← Back
BuildNYC
Elevator apt, semi-fireproof with stores
1759 WEST FARMS ROAD
BRONX · BIN 2129729
💬 Discuss this project
0Year Built
6Stories
D7Building Class
R7XZoning
42,556 sfGross Floor Area
92Units
Rent Stabilized23 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 1759-63 W. Farms RD · 12,536 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Vaja Group187p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 6178p · 1 filing · 20 docs
Floor 5176p · 1 filing · 20 docs
Floor 4176p · 1 filing · 20 docs
Floor 3178p · 1 filing · 20 docs
Floor 2167p · 1 filing · 20 docs
Floor 11759-63 West Farms Rd LLC171p · 2 filings · 20 docs
Cellar172p · 1 filing · 20 docs
Basement87p · 1 filing · 20 docs
Sub-Basement61p · 1 filing · 20 docs
Site & exteriorThe Vaja Group231p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1759-63 West Farms RD7309/12/2026
Vaja Group2507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/09/2017$3.6M—— → —$85/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leandro Dickson1005/12/2026
Negar Moharrami Gargari509/25/2024
Vasilios Artemiou703/12/2024
FL&M Engineering Design & Inspection611/13/2023
South Bay Engineering103/07/2023
George Cambourakis105/10/2022
Tal Azulay104/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YG Expediting2103/21/2026
Millennium Designs of New York503/21/2026
BAC Developers Group203/21/2026
Millennium Designs503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
City Wide Builders GroupGeneral Contractor907/08/2026
Accurate ElectricalElectrical803/21/2026
Manhattan D EnterprisesScaffold707/08/2026
Accurate ElectricalGeneral Contractor603/22/2026
City Wide Builders GroupScaffold407/08/2026
GWT EnterprisesScaffold307/08/2026
Prime Piping & HeatingFire Protection207/08/2026
Upperclass MaintenanceGeneral Contractor107/08/2026
Upperclass MaintenanceScaffold107/08/2026
Mpi PlumbingPlumbing107/08/2026
Power Direct ElectricElectrical103/22/2026
Power Direct ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681405/12/2026
Regional Testing394105/25/2022
Building Lifecycle
All (166)Filed (30)Permit Issued (19)Signed Off (14)Violation (42)Inspection (15)Objection (16)Special Inspection (30)
09/14/2026
Signed off — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00634103-I1
X00634103-I1
07/09/2026
Violation issued (HPD, open)
C
07/09/2026
Violation issued (HPD, open)
C
07/09/2026
Violation issued (HPD, open)
C
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
05/20/2026
Violation issued (HPD, closed)
C
05/14/2026
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
05/14/2026
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
05/14/2026
Special inspection requirement — Air barrier — testing
Yoichi Chiba
05/14/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/14/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
05/14/2026
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
05/14/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
05/14/2026
Special inspection requirement — Lighting controls
Soorjbally Harilall
05/14/2026
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
05/14/2026
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
05/14/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
05/14/2026
Special inspection requirement — Metering
Soorjbally Harilall
05/14/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
05/14/2026
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
05/14/2026
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
05/12/2026
Filed — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00634103-I1
X00634103-A3
05/05/2026
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
05/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
05/05/2026
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/05/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
05/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
05/05/2026
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
05/05/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
04/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
A
03/10/2026
Violation issued (HPD, closed)
B
02/19/2026
Filed — New Building
Sprinkler & Standpipe work type filed in conjunction with NB application #X00634103-I1
X00634103-A2
01/28/2026
Violation issued (HPD, closed)
A
01/28/2026
Violation issued (HPD, closed)
A
12/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
11/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
B
10/09/2025
Violation issued (HPD, closed)
C
10/09/2025
Violation issued (HPD, closed)
C
10/09/2025
Violation issued (HPD, closed)
C
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
C
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, closed)
B
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCity Wide Builders Group03/28/2024
DOB NOWCurb CutSigned-offCity Wide Builders Group03/07/2024
DOB NOWSprinklersSigned-offAmb Mechanical01/16/2024
DOB NOWStandpipeSigned-offAmb Mechanical01/16/2024
DOB NOWSidewalk ShedSigned-offGWT Enterprises01/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT Enterprises01/09/2024
DOB NOWSupported ScaffoldSigned-offGWT Enterprises01/05/2024
DOB NOWMechanical SystemsSigned-offCity Wide Builders Group12/07/2023
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises10/24/2023
DOB NOWStructuralSigned-offCity Wide Builders Group10/17/2023
DOB NOWGeneral ConstructionPermit IssuedCity Wide Builders Group09/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises09/11/2023
DOB NOWPlumbingSigned-offYG Services09/05/2023
DOB NOWSupport of ExcavationSigned-offCity Wide Builders Group08/08/2023
DOB NOWEarth WorkSigned-offCity Wide Builders Group08/08/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises05/25/2023
DOB NOWConstruction FenceSigned-offCity Wide Builders Group04/04/2023
DOB NOWFoundationSigned-offUpperclass Maintenance05/30/2022
DOB NOWConstruction FenceSigned-offUpperclass Maintenance05/25/2022
BIS—ISSUEDHexagon Industries05/02/2023
BISPLISSUEDThe Plumbing & Heating Specialist11/26/2014
BISOTISSUEDE&J All Seasons Construction11/26/2014
BISOTISSUEDNorth Eastern Fabricators02/08/2000
1 project · most recent 05/12/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2026Signed-offCity Wide Builders GroupAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin 4MXS36RMVJUA 36,000 BTU · Heat Pump Outdoor ×2
3MXS24RMVJUA 24,000 BTU · Heat Pump Outdoor ×1
FTXS18LVJU 18,000 BTU · Heat Pump Outdoor ×1
Heating
Daikin RMX48LVJU 45,500 BTU · Heat Pump Outdoor ×1
Ventilation
Daikin DAIKIN - FXAQ09VJU 9,500 BTU · Vrf Indoor ×1
1 project · most recent 05/12/2026
Sprinkler System
FiledStatusContractorScope
05/12/2026Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Signed-offMpi PlumbingGas, Storm, Water/Sanitary
5 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteAccurate ElectricalGeneral Wiring
10/20/2025CompleteAccurate ElectricalGeneral Wiring
11/27/2023CompletePower Direct Electric—
05/19/2023CompleteSolas Electrical—
05/07/2018CompleteLintech ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/15/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/13/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/13/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/14/2026Exterior lighting powerSoorjbally Harilallenergy_progress
05/14/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
05/14/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
05/14/2026Lighting controlsSoorjbally Harilallenergy_progress
05/14/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
05/14/2026Air barrier — testing Yoichi Chibaenergy_progress
05/14/2026Maintenance informationSoorjbally Harilallenergy_progress
05/14/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
05/14/2026Fenestration air leakageSoorjbally Harilallenergy_progress
05/14/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
05/14/2026MeteringSoorjbally Harilallenergy_progress
05/14/2026Interior lighting powerSoorjbally Harilallenergy_progress
05/14/2026Air barrier continuity plan testingSoorjbally Harilallenergy_progress
05/14/2026Fenestration areasSoorjbally Harilallenergy_progress
05/14/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
05/14/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/14/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/14/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
05/14/2026Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
05/14/2026Subgrade InspectionsSOORJBALLY HARILALLspecial
05/05/2026Fenestration areasSoorjbally Harilallenergy_progress
05/05/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
05/05/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
05/05/2026MeteringSoorjbally Harilallenergy_progress
05/05/2026Maintenance informationSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 265 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/23/2026X00833280-I1Request digital key ↗
08/23/2026X00892637-I1Request digital key ↗
08/23/2026X00892637-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
09/06/2024220483171Open ↗
09/06/2023240329998Open ↗
09/01/2023240329998Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION3
05/05/2023220740580Open ↗
11/28/2014220406996Open ↗
11/28/2014220406996Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/20/2023240329998Open ↗
09/20/2023240329998Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/21/2015220406996Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026X00634103-P7Open ↗
08/16/2026X00634103-A3Open ↗
08/16/2026X00634103-A1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X00634103-I1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/23/2026X00833280-I1Open ↗
08/23/2026X00892637-P1Open ↗
08/23/2026X00892637-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026X00634103-P9Open ↗
09/01/2026X00634103-P9Open ↗
09/01/2026X00634103-P9Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026X00634103-Z4Open ↗
09/01/2026X00634103-P9Open ↗
09/01/2026X00634103-P9Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/14/2015220483171Open ↗
11/26/2014220406996Open ↗
09/23/2014220406996Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/14/2015220483171Open ↗
09/23/2014220406996Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/14/2015220483171Open ↗
09/23/2014220406996Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/03/2022240329998Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/16/2026X00634103-I1Open ↗
08/16/2026X00634103-P9Open ↗
08/16/2026X00634103-A1Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/08/2016220483171Open ↗
09/23/2014220406996Open ↗
▸BISWATER CUT-OFF1
05/05/2023220740580Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
05/05/2023220740580Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
01/13/2015220406996Open ↗
▸BISGAS CUT-OFF1
05/05/2023220740580Open ↗
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist7
08/16/2026X00634103-A3Open ↗
08/16/2026X00634103-A1Open ↗
08/16/2026X00634103-P9Open ↗
Showing 3 of 7 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/05/2023220740580Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
05/05/2023220740580Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/25/2023240329998Open ↗
▸BISSTREET TREE CHECKLIST1
09/20/2023240329998Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/05/2023220740580Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026X00634103-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00634103-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026X00634103-I1Open ↗
▸Environmental & Asbestos41
▸DOB NOWOER: Notice to Proceed21
08/16/2026X00634103-A3Open ↗
08/16/2026X00634103-A1Open ↗
08/16/2026X00634103-P9Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
08/16/2026X00634103-I1Open ↗
08/13/2026X00741972-I1Open ↗
08/13/2026X00741972-I1Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
09/05/2023240329998Open ↗
03/08/2016220483171Open ↗
11/24/2014220406996Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/05/2023220740580Open ↗
10/14/2015220483171Open ↗
▸BISRODENT CONTROL1
05/05/2023220740580Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/14/2015220483171Open ↗
11/26/2014220406996Open ↗
09/23/2014220406996Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00634103-Z2Open ↗
08/13/2026X00634103-S7Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/16/2026X00634103-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X00634103-S2Open ↗
08/13/2026X00634103-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00634103-S1Open ↗
08/13/2026X00634103-S2Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/05/2023220740580Open ↗
05/05/2023220740580Open ↗
05/05/2023220740580Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/07/2025240329998Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/21/2015220406996Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
10/14/2015220483171Open ↗
01/21/2015220406996Open ↗
09/23/2014220406996Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/07/2025240329998Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/05/2023220740580Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
09/15/2021220740580Open ↗
03/08/2016220483171Open ↗
10/14/2015220483171Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
05/05/2023220740580Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/03/2022240329998Open ↗
▸Other Documents33
▸DOB NOWSite Survey: Initial7
08/16/2026X00634103-A3Open ↗
08/16/2026X00634103-A1Open ↗
08/16/2026X00634103-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/16/2026X00634103-A1Open ↗
08/16/2026X00634103-I1Open ↗
08/16/2026X00634103-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/16/2026X00634103-P7Open ↗
08/16/2026X00634103-A3Open ↗
08/16/2026X00634103-A1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
01/07/2025240329998Open ↗
01/07/2025240329998Open ↗
01/07/2025240329998Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00634103-S1Open ↗
08/13/2026X00634103-S2Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
05/05/2023220740580Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/21/2015220406996Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00634103-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00634103-I1Open ↗