← Back
BRONX
1751 MONROE AVENUE
BRONX · Mount Hope · BIN 2131341
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 15 docs
Floor 13Under Construction2 filings · 15 docs
Floor 12Under Construction2 filings · 15 docs
Floor 11Under Construction2 filings · 15 docs
Floor 10Under Construction2 filings · 15 docs
Floor 9Under Construction2 filings · 15 docs
Floor 8Under Construction3 filings · 20 docs
Floor 7Under Construction3 filings · 20 docs
Floor 6Under Construction3 filings · 20 docs
Floor 5Under Construction3 filings · 20 docs
Floor 4Under Construction3 filings · 20 docs
Floor 3Under Construction3 filings · 20 docs
Floor 2Under Construction3 filings · 20 docs
Floor 1Under Construction3 filings · 20 docs
CellarUnder Construction3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPAXEL209/13/2026
PROPCO107/25/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPAXEL BUILDERS LLCGeneral Contractor107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681708/05/2026
VALJATO ENGINEERING PC2486102/28/2024
Building Lifecycle
All (168)Filed (27)Permit Issued (51)Signed Off (9)Violation (1)Inspection (26)Objection (24)Special Inspection (30)
09/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2026
Signed off — Alteration
FILING HEREWITH SITE WORK APPLICATION IN ASSOCIATION WITH NB# X00493694 FOR ON-SITE IMPROVEMENTS INCLUDING PROPOSED PAVEMENT & GRADING UPDATES.
X00556106-I1
08/11/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01099594-I1
08/10/2026
Signed off — Alteration
PLUMBING SCOPE OF WORK FOR SITE CIVIL IN CONJUNTION WITH NB#X00493694.
X00475845-I1
08/10/2026
Signed off — Alteration
INSTALLATION OF SPYDER CRANE IN CONJUNCTION WITH NB X00493694. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01000095-I1
08/10/2026
Signed off — Alteration
EARTHWORK SCOPE IN CONJUNCTION WITH NB# X00493694.
X00498935-I1
08/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00683234-I1
08/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00637040-I1
08/08/2026
Signed off — Alteration
X00644806-I1
08/05/2026
Filed — New Building
CONSTRUCTION OF A 13 STORY RESIDENTIAL BUILDING.
X00493694-P2
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
07/31/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
07/31/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
07/31/2026
Special inspection requirement — Metering
Soorjbally Harilall
07/31/2026
Special inspection requirement — Air barrier — testing
Soorjbally Harilall
07/31/2026
Special inspection requirement — Lighting controls
Soorjbally Harilall
07/31/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
07/31/2026
Special inspection requirement — Vestibules
Soorjbally Harilall
07/31/2026
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
07/31/2026
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
07/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
07/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
07/31/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
07/31/2026
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/31/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
07/31/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
07/31/2026
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
07/31/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
07/28/2026
Objection resolved — Resolved
07/23/2026
Permit issued — General Construction
X00493694-I1-GC
07/16/2026
Objection resolved — Resolved
07/01/2026
Permit issued — Supported Scaffold
X01099594-I1-SF
06/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/29/2026
Objection raised — Other
05/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Permit issued — General Construction
X00493694-I1-GC
05/15/2026
Objection raised — Other
05/07/2026
Filed — Alteration
X00658668-P2
05/05/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/05/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
05/05/2026
Special inspection requirement — Metering
Soorjbally Harilall
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
05/05/2026
Special inspection requirement — Lighting controls
Soorjbally Harilall
05/05/2026
Special inspection requirement — Final
Soorjbally Harilall
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
05/05/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
05/05/2026
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
04/29/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/29/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Filed — Alteration
X00658668-P1
04/16/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/16/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Permit issued — Plumbing
X00475845-I1-PL
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC07/23/2026
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/01/2026
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC05/18/2026
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEATING04/15/2026
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT04/02/2026
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC03/16/2026
DOB NOWSprinklersSigned-offMOHAMED ABDELRAZEK03/11/2026
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC02/18/2026
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC02/02/2026
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC02/02/2026
DOB NOWConstruction FenceSigned-offSPAXEL BUILDERS LLC12/15/2025
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC11/10/2025
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP08/11/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC06/09/2025
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC02/11/2025
DOB NOWSprinklersSigned-offMOHAMED ABDELRAZEK01/31/2025
DOB NOWPlumbingPermit IssuedFIVE BOROUGH NYC LLC01/10/2025
DOB NOWPlumbingPermit IssuedFIVE BOROUGH NYC LLC01/10/2025
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC12/24/2024
DOB NOWConstruction FenceSigned-offSPAXEL BUILDERS LLC12/11/2024
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC11/25/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/23/2024
DOB NOWEarth WorkSigned-offSPAXEL BUILDERS LLC05/31/2024
DOB NOWFoundationSigned-offSPAXEL BUILDERS LLC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC05/30/2024
DOB NOWFoundationSigned-offSPAXEL BUILDERS LLC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC03/07/2024
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC03/04/2024
DOB NOWFoundationSigned-offSPAXEL BUILDERS LLC02/20/2024
DOB NOWConstruction FenceSigned-offSPAXEL BUILDERS LLC12/21/2023
DOB NOWMechanical SystemsSigned-offSPAXEL BUILDERS LLC12/20/2023
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC12/20/2023
DOB NOWSprinklersSigned-offINNOVATION PLUMBING LLC10/30/2023
DOB NOWEarth WorkSigned-offSPAXEL BUILDERS LLC09/13/2023
DOB NOWFoundationSigned-offSPAXEL BUILDERS LLC09/12/2023
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC09/08/2023
DOB NOWEarth WorkSigned-offSPAXEL BUILDERS LLC07/25/2023
DOB NOWFoundationSigned-offSPAXEL BUILDERS LLC07/25/2023
DOB NOWGeneral ConstructionPermit IssuedSPAXEL BUILDERS LLC07/25/2023
DOB NOWEarth WorkSigned-offSPAXEL BUILDERS LLC05/30/2023
+ 10 more permits on file
1 project · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026Permit IssuedFIVE BOROUGH NYC LLC1,174 heads, 4 outlets
2 projects · most recent 02/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/04/2026Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
05/23/2024Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
4 projects · most recent 01/08/2026
General Wiring
FiledStatusContractorScope
01/08/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/01/2024Permit IssuedBRIGHT ELECTRIC CORPGeneral Wiring
03/12/2024CompleteRICHARD NEU—
11/22/2021Permit IssuedV. VASS ELECTRIC CORP—
1 project · most recent 01/27/2026
FiledStatusContractorScope
01/27/2026Signed-offSPAXEL BUILDERS LLC3 scope_items
3 projects · most recent 09/03/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/03/2025Signed-offMC SUPERSTRUCTURE INCScaffold
08/08/2025Permit IssuedCLASSIC CONSULTING GROUPSidewalk Shed
02/16/2022Signed-offTRI BOROUGH SCAFFOLDINGSidewalk Shed
1 project · most recent 01/27/2026
Earthwork
FiledStatusContractorScope
01/27/2026Signed-offSPAXEL BUILDERS LLCEarthwork
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
09/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/29/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/16/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/16/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2026Pass-Final PL - UndergroundPassView ↗
06/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
07/31/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
07/31/2026Interior lighting powerSoorjbally Harilallenergy_progress
07/31/2026Maintenance informationSoorjbally Harilallenergy_progress
07/31/2026Air barrier — testing Soorjbally Harilallenergy_progress
07/31/2026MeteringSoorjbally Harilallenergy_progress
07/31/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
07/31/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
07/31/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
07/31/2026Fenestration air leakageSoorjbally Harilallenergy_progress
07/31/2026Fenestration areasSoorjbally Harilallenergy_progress
07/31/2026Lighting controlsSoorjbally Harilallenergy_progress
07/31/2026Exterior lighting powerSoorjbally Harilallenergy_progress
07/31/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
07/31/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/31/2026Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
07/31/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
07/31/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
07/31/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
07/31/2026VestibulesSoorjbally Harilallenergy_progress
05/05/2026Exterior lighting powerSoorjbally Harilallenergy_progress
05/05/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
05/05/2026HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
05/05/2026Maintenance informationSoorjbally Harilallenergy_progress
05/05/2026HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
05/05/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
Latest 25 of 110.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch24
08/25/2026X00498935-I1Request digital key ↗
08/25/2026X00498935-P3Request digital key ↗
08/25/2026X00498935-S1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00475845-I1Request digital key ↗
08/25/2026X00475845-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026X00493694-I1Open ↗
08/17/2026X00493694-P2Open ↗
08/13/2026X00493694-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026X00493694-I1Open ↗
08/17/2026X00493694-P2Open ↗
08/13/2026X00493694-P1Open ↗
▸Seals & Professional Certifications108
▸DOB NOWProgress Inspector Seal & Signature51
09/20/2026X00498935-P3Open ↗
09/20/2026X00498935-P3Open ↗
09/01/2026X00658668-P1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/20/2026X00498935-P3Open ↗
09/20/2026X00498935-P3Open ↗
09/20/2026X00498935-P3Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026X00475845-I1Open ↗
08/25/2026X00475845-P1Open ↗
08/25/2026X00637040-P1Open ↗
Showing 3 of 28 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/17/2026X00493694-I1Open ↗
08/13/2026X00493694-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026X00493694-I1—
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/17/2026X00493694-I1Open ↗
08/17/2026X00493694-P2Open ↗
08/13/2026X00493694-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00493694-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/17/2026X00493694-I1Open ↗
08/17/2026X00493694-P2Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00493694-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00493694-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form3
08/17/2026X00493694-I1Open ↗
08/17/2026X00493694-P2Open ↗
08/13/2026X00493694-P1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026X00493694-P2Open ↗
08/17/2026X00493694-I1Open ↗
08/13/2026X00493694-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X00493694-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00498935-S1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00493694-I1Open ↗