← Back
Office only, 2-6 stories
1756 86 STREET
BROOKLYN · BIN 3329084
💬 Discuss this project
1920Year Built
2Stories
O2Building Class
R5Zoning
11,050 sfGross Floor Area
2Units
6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: AJS GROUP 1756 INC. · 9,666 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction30p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction31p · 2 filings · 20 docs
CellarUnder Construction30p · 2 filings · 20 docs
1 job · most recent 09/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026Permit IssuedACER CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane DHK090 84,000 BTU · Heat Pump Outdoor ×2
DHK120 114,000 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck CUE-95-VG 500 CFM · Exhaust Fan ×2
SQ-80-VG 200 CFM · Exhaust Fan ×1
SQ-95-VG 500 CFM · Exhaust Fan ×1
1 job · most recent 09/08/2026
Sprinkler System
FiledStatusContractorScope
09/08/2026Permit IssuedCROSSFIELD PLBG.&HTG.CORPSprinkler System
2 jobs · most recent 09/08/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
09/08/2026Permit IssuedCROSSFIELD PLBG.&HTGGas, Storm, Water/Sanitary
09/24/2025Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
6 jobs · most recent 09/02/2026
General Wiring
FiledStatusContractorScope
09/02/2026Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
07/24/2026CompleteKWONG MING ELECTRIC INC—
03/17/2026CancelledKJK ELECTRIC INCGeneral Wiring
03/09/2026CompleteKJK ELECTRIC INC—
08/03/2023CompleteCORPORATE ELEC. GROUP INC—
12/20/2018Permit IssuedTHE GOING SERVICING CO IN—
1 job · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedCROSSFIELD PLBG.&HTG.CORP2 scope_items
2 jobs · most recent 09/08/2026
Fence Sidewalk Shed
FiledStatusContractorScope
09/08/2026Permit IssuedCROSSFIELD PLBG.&HTG.CORPFence
07/31/2026——Sidewalk Shed
Building Lifecycle
All (122)Filed (18)Permit Issued (13)Signed Off (4)Violation (27)Inspection (5)Objection (25)Special Inspection (30)
09/11/2026
Permit issued — Sprinklers
B01297775-S5-EW-SP
09/10/2026
Permit issued — Plumbing
B01297775-S4-PL
09/08/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-P7
09/01/2026
Special inspection requirement — Post-installed Anchors
JIAN DENG
09/01/2026
Special inspection requirement — Sprinkler Systems
JIAN DENG
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/25/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-P1
08/13/2026
Special inspection requirement — Interior lighting power
JIAN DENG
08/13/2026
Special inspection requirement — Fenestration areas
JIAN DENG
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/13/2026
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
08/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
08/13/2026
Special inspection requirement — Fenestration air leakage
JIAN DENG
08/13/2026
Special inspection requirement — Insulation placement and R values
JIAN DENG
08/13/2026
Special inspection requirement — Lighting controls
JIAN DENG
08/12/2026
Objection raised — Other
07/31/2026
Filed — Alteration
SUBMIT TEMPORARY SIDEWALK SHED AT OPEN SPACE, IN CONJUNCTION WITH APPLICATION B01297775-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01439594-I1
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2026
Permit issued — Construction Fence
B01297775-S7-FN
05/27/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-S7
05/27/2026
Permit issued — Foundation
B01297775-S2-FO
05/27/2026
Permit issued — General Construction
B01297775-I1-GC
05/21/2026
Permit issued — Structural
B01297775-S1-ST
05/21/2026
Permit issued — Support of Excavation
B01297775-S6-SE
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/06/2026
Objection resolved — Addressed
03/03/2026
Signed off — Alteration
JOB IS FILED TO REMOVE EX. ADVERTISING SIGN TO REMOVE ECB VIOLATION #39133887M. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01315364-I1
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-S1
02/06/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-S2
02/06/2026
Objection raised — Other
02/05/2026
Filed — Alteration CO
Propose modification to existing sprinkler system as per plan filed in conjunction with GC # B01297775-I1.
B01297775-S6
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/26/2026
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
01/26/2026
Special inspection requirement — Subgrade Inspections
JIAN DENG
01/26/2026
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
01/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
01/26/2026
Special inspection requirement — Structural Steel - Welding
JIAN DENG
01/26/2026
Special inspection requirement — Preliminary
JIAN DENG
01/26/2026
Special inspection requirement — Masonry
JIAN DENG
01/26/2026
Special inspection requirement — Structural Steel - Details
JIAN DENG
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ELIAS RASABI
01/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
01/23/2026
Objection raised — Plumbing
01/23/2026
Objection raised — Energy
01/22/2026
Permit issued — General Construction
B01315364-I1-GC
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Energy
01/05/2026
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/19/2025
Objection resolved — Addressed
Latest 60 of 122 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIVERSAL 1683309/21/2026
BAY RIDGE FEDERAL CREDIT UNION2603/22/2026
HOLD RITE NOTIONS CO103/22/2026
VRD CONTRACTING103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2025$8.3M—ISLAND FEDERAL CREDIT UNION → AJS GROUP 1756 INC.$751/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JD ENGINEERING PC409/08/2026
CHI F. LAU ARCHITECT, P.C.808/25/2026
CONSTRCTN. MGNT. & SFTY. CON., INC.107/31/2026
NY BUILDING ASSOCIATES INC111/10/2025
TOHFAZ UDDIN PE PC108/01/2023
NA109/16/2021
LEON SKVIRSKY PE210/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAM BERGMAN CONSTRUCTION AND DEVEL203/21/2026
BMB BUILDING CONSULTING1803/21/2026
AE DESIGN SOLUTION203/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor507/08/2026
NY BUILDING ASSOCIATES INGeneral Contractor207/08/2026
VRD CONTRACTING INCGeneral Contractor203/21/2026
GOING SIGN SVCNGScaffold207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
CROSSFIELD PLBG.&HTGPlumbing109/12/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection109/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397809/08/2026
NKM ENGINEERING PLLC6244311/10/2025
MUNICIPAL TESTING LABORAT230109/16/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP09/11/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG09/10/2026
DOB NOWConstruction FencePermit IssuedACER CONSTRUCTION INC05/28/2026
DOB NOWFoundationPermit IssuedACER CONSTRUCTION INC05/27/2026
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC05/27/2026
DOB NOWStructuralPermit IssuedACER CONSTRUCTION INC05/21/2026
DOB NOWSupport of ExcavationPermit IssuedACER CONSTRUCTION INC05/21/2026
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN01/22/2026
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN11/07/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/07/2025
DOB NOWGeneral ConstructionPermit IssuedVRD CONTRACTING INC05/10/2023
DOB NOWSignSigned-offPOLSINELLI, HENRY10/04/2018
DOB NOWSignSigned-offPOLSINELLI, HENRY10/04/2018
BISPLISSUEDFRANCO BELLI PLMG&HTG SON03/30/2017
BISMHISSUEDSUPERIOR COOLING & HEATIN03/28/2017
BIS—ISSUEDPAUL SIGNS, INC02/28/2013
BISOTISSUEDPAUL SIGNS INC02/28/2013
BISPLISSUEDS. WACHTEL PLBG & HTG INC02/11/2013
BISSPISSUEDDC BUILDING SERVICES INC01/16/2013
BISOTISSUEDADAR STEEL INC12/05/2012
BISPLISSUEDSTARR MECHANICAL CORP12/05/2012
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L07/17/2012
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L07/17/2012
BISEQISSUEDSILVER CUP SCAFFOLDING IN06/29/2012
BISEQISSUEDSILVER CUP SCAFFOLDING IN06/28/2012
BISOTRE-ISSUEDADAR STEEL INC04/18/2012
BIS—ISSUEDADAR STEEL INC03/27/2012
BISEQISSUEDADAR STEEL INC03/12/2012
BISMHISSUEDADAR STEEL INC02/29/2012
BISSPISSUEDJOHN HLAD P & H CO., INC01/24/2012
BISPLISSUEDS. WACHTEL PLBG & HTG INC01/11/2012
BISBLISSUEDS. WACHTEL PLBG & HTG INC01/11/2012
BIS—ISSUEDM & O IRON WORKS INC09/19/2011
BISEQISSUEDM & O IRON WORKS INC09/15/2011
BISMHISSUEDXTRAIRE INC03/01/2005
BISOTISSUEDKORMAN DESIGN & BUILD01/03/2003
BISPLISSUEDRELIABLE PLBG & HTG CORP03/12/2001
BISFBISSUEDEAST COAST MECHANICAL LLC05/23/2000
BISBLISSUEDEAST COAST MECHANICAL LLC04/11/2000
BISPLISSUEDENVIROTECH PLUMBING & HEATING IN08/26/1997
+ 1 more permits on file
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
09/01/2026Post-installed AnchorsJIAN DENGspecial
09/01/2026Sprinkler SystemsJIAN DENGspecial
09/01/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/13/2026Interior lighting powerJIAN DENGenergy_progress
08/13/2026Fenestration areasJIAN DENGenergy_progress
08/13/2026Fire-Resistance Rated ConstructionJIAN DENGprogress
08/13/2026Energy Code Compliance InspectionsJIAN DENGprogress
08/13/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/13/2026Protection of exposed foundation insulationJIAN DENGenergy_progress
08/13/2026Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
08/13/2026Fenestration air leakageJIAN DENGenergy_progress
08/13/2026Insulation placement and R valuesJIAN DENGenergy_progress
08/13/2026Lighting controlsJIAN DENGenergy_progress
01/26/2026Concrete - Cast-In-PlaceJIAN DENGspecial
01/26/2026Subgrade InspectionsJIAN DENGspecial
01/26/2026Concrete - Cast-In-PlaceJIAN DENGspecial
01/26/2026Structural Steel - High Strength BoltingJIAN DENGspecial
01/26/2026Structural Steel - WeldingJIAN DENGspecial
01/26/2026PreliminaryJIAN DENGprogress
01/26/2026MasonryJIAN DENGspecial
01/26/2026Structural Steel - DetailsJIAN DENGspecial
01/26/2026Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
01/26/2026Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
11/07/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/07/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
Latest 25 of 58.
▾Documents — 285 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/02/2026B00078245-I1Request digital key ↗
09/02/2026B00078238-I1Request digital key ↗
09/01/2026B00592708-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION22
04/07/2017321505144Open ↗
04/04/2017321505144Open ↗
04/04/2017321505144Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
01/26/2017321505144Open ↗
11/20/2013320340699Open ↗
06/26/2013320340699Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-I1Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
11/17/2010320240645Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01297775-I1Open ↗
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
05/02/2017321505144Open ↗
01/26/2017321505144Open ↗
07/25/2014320340699Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026B01297775-P5Open ↗
09/23/2026B01297775-P3Open ↗
09/23/2026B01297775-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026B00078245-I1Open ↗
09/02/2026B00078238-I1Open ↗
09/01/2026B00592708-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B01297775-P1Open ↗
09/23/2026B01297775-P5Open ↗
09/23/2026B01297775-P6Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/26/2017321505144Open ↗
02/28/2013320527024Open ↗
02/28/2013320527033Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
02/28/2013320527024Open ↗
02/28/2013320527033Open ↗
06/30/2012320494719Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/26/2017321505144Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE13
01/10/2014320340699Open ↗
01/10/2014320340699Open ↗
09/04/2013320340699Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING6
11/20/2013320340699Open ↗
06/26/2013320340699Open ↗
02/28/2013320340699Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/02/2017321505144Open ↗
05/02/2017321505144Open ↗
01/26/2017321505144Open ↗
Showing 3 of 5 on file for this type
▸BISWATER METER PERMIT : DEP-METER2
06/13/2013320340699Open ↗
06/13/2013320340699Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/26/2017321505144Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/13/2013320340699Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
01/30/2013320340699Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/22/2011320340699Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/19/2026B01297775-P1Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
01/26/2017321505144Open ↗
04/09/2012320451970Open ↗
09/21/2011320240645Open ↗
▸DOB NOWStreet Tree Checklist2
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-I1Open ↗
▸BISTenant Protection Plan and Notes1
01/26/2017321505144Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01297775-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026B00078245-I1Open ↗
09/02/2026B00078238-I1Open ↗
08/19/2026B01297775-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/09/2012320451970Open ↗
07/22/2011320340699Open ↗
11/17/2010320240645Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/26/2017321505144Open ↗
02/28/2013320527033Open ↗
06/30/2012320494719Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/28/2013320527024Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
06/11/2012320486746Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY4
04/12/2012320451970Open ↗
01/07/2012320340699Open ↗
09/21/2011320240645Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/02/2017321505144Open ↗
07/25/2014320340699Open ↗
02/28/2013320527033Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/02/2017321505144Open ↗
07/11/2015320451970Open ↗
07/25/2014320340699Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
12/10/2013320527033Open ↗
06/22/2011320240645Open ↗
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram2
08/19/2026B01297775-S2Open ↗
08/13/2026B01297775-S2Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/18/2011320340699Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/09/2012320451970Open ↗
▸BISSOIL PERCOLATE TEST: SEPTIC RS16-P113-91
06/11/2012320486746Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01297775-S2Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST9
09/30/2014320486746Open ↗
09/16/2014320486746Open ↗
07/31/2014320486746Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
02/28/2013320527024Open ↗
02/28/2013320527033Open ↗
07/02/2012320500169Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
01/09/2013320240645Open ↗
05/17/2011320240645Open ↗
04/25/2011320240645Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
06/22/2011320240645Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
06/13/2013320340699Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/17/2013320340699Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/13/2013320340699Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
05/02/2017321505144Open ↗
01/26/2017321505144Open ↗
08/27/2015320240645Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET8
01/26/2017321505144Open ↗
02/28/2013320527033Open ↗
02/28/2013320527024Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
01/10/2014320240645Open ↗
12/12/2012320240645Open ↗
12/12/2012320240645Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸DOB NOWPlot Diagram4
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-S6Open ↗
08/13/2026B01297775-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026B01297775-P1Open ↗
08/13/2026B01297775-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026B01297775-P1Open ↗
08/19/2026B01297775-I1Open ↗
▸BISPLOT DIAGRAM1
11/17/2010320240645Open ↗
▸DOB NOWAdjoining Owners Notification1
08/19/2026B01297775-S6Open ↗