← Back
Three families
1750 BAY RIDGE PARKWAY
BROOKLYN · Bensonhurst · BIN 3160230
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
2,480 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,542 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M.J. DESIGN AND BUILD INC.1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2021$1.6M—Private party → Private party$645/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC504/11/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing607/08/2026
M J DESIGN AND BUILD INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341504/11/2022
Building Lifecycle
All (46)Filed (5)Permit Issued (2)Signed Off (2)Violation (6)Inspection (3)Special Inspection (28)
04/08/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
04/29/2022
Signed off — Alteration
RENOVATION OF A TWO STORY HOUSE WITH CELLAR, PARTITION WORK AS PER PLAN, PLUMBING WORK TYPE WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613119-I1
04/29/2022
Signed off — Alteration
FILING PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION# B00613119. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613237-I1
04/18/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/11/2022
Filed — Alteration
FILING PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION# B00613119. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613237-P2
04/11/2022
Filed — Alteration
RENOVATION OF A TWO STORY HOUSE WITH CELLAR, PARTITION WORK AS PER PLAN, PLUMBING WORK TYPE WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613119-P1
04/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michelle Contri
04/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michelle Contri
04/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michelle Contri
04/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
04/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
04/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
04/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michelle Contri
04/11/2022
Special inspection requirement — Fenestration air leakage
Michelle Contri
04/11/2022
Special inspection requirement — Fenestration areas
Michelle Contri
04/11/2022
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
04/11/2022
Special inspection requirement — Insulation placement and R values
Michelle Contri
04/11/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michelle Contri
04/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
04/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
04/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michelle Contri
04/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michelle Contri
04/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michelle Contri
04/05/2022
Special inspection requirement — Insulation placement and R values
Michelle Contri
04/05/2022
Special inspection requirement — Fenestration areas
Michelle Contri
04/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michelle Contri
04/05/2022
Special inspection requirement — Fenestration air leakage
Michelle Contri
04/05/2022
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
04/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michelle Contri
04/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
04/05/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
04/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
03/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2021
Filed — Alteration
FILING PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION# B00613119. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613237-P1
12/14/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2021
Permit issued — Plumbing
B00613237-I1-PL
10/19/2021
Permit issued — General Construction
B00613119-I1-GC
10/18/2021
Filed — Alteration
RENOVATION OF A TWO STORY HOUSE WITH CELLAR, PARTITION WORK AS PER PLAN, PLUMBING WORK TYPE WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613119-I1
10/18/2021
Filed — Alteration
FILING PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION# B00613119. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00613237-I1
04/06/2021
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/20/2021
DOB NOWGeneral ConstructionSigned-offM J DESIGN AND BUILD INC10/19/2021
1 project · most recent 10/26/2021
General Wiring
FiledStatusContractorScope
10/26/2021CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/18/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/11/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
04/11/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
04/11/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
04/11/2022Energy Code Compliance InspectionsMichelle Contriprogress
04/11/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
04/11/2022Structural Stability – Alterations of existing buildingsMichelle Contrispecial
04/11/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
04/11/2022Energy Code Compliance InspectionsMichelle Contriprogress
04/11/2022Fire-Resistance Rated ConstructionMichelle Contriprogress
04/11/2022Fenestration air leakageMichelle Contrienergy_progress
04/11/2022Fenestration areasMichelle Contrienergy_progress
04/11/2022Air barrier - visual inspectionMichelle Contrienergy_progress
04/11/2022Insulation placement and R valuesMichelle Contrienergy_progress
04/11/2022Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
04/09/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
04/09/2022Energy Code Compliance InspectionsMichelle Contriprogress
04/09/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
04/09/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
04/09/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
04/05/2022Insulation placement and R valuesMichelle Contrienergy_progress
04/05/2022Fenestration areasMichelle Contrienergy_progress
04/05/2022Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
04/05/2022Fenestration air leakageMichelle Contrienergy_progress
04/05/2022Air barrier - visual inspectionMichelle Contrienergy_progress
04/05/2022Fire-Resistance Rated ConstructionMichelle Contriprogress
Latest 25 of 28.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00613119-P1Request digital key ↗
09/01/2026B00613119-I1Request digital key ↗
09/01/2026B00613237-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature22
08/29/2026B00613237-P2Open ↗
08/29/2026B00613237-P2Open ↗
08/29/2026B00613237-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026B00613237-P2Open ↗
08/23/2026B00613119-P1Open ↗
08/23/2026B00613119-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00613119-P1Open ↗
09/01/2026B00613119-I1Open ↗
09/01/2026B00613237-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00613119-P1Open ↗
09/01/2026B00613119-I1Open ↗
09/01/2026B00613237-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00613237-I1Open ↗
08/13/2026B00613119-I1Open ↗