752 SECOND AVENUE OWNER LLC103/22/2026
SALON REALTY703/21/2026
LKR CONSTRUCTION INC303/21/2026
1750 2ND AVE2003/21/2026
350 WEST 18TH REALTY503/21/2026
LUCKY CHARM 6365703/21/2026
1750 SECOND AVE803/21/2026
C O SALON REALTY203/21/2026
1750-1752 SECOND AVENUE HOLDINGS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB DESIGN GROUP, LLC301/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIFUSCO, ALFONSOElectrical303/21/2026
DUNN, JEREMYElectrical303/21/2026
CRUGNALE, MICHAELElectrical303/21/2026
MAGALLANES, ROBERTOElectrical103/21/2026
MICHAEL OLIVOElectrical103/21/2026
SENAD MEHOVICElectrical103/21/2026
TYMINSKI, DARIUSZElectrical103/21/2026
ETAK SYSTEMS LLCGeneral Contractor107/08/2026
CLARKE, HAROLDElectrical103/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor107/08/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
GILSTON, HARVEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513301/06/2023
Building Lifecycle
All (34)Filed (3)Permit Issued (2)Signed Off (2)Violation (13)Special Inspection (14)
09/24/2025
Signed off — Alteration
M00404553-I1
11/22/2024
Violation issued (HPD, closed)
I
05/30/2023
Signed off — Alteration
Replacement of existing condensing unit on grade with new roof curbs. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use or egress.
M00613167-I1
03/15/2023
Violation issued (HPD, closed)
A
01/09/2023
Special inspection requirement — Mechanical Systems
Ekata Shah
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ekata Shah
01/09/2023
Special inspection requirement — Final
Ekata Shah
01/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ekata Shah
01/09/2023
Special inspection requirement — Maintenance information
Ekata Shah
01/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ekata Shah
01/09/2023
Special inspection requirement — Air barrier - visual inspection
Ekata Shah
01/06/2023
Filed — Alteration
Replacement of existing condensing unit on grade with new roof curbs. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use or egress.
M00613167-P1
12/21/2022
Special inspection requirement — Mechanical Systems
Ekata Shah
12/21/2022
Special inspection requirement — Final
Ekata Shah
12/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ekata Shah
12/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ekata Shah
12/21/2022
Special inspection requirement — Maintenance information
Ekata Shah
12/21/2022
Special inspection requirement — Air barrier - visual inspection
Ekata Shah
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ekata Shah
11/03/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
12/15/2021
Permit issued — General Construction
M00613167-I1-GC-CX
11/18/2021
Filed — Alteration
Replacement of existing condensing unit on grade with new roof curbs. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use or egress.
M00613167-I1
04/01/2021
Violation issued (HPD, closed)
A
12/07/2020
Permit issued — Antenna
M00404553-I1-AN
10/27/2020
Filed — Alteration
M00404553-I1
04/12/2019
Violation issued (HPD, closed)
B
11/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2016
Violation issued (HPD, closed)
B
05/07/2016
Violation issued (HPD, closed)
A
10/17/2013
Violation issued (HPD, closed)
A
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offETAK SYSTEMS LLC12/15/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR12/07/2020
BISPLISSUEDORDER A PLUMBER INC12/24/2018
BISOTISSUEDRONG MAINTENANCE INC04/03/2018
BISOTISSUEDRONG MAINTENANCE INC04/03/2018
BISOTISSUEDRONG MAINTENANCE INC04/03/2018
BISFPISSUEDPINNACLE PLBG & HTG CORP03/19/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC03/07/2018
BISMHISSUEDH & K RENOVATION INC02/26/2018
BISOTISSUEDRONG MAINTENANCE INC02/13/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC01/30/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC01/30/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC01/30/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP01/16/2018
BISOTISSUEDH & K RENOVATION INC01/16/2018
BISMHISSUEDRONG MAINTENANCE INC01/08/2018
BISOTISSUEDRONG MAINTENANCE INC01/08/2018
BISMHISSUEDRONG MAINTENANCE INC12/21/2017
BISOTISSUEDRONG MAINTENANCE INC12/21/2017
BISEQISSUEDLKR CONSTRUCTION INC10/18/2017
BISOTISSUEDAMACO MANAGEMENT & CONSUL10/17/2017
BISOTISSUEDAMACO MANAGEMENT & CONSUL10/16/2017
BISOTISSUEDAMACO MANAGEMENT & CONSUL04/04/2017
BISOTISSUEDCARLOS PADILLO09/01/2015
BISEQISSUEDCARLOS PADILLO09/01/2015
BISMHISSUEDWIRELESS NETWORK GROUP IN10/09/2012
BISOTISSUEDSKYFIELD PARTNERS LLC06/07/2011
BIS—ISSUEDUNITECH DESIGN INC12/26/2006
BISFPISSUEDMASTER FIRE PREVENTION11/20/2006
BISPLISSUEDAVON PLBG & HTG INC10/16/2006
BISMHISSUEDBANDO CONSTRUCTION INC09/18/2006
BISOTISSUEDCD HOUSING CONSTRUCTION03/18/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/17/2003
BISMHISSUEDCD HOUSING CONSTR INC09/15/2003
BISEQISSUEDCD HOUSING CONSTR. __INC09/15/2003
BISPLISSUEDEMCO PLBG AND HTG CO INC07/16/2003
BISOTISSUEDDAVID TURNER ARCHITECT,PC07/14/2003
BISPLISSUEDEMCO PLUMB HEAT. CO INC.07/09/2003
BISOTISSUEDSM CONSTRUCTION & CONTRA07/03/2003
BISMHISSUEDCELLULAR TELEPHONE CO06/07/1995
+ 1 more permits on file
1 project · most recent 05/15/2019
FiledStatusContractorScope
05/15/2019CompleteE & M ELECTRICAL NY CORP8 meters, 8 new_meters
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/09/2023Mechanical SystemsEkata Shahspecial
01/09/2023Fire-Resistant Penetrations and JointsEkata Shahspecial
01/09/2023FinalEkata Shahprogress
01/09/2023HVAC-R and service water heating equipmentEkata Shahenergy_progress
01/09/2023Maintenance informationEkata Shahenergy_progress
01/09/2023HVAC-R and service water heating system controlsEkata Shahenergy_progress
01/09/2023Air barrier - visual inspectionEkata Shahenergy_progress
12/21/2022Mechanical SystemsEkata Shahspecial
12/21/2022FinalEkata Shahprogress
12/21/2022HVAC-R and service water heating system controlsEkata Shahenergy_progress
12/21/2022HVAC-R and service water heating equipmentEkata Shahenergy_progress
12/21/2022Maintenance informationEkata Shahenergy_progress
12/21/2022Air barrier - visual inspectionEkata Shahenergy_progress
12/21/2022Fire-Resistant Penetrations and JointsEkata Shahspecial
▾Documents — 288 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/03/2026M00613167-I1Request digital key ↗
09/03/2026M00613167-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00404553-I1Request digital key ↗
▸Applications & Permits55
▸BISWORK PERMIT APPLICATION30
12/28/2018123197584Open ↗
04/09/2018140726588Open ↗
04/09/2018140726560Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
12/31/2025123206379Open ↗
12/31/2025140707929Open ↗
12/31/2025123197584Open ↗
Showing 3 of 25 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: EASEMENT AGREEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications60
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
08/01/2018140726588Open ↗
08/01/2018140726588Open ↗
08/01/2018140726560Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/26/2018123361165Open ↗
02/12/2018123362048Open ↗
01/16/2018123197584Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00613167-P1Open ↗
09/01/2026M00613167-P1Open ↗
08/23/2026M00613167-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/26/2018123361165Open ↗
02/12/2018123362048Open ↗
01/16/2018123197584Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/04/2026M00404553-I1Open ↗
09/03/2026M00613167-P1Open ↗
09/03/2026M00613167-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00613167-P1Open ↗
08/23/2026M00613167-I1Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/26/2018123197584Open ↗
02/21/2018123197584Open ↗
02/12/2018123362048Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
01/14/2026123206379Open ↗
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes13
02/26/2018123361165Open ↗
02/12/2018123362048Open ↗
02/02/2018123206379Open ↗
Showing 3 of 13 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00404553-I1Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
02/26/2018123361165Open ↗
02/14/2018123362048Open ↗
01/16/2018123197584Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00404553-I1Open ↗
09/03/2026M00613167-P1Open ↗
09/03/2026M00613167-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance43
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
08/01/2018140726588Open ↗
08/01/2018140726588Open ↗
08/01/2018140726560Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/01/2018140726588Open ↗
08/01/2018140726560Open ↗
08/01/2018140726579Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/04/2026123197584Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/04/2026123197584Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/04/2026123197584Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2026123197584Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00613167-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/04/2026123197584Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/04/2026123197584Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/25/2018123338174Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
03/05/2026123197584Open ↗
01/14/2026123206379Open ↗
12/31/2025140707929Open ↗
Showing 3 of 11 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
01/14/2026123206379Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
12/28/2018123197584Open ↗
▸BISFINAL1
03/04/2026123197584Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT27
08/01/2018140726588Open ↗
08/01/2018140726588Open ↗
08/01/2018140726560Open ↗
Showing 3 of 27 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT8
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/04/2026123197584Open ↗
01/14/2026123206379Open ↗
▸Filing & Intake Forms28
▸BISBOROUGH INTAKE FORM10
08/01/2018140726588Open ↗
08/01/2018140726560Open ↗
08/01/2018140726579Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET10
02/26/2018123361165Open ↗
02/12/2018123362048Open ↗
02/02/2018123206379Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/20/2017140726588Open ↗
12/20/2017140726560Open ↗
12/20/2017140726579Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
04/19/2018123197584Open ↗
02/26/2018123197584Open ↗
02/23/2018140624304Open ↗