← Back
Three families
176 COVERT STREET
BROOKLYN · BIN 3079258
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R6Zoning
2,430 sfGross Floor Area
3Units
Three families · 1,800 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES102/04/2025
Building Lifecycle
All (47)Filed (1)Objection (24)Special Inspection (22)
06/22/2026
Objection raised — Scope
06/21/2026
Objection resolved — Resolved
06/21/2026
Objection resolved — Resolved
06/21/2026
Objection resolved — Resolved
06/21/2026
Objection resolved — Resolved
01/26/2026
Objection resolved — Resolved
01/26/2026
Objection resolved — Resolved
01/26/2026
Objection resolved — Resolved
01/26/2026
Objection resolved — Resolved
01/21/2026
Objection resolved — Resolved
01/21/2026
Objection resolved — Resolved
01/21/2026
Objection resolved — Resolved
08/27/2025
Objection raised — Scope
08/27/2025
Objection raised — Scope
08/27/2025
Objection raised — Scope
08/27/2025
Objection raised — Scope
08/27/2025
Objection raised — Scope
08/27/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Scope
02/04/2025
Filed — Alteration CO
B01127538-I1
11/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
11/26/2024
Special inspection requirement — Subgrade Inspections
10/15/2024
Special inspection requirement — Structural Cold-Formed Steel
10/15/2024
Special inspection requirement — Structural Steel - Details
10/15/2024
Special inspection requirement — Concrete - Cast-In-Place
10/15/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
10/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
10/15/2024
Special inspection requirement — Final
10/15/2024
Special inspection requirement — Footing and Foundation
10/15/2024
Special inspection requirement — Metering
10/15/2024
Special inspection requirement — Air barrier - visual inspection
10/15/2024
Special inspection requirement — Insulation placement and R values
10/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
10/15/2024
Special inspection requirement — Fenestration areas
10/15/2024
Special inspection requirement — Fenestration air leakage
10/15/2024
Special inspection requirement — Interior lighting power
10/15/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
10/15/2024
Special inspection requirement — Protection of exposed foundation insulation
10/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/26/2024Structural Steel - High Strength Bolting—special
11/26/2024Subgrade Inspections—special
10/15/2024Structural Cold-Formed Steel—special
10/15/2024Structural Steel - Details—special
10/15/2024Concrete - Cast-In-Place—special
10/15/2024Excavations - Sheeting, Shoring, and Bracing—special
10/15/2024Fire-Resistant Penetrations and Joints—special
10/15/2024Tenant Protection Plan Compliance—special
10/15/2024Energy Code Compliance Inspections—progress
10/15/2024Fire-Resistance Rated Construction—progress
10/15/2024Final—progress
10/15/2024Footing and Foundation—progress
10/15/2024Metering—energy_progress
10/15/2024Air barrier - visual inspection—energy_progress
10/15/2024Insulation placement and R values—energy_progress
10/15/2024Fenestration and door U-factor and product ratings—energy_progress
10/15/2024Fenestration areas—energy_progress
10/15/2024Fenestration air leakage—energy_progress
10/15/2024Interior lighting power—energy_progress
10/15/2024Subsurface Investigations (Borings/Test Pits)—special
10/15/2024Protection of exposed foundation insulation—energy_progress
10/15/2024Structural Stability – Alterations of existing buildings—special
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01127538-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/23/2026B01127538-I1Open ↗
08/13/2026B01127538-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01127538-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01127538-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01127538-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/23/2026B01127538-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01127538-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B01127538-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01127538-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/23/2026B01127538-I1Open ↗
08/13/2026B01127538-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01127538-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026B01127538-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/23/2026B01127538-I1Open ↗