1750 SEDGWICK AVENUE
💬 Discuss this project
1974Year Built
20Stories
D3Building Class
R7-1Zoning
272,370 sfGross Floor Area
227Units
LL97 CoveredRent Stabilized37 Open Violations 34 unresolved · 3 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: ACV REALTY CORP · 62,625 sf lot · 4.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 20 docs
Floor 26p · 1 filing · 12 docs
Floor 16p · 1 filing · 12 docs
CellarUnder Construction27p · 4 filings · 20 docs
Site & exterior19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DALTON MANAGEMENT4108/30/2026
PLATINUM SERVICES NY1507/08/2026
UNIVERSITY RIVER VIEW ASSOC903/21/2026
UNIVERSITY RIVERSIDE ASSOCIATES603/21/2026
PYRAMID RESTORATION NY507/08/2026
UNUVERSITY RIVERVIEW ASSOCIATES303/21/2026
UNIVERSITY REVIEW ASSOC303/21/2026
BRENMAC203/21/2026
ACV REALTY CORP103/22/2026
UNIVERSITY RIVERVIEW APARTMENTS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG510/27/2025
HOWARD L ZIMMERMAN ARCH & ENG DPC709/26/2025
ASHRAF CORP312/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD L ZIMMERMAN ARCHITECTS1403/21/2026
PLATINUM SERVICES NY403/21/2026
LMS-ACE SERVICES503/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor707/08/2026
C C CONTROLLED COMBUSTIONGeneral Contractor307/08/2026
GEORGIOS KOUSPOSElectrical203/21/2026
CC CONTROLLED PLBG CO.,INPlumbing208/26/2026
DK CONSTRUCTION ONE, CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034310/27/2025
EDG2578510/27/2025
HOWARD L ZIMMERMAN ARCHIT1712409/26/2025
Building Lifecycle
All (173)Filed (16)Permit Issued (21)Facade (FISP) (22)Violation (60)Objection (24)Special Inspection (30)
08/27/2026
Permit issued — Boiler Equipment
X08024656-I1-BE
08/25/2026
Permit issued — Plumbing
X08007616-I1-PL
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
A
07/24/2026
Violation issued (HPD, open)
C
07/20/2026
Violation issued (ECB, closed)
Construction
07/14/2026
Cycle 9 facade report submitted
07/14/2026
Cycle 9 facade report signed — UNSAFE
05/21/2026
Cycle 9 facade inspection completed
05/12/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, closed)
A
04/26/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, closed)
C
04/22/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, open)
A
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, open)
B
04/07/2026
Violation issued (HPD, closed)
C
02/27/2026
Violation issued (HPD, closed)
B
02/27/2026
Violation issued (HPD, closed)
B
02/27/2026
Violation issued (HPD, closed)
B
02/27/2026
Violation issued (HPD, closed)
B
02/27/2026
Violation issued (HPD, closed)
C
02/27/2026
Violation issued (HPD, closed)
C
02/14/2026
Violation issued (HPD, closed)
C
02/14/2026
Violation issued (HPD, closed)
C
02/14/2026
Violation issued (HPD, closed)
B
12/23/2025
Violation issued (HPD, closed)
B
12/23/2025
Violation issued (HPD, closed)
B
12/23/2025
Violation issued (HPD, closed)
B
12/23/2025
Violation issued (HPD, closed)
B
12/23/2025
Violation issued (HPD, closed)
B
12/04/2025
Permit issued — Suspended Scaffold
X00968036-I1-SC
12/01/2025
Permit issued — Supported Scaffold
X01149929-I1-SF
12/01/2025
Permit issued — Sidewalk Shed
X00802462-I1-SH
11/20/2025
Violation issued (ECB, closed)
Elevators
11/13/2025
Permit issued — Structural
X01283875-I1-ST
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
11/10/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
11/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
11/10/2025
Special inspection requirement — Final
Anthony Stasio
11/06/2025
Permit issued — Mechanical Systems
X01281395-I1-MS
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
C
10/27/2025
Filed — Alteration
Garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
X01283875-P1
10/27/2025
Special inspection requirement — Final
Anthony Stasio
10/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
10/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
10/27/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedC C CONTROLLED COMBUSTION08/27/2026
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC12/01/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/01/2025
DOB NOWStructuralPermit IssuedPYRAMID RESTORATION NY LL11/13/2025
DOB NOWMechanical SystemsPermit IssuedDK CONSTRUCTION ONE, CORP11/06/2025
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL10/23/2025
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL03/04/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY02/10/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC12/04/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/02/2024
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL09/09/2024
DOB NOWMechanical SystemsPermit IssuedC C CONTROLLED COMBUSTION03/28/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/29/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/04/2023
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL11/30/2023
DOB NOWMechanical SystemsPermit IssuedC C CONTROLLED COMBUSTION08/21/2023
DOB NOWBoiler EquipmentPermit IssuedC C CONTROLLED COMBUSTION08/17/2023
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN08/16/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/23/2022
BISEQISSUEDBRENMAC CORP12/01/2016
BISOTISSUEDVALENTE/C.A. LINDMAN, LLC11/10/2016
BISOTISSUEDROMO CONSTRUCTION CORP04/15/2016
BISOTISSUEDROMO CONSTRUCTION CORP11/02/2015
BISEQISSUEDBRENMAC CORP06/12/2015
BISOTISSUEDATLAS CONSTRUCTION OF NY05/09/2012
BISEQISSUEDBAY RESTORATION CORP03/22/2012
BISOTISSUEDATLAS CONSTRUCTION OF NY11/17/2011
BISEQISSUEDBAY RESTORATION CORP02/04/2011
BISOTISSUEDATLAS CONSTRUCTION OF NY07/02/2010
BISEQISSUEDBAY RESTORATION CORP01/30/2010
BISOTISSUEDATLAS CONSTRUCTION OF NY07/08/2009
BISEQISSUEDBAY RESTORATION CORP02/11/2009
BISOTISSUEDATLAS CONSTRUCTION OF NY11/19/2008
BISEQISSUEDEVEREST SCAFFOLDING INC10/03/2008
BISEQISSUEDBAY RESTORATION CORP04/14/2008
BISOTISSUEDVICTORIA RESTORATION CORP.05/13/2004
BISEQISSUEDPHOENIX BRIDGING INC.03/31/2004
BISFBISSUEDC C CONTROLLED COMBUSTION03/28/2001
+ 3 more permits on file
1 project · most recent 07/20/2023
Others
FiledStatusContractorScopeMake / Model / Capacity
07/20/2023Permit IssuedC C CONTROLLED COMBUSTIONOthers
Other
Dayton 7CC11 2,600 CFM · Exhaust Fan ×2
1 project · most recent 07/20/2023
Gas
FiledStatusContractorScope
07/20/2023Permit IssuedCC CONTROLLED PLBG CO.,INGas
1 project · most recent 12/21/2022
General Wiring
FiledStatusContractorScope
12/21/2022Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
2 projects · most recent 10/27/2025
Concrete
FiledStatusContractorScope
10/27/2025Permit IssuedPYRAMID RESTORATION NY LLConcrete
06/03/2025Permit IssuedPYRAMID RESTORATION NY LL1 scope_items
1 project · most recent 07/15/2023
Sidewalk Shed
FiledStatusContractorScope
07/15/2023Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
1 project · most recent 12/08/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/08/2023Permit IssuedSTREAMLINE CONSULTANTS NYSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/10/2025Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
11/10/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
11/10/2025Post-installed AnchorsAnthony Stasiospecial
11/10/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
11/10/2025FinalAnthony Stasioprogress
10/27/2025FinalAnthony Stasioprogress
10/27/2025Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
10/27/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
10/27/2025Post-installed AnchorsAnthony Stasiospecial
10/27/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
06/04/2025Post-installed AnchorsAnthony Stasiospecial
06/04/2025MasonryAnthony Stasiospecial
06/04/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/04/2025Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
06/04/2025FinalAnthony Stasioprogress
04/25/2025MasonryAnthony Stasiospecial
04/25/2025FinalAnthony Stasioprogress
04/25/2025Tenant Protection Plan Compliance—special
04/25/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/25/2025Post-installed AnchorsAnthony Stasiospecial
08/03/2023Tenant Protection Plan ComplianceJon Colatrellaspecial
08/03/2023Mechanical SystemsJon Colatrellaspecial
08/03/2023Heating SystemsJon Colatrellaspecial
08/03/2023Chimneys and ventsJon Colatrellaspecial
08/03/2023FinalJon Colatrellaprogress
Latest 25 of 32.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/23/2026X00802462-P1Request digital key ↗
08/23/2026X00802462-I1Request digital key ↗
08/22/2026X08024656-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION15
12/15/2016240102438Open ↗
11/10/2016220540948Open ↗
04/28/2016220460356Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
11/28/2017240102438Open ↗
02/17/2017220460356Open ↗
02/13/2017220460356Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026X00853753-P2Open ↗
09/23/2026X00853753-P2Open ↗
09/23/2026X00853753-P2Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
11/09/2018210028842Open ↗
12/01/2017240102438Open ↗
11/28/2017240102438Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/23/2026X00802462-I1Open ↗
08/22/2026X08024656-P1Open ↗
08/22/2026X08024656-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/28/2017240102438Open ↗
10/21/2016220540948Open ↗
09/25/2015220480487Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00853753-P2Open ↗
09/02/2026X08007640-I1Open ↗
09/02/2026X01283875-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/28/2017240102438Open ↗
10/21/2016220540948Open ↗
09/25/2015220480487Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/30/2008210076184Open ↗
10/03/2008210071866Open ↗
12/26/2007210028842Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/11/2015240102438Open ↗
▸BISPC FULL REPORT1
12/26/2007210028842Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/11/2015240102438Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/21/2016220540948Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026X08024656-P1Open ↗
08/22/2026X08024656-I1Open ↗
08/22/2026X08007640-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/03/2008210071866Open ↗
12/26/2007210028842Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/21/2016220540948Open ↗
05/27/2015220460356Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/30/2008210076184Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/05/2017220540948Open ↗
05/03/2017220460356Open ↗
10/21/2016220540948Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/05/2017220540948Open ↗
05/03/2017220460356Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/11/2015240102438Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
11/09/2018210028842Open ↗
12/01/2017240102438Open ↗
09/12/2017220540948Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/01/2017240102438Open ↗
12/15/2016240102438Open ↗
05/27/2015220460356Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
10/30/2008210076184Open ↗
10/03/2008210071866Open ↗
12/26/2007210028842Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00853753-I1Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/05/2017220540948Open ↗
05/03/2017220460356Open ↗
02/17/2017220460356Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
10/21/2016220540948Open ↗
09/25/2015220480487Open ↗
05/27/2015220460356Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/09/2018210028842Open ↗
12/01/2017240102438Open ↗
09/05/2017220540948Open ↗
▸BISADDITIONAL INFORMATION2
11/28/2017240102438Open ↗
02/13/2017220460356Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/11/2015240102438Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/11/2015240102438Open ↗
03/29/2012210028842Open ↗
03/29/2012210028842Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations1
08/13/2026X00968036-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00968036-I1Open ↗