| Owner | Filings | Most Recent |
|---|---|---|
| EL Amanecer de la Esperanza Ministr | 20 | 09/01/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Kce Consulting Engineering | 4 | 07/07/2026 |
| Peter F. Poon Architect | 3 | 10/02/2025 |
| Gace | 2 | 05/20/2025 |
| NY Building Associates | 1 | 11/27/2024 |
| All City Engineering | 3 | 10/09/2024 |
| Sullivan Group Design | 1 | 09/13/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| American Gotham Consultants | 24 | 03/21/2026 |
| S R Solar Design | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| John Evan Contracting | General Contractor | 4 | 07/08/2026 |
| Paul Toth Excavation | specialty_contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Kce Consulting Engineering | 3712 | 4 | 07/07/2026 |
| A Tech Engineering NYC, P | 6738 | 2 | 05/20/2025 |
| NKM Engineering | 6244 | 1 | 11/27/2024 |
| HRF Services | 5616 | 1 | 02/13/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | John Evan Contracting | 06/01/2026 |
| DOB NOW | Foundation | Permit Issued | John Evan Contracting | 04/30/2026 |
| DOB NOW | Earth Work | Permit Issued | John Evan Contracting | 02/11/2026 |
| DOB NOW | Support of Excavation | Signed-off | Paul Toth Excavation | 02/09/2026 |
| DOB NOW | Curb Cut | Permit Issued | John Evan Contracting | 10/09/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/09/2024 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Aaon MODEL#:RN-010-8-0-E60E-12A 111,310 BTU · Rooftop Unit ×8 Mitsubishi Electric MODEL#:PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1 MODEL#:PURY-HP240TSNU-A 240,000 BTU · Vrf Outdoor ×1 MODEL#:PUZ-A24NHA7 12,000 BTU · Condensing Unit ×1 Ventilation Quest MODEL#:QUEST 335 900 CFM ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2024 | — | — | 152 heads, 5 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2024 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/08/2024 | Cancelled | A.C.M. Electrical Contracting | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2026 | Permit Issued | John Evan Contracting | 2 scope_items |
| 10/21/2025 | Permit Issued | John Evan Contracting | 2 scope_items |
| 05/20/2025 | Permit Issued | John Evan Contracting | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/30/2026 | Subgrade Inspections | Kemba Walcott | special |
| 06/30/2026 | Post-installed Anchors | Kemba Walcott | special |
| 06/30/2026 | Excavations - Sheeting, Shoring, and Bracing | Kemba Walcott | special |
| 06/30/2026 | Concrete - Cast-In-Place | Kemba Walcott | special |
| 06/30/2026 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |
| 06/30/2026 | Underpinning | Kemba Walcott | special |
| 10/16/2025 | Subgrade Inspections | Kemba Walcott | special |
| 10/16/2025 | Structural Steel - High Strength Bolting | — | special |
| 10/16/2025 | Structural Steel - Welding | — | special |
| 10/16/2025 | Structural Steel - Details | — | special |
| 10/16/2025 | Post-installed Anchors | — | special |
| 10/16/2025 | Structural Stability – Alterations of existing buildings | Kemba Walcott | special |
| 10/16/2025 | Concrete - Precast | — | special |
| 10/16/2025 | Excavations - Sheeting, Shoring, and Bracing | Kemba Walcott | special |
| 12/13/2024 | Underpinning | — | special |
| 12/13/2024 | Concrete - Cast-In-Place | — | special |
| 12/13/2024 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 12/13/2024 | Post-installed Anchors | — | special |
| 12/13/2024 | Structural Stability – Alterations of existing buildings | — | special |
| 12/13/2024 | Subgrade Inspections | — | special |
| 11/13/2024 | Final | NARESH MAHANGU | progress |
| 11/13/2024 | Energy Code Compliance Inspections | NARESH MAHANGU | progress |
| 11/13/2024 | Structural Stability – Alterations of existing buildings | NARESH MAHANGU | special |
| 11/13/2024 | Fire-Resistant Penetrations and Joints | NARESH MAHANGU | special |
| 11/08/2024 | Final | Kemba Walcott | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| El Amanecer De LA Esperanza Ministry | Religious | Cellar, Floor 1, Mezzanine, Roof | Project X01128634 Project X01128647 Project X01110542 |