ECB06/01/2006Failure to do adequate housekeeping during demolition operations. A 2 sty wood frame replacing rear wood frame with cmu. Demolition debris at shared area way 175. Brighton 10TH street 20'l x 3'w x 4'h. Which isNothing owed — awaiting certificate of correction
One story - permanent living quarter · 2,400 sf lot · 0.77 FAR built · Flood zone X500
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (1)Violation (1)
06/01/2006
Failure to do adequate housekeeping during demolition operations. A 2 sty wood frame replacing rear wood frame with cmu. Demolition debris at…