← Back
BuildNYC
Walk-up apt, over six families with stores
1752 2ND AVENUE
MANHATTAN · BIN 1050207
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C2-8Zoning
7,535 sfGross Floor Area
10Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 1750-1752 Second Avenue Owner · 2,000 sf lot · 3.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAT&T2p · 2 filings · 18 docs
Floor 5Unit 5N2p · 2 filings · 8 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarAT&T3p · 2 filings · 18 docs
Site & exteriorAT&T6p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1750-1752 Second Avenue1503/22/2026
Amac Holdings803/21/2026
Salon Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Success Best Design211/05/2024
KMB Design Group301/10/2023
Royal T&E101/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Etak SystemsGeneral Contractor303/21/2026
Afu ConstructionGeneral Contractor303/21/2026
Advance Light & PWR ElectricElectrical203/21/2026
LKR ConstructionScaffold203/21/2026
Zerega ContractingPlumbing107/08/2026
Twins ElectricElectrical103/21/2026
Jacobs TelecommunGeneral Contractor107/08/2026
Appo Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513301/10/2023
Building Lifecycle
All (61)Filed (6)Permit Issued (5)Signed Off (4)Violation (20)Inspection (2)Objection (8)Special Inspection (16)
09/24/2025
Signed off — Alteration
AT&T - Replacement of existing telecommunication antennas and RRH units on the roof. Installation of antenna sector and RRH units on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M00404536-I1
01/30/2025
Signed off — Alteration
M01120889-I1
01/30/2025
Signed off — Alteration
PROPOSED DIRECT REPLACEMENT EXISTING FIXTURES WITH NEW AT EXISTING ROUGHING IN APT. 5N. NO EXISTING PLUMBING MODIFICATION TO BE DONE.
M01120922-I1
12/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2024
Permit issued — Plumbing
M01120922-I1-PL
11/21/2024
Permit issued — General Construction
M01120889-I1-GC
11/05/2024
Filed — Alteration
M01120889-I1
11/05/2024
Filed — Alteration
PROPOSED DIRECT REPLACEMENT EXISTING FIXTURES WITH NEW AT EXISTING ROUGHING IN APT. 5N. NO EXISTING PLUMBING MODIFICATION TO BE DONE.
M01120922-I1
10/02/2024
Special inspection requirement — Final
MU YEN
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
MU YEN
09/14/2023
Violation issued (ECB, closed)
Construction
05/30/2023
Signed off — Alteration
Replacement of existing condensing unit on grade. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use, or egress.
M00613247-I1
03/15/2023
Violation issued (HPD, closed)
A
01/23/2023
Special inspection requirement — Mechanical Systems
Ekata Shah
01/23/2023
Special inspection requirement — Final
Ekata Shah
01/23/2023
Special inspection requirement — Air barrier - visual inspection
Ekata Shah
01/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ekata Shah
01/23/2023
Special inspection requirement — Maintenance information
Ekata Shah
01/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ekata Shah
01/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ekata Shah
01/10/2023
Filed — Alteration
Replacement of existing condensing unit on grade. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use, or egress.
M00613247-P1
12/21/2022
Special inspection requirement — Mechanical Systems
Ekata Shah
12/21/2022
Special inspection requirement — Final
Ekata Shah
12/21/2022
Special inspection requirement — Air barrier - visual inspection
Ekata Shah
12/21/2022
Special inspection requirement — Maintenance information
Ekata Shah
12/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ekata Shah
12/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ekata Shah
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ekata Shah
11/03/2022
Violation issued (HPD, closed)
I
02/25/2022
Permit issued — General Construction
M00613247-I1-GC-CX
02/15/2022
Violation issued (HPD, closed)
A
01/28/2022
Objection resolved — Addressed
11/23/2021
Objection raised — Fire_Protection
11/18/2021
Filed — Alteration
Replacement of existing condensing unit on grade. Replacement of existing air handling unit in existing equipment room in cellar. Replacement of related condensate lines. No change to occupancy, use, or egress.
M00613247-I1
04/01/2021
Violation issued (HPD, closed)
A
12/07/2020
Permit issued — Antenna
M00404536-I1-AN
10/29/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
10/29/2020
Objection resolved — Addressed
10/29/2020
Objection raised — 2014-AN BC 1704-Building Code-
10/29/2020
Objection resolved — Addressed
10/29/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/29/2020
Objection resolved — Addressed
10/27/2020
Filed — Alteration
AT&T - Replacement of existing telecommunication antennas and RRH units on the roof. Installation of antenna sector and RRH units on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M00404536-I1
01/19/2018
Permit issued — Sidewalk Shed
M00012278-I1-SH
01/18/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00012278-I1
11/07/2014
Violation issued (HPD, closed)
B
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2011
Violation issued (HPD, closed)
C
07/01/2008
Violation issued (ECB, closed)
Construction
03/03/2005
Violation issued (ECB, closed)
Construction
08/24/2001
Violation issued (HPD, closed)
B
05/18/2001
Violation issued (HPD, closed)
A
05/18/2001
Violation issued (HPD, closed)
B
05/18/2001
Violation issued (HPD, closed)
A
12/15/2000
Violation issued (HPD, closed)
B
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZerega Contracting11/26/2024
DOB NOWGeneral ConstructionSigned-offAfu Construction11/21/2024
DOB NOWGeneral ConstructionSigned-offEtak Systems02/25/2022
DOB NOWAntennaSigned-offArmentum Digital Infrastr12/07/2020
DOB NOWSidewalk ShedPermit IssuedLKR Construction01/19/2018
BISOTISSUEDAmaco Management & Consulting10/06/2017
BISOTISSUEDGallagher O'Connor Development09/08/2017
BISFPISSUEDMaster Fire Systems07/10/2017
BISPLISSUEDS & L Plumbing07/05/2017
BISOTISSUEDJacobs Telecommun07/05/2017
BISOTISSUEDJacobs Telecommun06/30/2017
BISPLISSUEDR.J.C. Mechanical06/29/2017
BISPLISSUEDS & L Plumbing06/27/2017
BISOTISSUEDGallagher O'Connor Development06/22/2017
BISMHISSUEDMaster Fire Mechanical06/22/2017
BISOTISSUEDAmaco Management & Consulting06/06/2017
BISPLISSUEDS & L Plumbing05/01/2017
BISOTISSUEDAmaco Management & Consulting04/11/2017
BISOTISSUEDSkyline Restoration03/29/2017
BISOTISSUEDAmaco Management & Consulting03/29/2017
BISBLISSUEDCalray Gas Heat09/22/2016
BISPLISSUEDCalray Gas Heat09/22/2016
BISBLISSUEDCalray Gas Heat09/03/2015
BISPLISSUEDCalray Gas Heat09/03/2015
BISPLISSUEDAMC Plumbing, Heating & CLNG07/18/2014
BISOTISSUEDCDC Housing07/18/2014
BISOTISSUEDCalray Gas Heat02/13/2014
BISPLISSUEDCalray Gas Heat02/13/2014
BISOTISSUEDCD Housing Construction03/21/2005
BISOTISSUEDSRM Construction and Expediting01/07/2005
BIS—ISSUEDMontana Electric Decor12/08/2004
BISOTISSUEDSM Construction & Contracting09/24/2004
BISFPISSUEDIdeal Fire System02/04/2004
BISOTISSUEDCellular Telephone Co06/13/1995
4 projects · most recent 06/26/2019
General Wiring
FiledStatusContractorScope
06/26/2019Permit IssuedE & M Electrical NY11 meters, 11 new_meters
05/15/2019CompleteE & M Electrical NY11 meters, 11 new_meters
12/07/2018CompleteAppo Electrical ContractorsGeneral Wiring
01/18/2018Permit IssuedMeo Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/02/2024FinalMU YENprogress
10/02/2024Energy Code Compliance InspectionsMU YENprogress
01/23/2023Mechanical SystemsEkata Shahspecial
01/23/2023FinalEkata Shahprogress
01/23/2023Air barrier - visual inspectionEkata Shahenergy_progress
01/23/2023HVAC-R and service water heating equipmentEkata Shahenergy_progress
01/23/2023Maintenance informationEkata Shahenergy_progress
01/23/2023HVAC-R and service water heating system controlsEkata Shahenergy_progress
01/23/2023Fire-Resistant Penetrations and JointsEkata Shahspecial
12/21/2022Mechanical SystemsEkata Shahspecial
12/21/2022FinalEkata Shahprogress
12/21/2022Air barrier - visual inspectionEkata Shahenergy_progress
12/21/2022Maintenance informationEkata Shahenergy_progress
12/21/2022HVAC-R and service water heating system controlsEkata Shahenergy_progress
12/21/2022HVAC-R and service water heating equipmentEkata Shahenergy_progress
12/21/2022Fire-Resistant Penetrations and JointsEkata Shahspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteCellar
Project M00613247 Alteration · LOC Issued · 11/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/06/2026M00012278-I1Request digital key ↗
09/01/2026M00613247-P1Request digital key ↗
08/25/2026M01120889-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00404536-I1Request digital key ↗
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION19
10/10/2017123004989Open ↗
09/12/2017123298387Open ↗
07/21/2017123297164Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION18
03/05/2018140620308Open ↗
09/11/2017140628391Open ↗
09/06/2017140628391Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
03/20/2018140620308Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
08/21/2017123004989Open ↗
06/29/2017123294461Open ↗
06/28/2017123298387Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00012278-I1Open ↗
09/04/2026M00404536-I1Open ↗
09/01/2026M00613247-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M00613247-P1Open ↗
08/28/2026M00613247-P1Open ↗
08/27/2026M01120889-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/21/2017123004989Open ↗
06/28/2017123298387Open ↗
07/31/2014122071961Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00613247-P1Open ↗
08/25/2026M00613247-I1Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
09/11/2017140628391Open ↗
09/06/2017140628391Open ↗
08/21/2017140628391Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
09/26/2014121909122Open ↗
05/27/2014121909122Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
09/26/2014121909122Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/26/2017122944476Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
12/19/2017123297164Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/03/2014121909122Open ↗
▸DOB NOWFDNY: Letter of No Objection1
09/04/2026M00404536-I1Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES7
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan1
09/04/2026M00404536-I1Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
08/21/2017123004989Open ↗
06/29/2017123294461Open ↗
06/01/2017140650926Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00404536-I1Open ↗
09/01/2026M00613247-P1Open ↗
08/25/2026M01120922-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
02/28/2018140650926Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
03/20/2018140620308Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00613247-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
03/20/2018140620308Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
07/17/2017122944476Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
03/20/2018140620308Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM8
05/24/2018140628391Open ↗
05/22/2018140622896Open ↗
03/20/2018140620308Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
08/21/2017123004989Open ↗
06/29/2017123294461Open ↗
06/26/2017123298387Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
09/11/2017140628391Open ↗
08/11/2017140622896Open ↗
08/03/2017123298387Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
06/01/2017140650926Open ↗
04/10/2017140628391Open ↗
03/28/2017140622896Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00012278-I1Open ↗