1940Year Built
2.5Stories
A1Building Class
R1-2Zoning
1,458 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 176-80 80RD LLC · 4,091 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2022$995K—Private party → 176-80 80RD LLC$682/sf building
08/06/2021$710K—— → —$487/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY210/20/2025
J.K.DESIGN506/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor603/21/2026
HIGHLAND PLUMBING LLCPlumbing207/08/2026
RIVERTOWN SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176210/20/2025
TRIANGLE INSPECTION & TES7495506/04/2024
Building Lifecycle
All (57)Filed (7)Permit Issued (5)Signed Off (3)Violation (3)Inspection (5)Objection (4)Special Inspection (30)
10/22/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY
Q01214840-I1
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
10/21/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
10/21/2025
Special inspection requirement — Final
James Clancy
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
10/20/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY
Q01214840-P1
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
10/17/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
10/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
10/17/2025
Special inspection requirement — Final
James Clancy
10/17/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
05/05/2025
Permit issued — Solar
Q01214840-I1-SL
05/01/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY
Q01214840-I1
08/15/2024
Signed off — Alteration
Existing two story one family dwelling to be horizontally enlarged and fully renovated. No change in use egress or occupancy.
Q00722018-I1
08/15/2024
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures, filed in conjunction with ALt II application number Q00722018-I1.
Q08010781-I1
07/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Shutoff dampers
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Structural Wood Frame
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Final
jacob Kanner
07/30/2024
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Footing and Foundation
Rajasekhar Sakhamuri
07/30/2024
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
06/13/2024
Objection raised — Accessibility
06/13/2024
Objection resolved — Addressed
06/04/2024
Filed — Alteration
Existing two story one family dwelling to be horizontally enlarged and fully renovated. No change in use egress or occupancy.
Q00722018-P2
11/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2023
Permit issued — Plumbing
Q08010781-I1-PL
11/03/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures, filed in conjunction with ALt II application number Q00722018-I1.
Q08010781-P1
01/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/29/2022
Permit issued — Structural
Q00722018-I1-GC-CX
11/10/2022
Permit issued — Plumbing
Q08010781-I1-PL
10/18/2022
Objection raised — Accessibility
10/18/2022
Objection resolved — Addressed
10/14/2022
Filed — Alteration
Existing two story one family dwelling to be horizontally enlarged and fully renovated. No change in use egress or occupancy.
Q00722018-P1
09/28/2022
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures, filed in conjunction with ALt II application number Q00722018-I1.
Q08010781-I1
09/19/2022
Violation issued (ECB, closed)
Construction
09/19/2022
Violation issued (ECB, closed)
Construction
06/04/2022
Permit issued — Mechanical Systems
Q00722018-I1-GC-CX
05/10/2022
Filed — Alteration
Existing two story one family dwelling to be horizontally enlarged and fully renovated. No change in use egress or occupancy.
Q00722018-I1
08/12/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offRIVERTOWN SOLAR LLC05/05/2025
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC11/14/2023
DOB NOWStructuralSigned-offYAFE MEOD CORP11/29/2022
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC11/10/2022
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP06/04/2022
2 projects · most recent 03/28/2025
General Wiring Lighting
FiledStatusContractorScope
03/28/2025CompleteAMBER ELECTL CONTNG INC—
06/23/2022CompleteNAS ELECTRIC CORPGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
10/21/2025Air barrier - visual inspectionJames Clancyenergy_progress
10/21/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
10/21/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
10/21/2025FinalJames Clancyprogress
10/21/2025Energy Code Compliance InspectionsJames Clancyprogress
10/17/2025Air barrier - visual inspectionJames Clancyenergy_progress
10/17/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
10/17/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
10/17/2025Energy Code Compliance InspectionsJames Clancyprogress
10/17/2025FinalJames Clancyprogress
07/30/2024Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
07/30/2024Interior lighting powerRajasekhar Sakhamurienergy_progress
07/30/2024Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
07/30/2024Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
07/30/2024Shutoff dampersRajasekhar Sakhamurienergy_progress
07/30/2024Fenestration areasRajasekhar Sakhamurienergy_progress
07/30/2024Subgrade InspectionsRajasekhar Sakhamurispecial
07/30/2024HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
07/30/2024Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
07/30/2024Permanent certificateRajasekhar Sakhamurienergy_progress
07/30/2024Fenestration air leakageRajasekhar Sakhamurienergy_progress
07/30/2024HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
07/30/2024HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
07/30/2024Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
07/30/2024Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
Latest 25 of 62.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q08010781-P1Request digital key ↗
08/25/2026Q08010781-I1Request digital key ↗
08/25/2026Q00722018-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00722018-P2Open ↗
08/13/2026Q00722018-I1Open ↗
08/13/2026Q00722018-P1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature41
09/01/2026Q01214840-I1Open ↗
09/01/2026Q01214840-I1Open ↗
08/30/2026Q08010781-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026Q01214840-I1Open ↗
08/30/2026Q08010781-P1Open ↗
08/30/2026Q08010781-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q08010781-P1Open ↗
08/25/2026Q08010781-I1Open ↗
08/25/2026Q00722018-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q08010781-I1Open ↗
08/25/2026Q08010781-P1Open ↗
08/25/2026Q00722018-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00722018-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00722018-I1Open ↗
08/13/2026Q00722018-P2Open ↗
08/13/2026Q00722018-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00722018-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00722018-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01214840-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026Q00722018-I1Open ↗
08/13/2026Q00722018-P2Open ↗
08/13/2026Q00722018-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00722018-P1Open ↗
08/13/2026Q00722018-I1Open ↗
08/13/2026Q00722018-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00722018-I1Open ↗
08/13/2026Q00722018-P2Open ↗
08/13/2026Q00722018-P1Open ↗