← Back
BuildNYC
Two stories - detached, small or mid-size
176-36 SUNBURY ROAD
QUEENS · St. Albans · BIN 4269758
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3AZoning
1,492 sfGross Floor Area
1Units
Rent Stabilized11 Active Violations 10 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,700 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential building rooftop photovoltaic solar panel instal1 filing · 6 docs
CellarSmoke and carbon monoxide detectors5p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Plaza Gardens Real Estate403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2018$550K—PLAZA GARDENS REAL ESTATE CORP. → Private party$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect103/17/2025
NS Engineers405/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Build NYC Safer403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prime Piping & HeatingPlumbing207/08/2026
WCK ElectricElectrical103/22/2026
Build NYC SaferGeneral Contractor107/08/2026
Some ConstructionGeneral Contractor107/28/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854103/17/2025
Building Lifecycle
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
03/17/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01194157-I1
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBuild NYC Safer08/10/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating07/09/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating01/05/2021
BIS—ISSUEDSome Construction07/28/2008
2 projects · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025Permit IssuedBerger Quality Electrical—
08/11/2022Permit IssuedWCK ElectricGeneral Wiring
1 project · most recent 03/17/2025
FiledStatusContractorScope
03/17/2025———
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/27/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/12/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
03/12/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
03/12/2025Energy Code Compliance InspectionsTOM PETERSENprogress
03/12/2025FinalTOM PETERSENprogress
03/12/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
04/01/2021Lighting in dwelling unitsShamsul Siddiqueenergy_progress
38 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account