← Back
Two family frame
1756 ANTHONY AVENUE
BRONX · BIN 2009342
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R7-1Zoning
3,672 sfGross Floor Area
2Units
8 Open Violations 7 unresolved · 1 paperwork only ▸
Two family frame · 2,438 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 817p · 1 filing · 4 docs
Floor 716p · 1 filing · 4 docs
Floor 616p · 1 filing · 4 docs
Floor 516p · 1 filing · 4 docs
Floor 416p · 1 filing · 4 docs
Floor 316p · 1 filing · 4 docs
Floor 2Under Construction18p · 2 filings · 19 docs
Floor 1Under Construction18p · 2 filings · 19 docs
Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEDAJ CONSTRUCTION209/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H & O ENGINEERING, DPC307/01/2026
NIKOLAI KATZ ARCHITECT205/20/2026
ODAYE DESIGN,P.E.,P.C.108/25/2025
PRAMODRAY SHAH, P.E.211/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSS FIVE CONSTRUCTIONGeneral Contractor509/02/2026
TARGET CONSTRUCTION LLCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & O ENGINEERING, DPC5595101/22/2025
Building Lifecycle
All (87)Filed (8)Permit Issued (5)Violation (9)Objection (35)Special Inspection (30)
09/01/2026
Permit issued — Protection and Mechanical Methods
X01102698-S1-PMM
08/06/2026
Objection resolved — Resolved
07/24/2026
Objection raised — Other
07/01/2026
Filed — Full Demolition
Full demolition to a two story building
X01102698-S1
05/29/2026
Violation issued (ECB, open)
Construction
05/28/2026
Objection raised — Other
05/21/2026
Permit issued — Construction Fence
X01203417-I1-FN
05/20/2026
Filed — New Building
DEVELOPMENT HUB JOB, TO BE ASSIGNED TO THE HUB: PROPOSED 8-STORY RESIDENTIAL BUILDING
X01103160-S4
05/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/20/2026
Special inspection requirement — Subgrade Inspections
05/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/20/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
12/15/2025
Permit issued — Full Demolition
X01102698-I1-FD
08/29/2025
Objection resolved — Addressed
08/28/2025
Objection resolved — Addressed
08/28/2025
Objection resolved — Addressed
08/27/2025
Objection raised — Admin
08/27/2025
Objection raised — Structural
08/27/2025
Objection raised — Scope
08/25/2025
Filed — Alteration
Filing herewith reconstruction of existing earth retaining wall that has collapsed due to lateral shift of the embankment as shown on the proposed plan and specifications. to remove violations specified herewith. No change in use egress or occupancy.
X01055732-I1
08/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/18/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
05/21/2025
Permit issued — Construction Fence
X01203417-I1-FN
05/14/2025
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
X01203417-I1
05/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2025
Special inspection requirement — Concrete - Cast-In-Place
04/29/2025
Special inspection requirement — Post-installed Anchors
04/29/2025
Special inspection requirement — Subgrade Inspections
04/29/2025
Special inspection requirement — Structural Steel - Welding
04/29/2025
Special inspection requirement — Structural Steel - Details
04/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/03/2025
Violation issued (ECB, open)
Construction
03/20/2025
Objection resolved — Addressed
02/25/2025
Objection raised — Structural
01/22/2025
Filed — Full Demolition
Full demolition to a two story building
X01102698-I1
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
12/24/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
12/24/2024
Special inspection requirement — Concrete - Cast-In-Place
12/24/2024
Special inspection requirement — Post-installed Anchors
12/24/2024
Special inspection requirement — Subgrade Inspections
12/23/2024
Objection resolved — Addressed
12/23/2024
Objection resolved — Addressed
12/23/2024
Objection resolved — Addressed
12/23/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/03/2024
Permit issued — Structural
X01143734-I1-ST
11/29/2024
Objection raised — Admin
11/29/2024
Objection raised — Structural
11/29/2024
Objection raised — Structural
11/29/2024
Objection raised — Structural
11/29/2024
Objection raised — Other
11/29/2024
Objection raised — Other
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCROSS FIVE CONSTRUCTION09/01/2026
DOB NOWConstruction FencePermit IssuedCROSS FIVE CONSTRUCTION05/21/2026
DOB NOWFull DemolitionPermit IssuedCROSS FIVE CONSTRUCTION12/15/2025
DOB NOWConstruction FencePermit IssuedTARGET CONSTRUCTION LLC05/21/2025
DOB NOWStructuralPermit IssuedTARGET CONSTRUCTION LLC12/03/2024
3 projects · most recent 08/25/2025
Steel Concrete Wood
FiledStatusContractorScope
08/25/2025——Steel, Concrete, Wood
11/18/2024——1 scope_items
11/18/2024Permit IssuedTARGET CONSTRUCTION LLC1 scope_items
1 project · most recent 05/14/2025
Fence
FiledStatusContractorScope
05/14/2025Permit IssuedCROSS FIVE CONSTRUCTIONFence
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
05/20/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/20/2026Subgrade Inspections—special
05/20/2026Excavations - Sheeting, Shoring, and Bracing—special
05/20/2026Construction Operations Influencing Adjacent Structures—special
05/20/2026Subsurface Investigations (Borings/Test Pits)—special
08/18/2025Construction Utilizing CLT or SCL, Type IV—special
04/29/2025Concrete - Cast-In-Place—special
04/29/2025Post-installed Anchors—special
04/29/2025Subgrade Inspections—special
04/29/2025Structural Steel - Welding—special
04/29/2025Structural Steel - Details—special
04/29/2025Structural Stability – Alterations of existing buildings—special
04/29/2025Excavations - Sheeting, Shoring, and Bracing—special
01/21/2025Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
12/24/2024Construction Operations Influencing Adjacent Structures—special
12/24/2024Concrete - Cast-In-Place—special
12/24/2024Post-installed Anchors—special
12/24/2024Subgrade Inspections—special
11/14/2024Final—progress
11/14/2024Footing and Foundation—progress
10/14/2024Electric vehicle service equipment requirements—energy_progress
10/14/2024Protection of exposed foundation insulation—energy_progress
10/14/2024Air barrier — testing —energy_progress
10/14/2024Metering—energy_progress
10/14/2024Electrical motors and elevators—energy_progress
Latest 25 of 40.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026X01142712-I1Request digital key ↗
08/20/2026X01143734-I1Request digital key ↗
08/20/2026X01143734-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026X01143734-I1Open ↗
08/20/2026X01102698-S1Open ↗
08/20/2026X01102698-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026X01102698-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026X01102698-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01102698-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01102698-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01102698-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01102698-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01102698-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026X01055732-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026X01102698-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026X01102698-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01102698-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01102698-I1Open ↗