ECB07/23/2026WORK WITHOUT A PERMIT ATOI I OBSERVED AT THE FRONT EXPOSURE#1 THE ENTIRE LANDING AND STEP REMOVED ALSO THE DRIVEWAY WAS COMPLETELY DIG UP ALL DEBRIS ON TOP THE FRONT LAND, WITHOUT A PERMIT STOP ALL WORK AND MAK$2K due
ECB07/23/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. ATOI I OBSERVED AT FRONT YARD AT EXPOSURE#1 EXCEEDS AMOUNT OF DEBRIS, Q DECKING MATERIAL 2 X 6 WOOD CONCRETE DEBRIS BRICKS COMPOUND BUCKET DU ROCK WASTE MA$2K due
Two family brick · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)