1926Year Built
3Stories
P5Building Class
R6BZoning
28,200 sfGross Floor Area
1Units
LL97 Covered3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Community center · Owner of record: POLISH & SLAVIC CENTER · 10,000 sf lot · 2.82 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 2 filings · 18 docs
Floor 2Under Construction37p · 3 filings · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction6p · 1 filing · 20 docs
BasementUnder Construction6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PATH ARCHITECTURE PC804/07/2026
SW ENGINEERING COMPANY203/18/2026
KZ ENGINEERING, P.C304/09/2025
EDWARD RACZKOWSKI408/16/2023
ENTHINK ENGINEERS LLC103/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC403/21/2026
BIG ORANGE EXPEDITING603/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
QUICK FILING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CRACOVIA GENERAL CONTRACTGeneral Contractor1107/08/2026
A.M.N. CORPORATIONPlumbing307/08/2026
NEW YORK DISTRIBUTORS HEAGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor304/09/2026
VDK RESTORATION INCGeneral Contractor307/08/2026
JEPOL CONSTRUCTION INCGeneral Contractor204/10/2026
CARPEX INCGeneral Contractor207/23/2026
VICTORIA CONSULTING & DEVGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949404/07/2026
FRANKLIN & OAK, INC.5758203/18/2026
PATH ARCHITECTURE P.C.1567303/05/2026
EDRA ENGINEERING & INSPEC2820408/16/2023
STRUCT. ENGINEERING INTEG4174107/14/2023
Building Lifecycle
All (159)Filed (18)Permit Issued (23)Signed Off (7)Violation (60)Inspection (5)Objection (16)Special Inspection (30)
07/22/2026
Permit issued — Mechanical Systems
B01363326-I1-MS
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/01/2026
Permit issued — General Construction
B08007792-I1-GC
05/11/2026
Special inspection requirement — Lighting controls
CARL HAMANN
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
05/07/2026
Permit issued — General Construction
B08007792-I1-GC
04/28/2026
Permit issued — Mechanical Systems
B01363326-I1-MS
04/16/2026
Permit issued — Plumbing
B01360349-S1-PL
04/08/2026
Permit issued — Structural
B01363326-S1-ST
04/07/2026
Filed — Alteration CO
APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY prior c of o was filed in error - current application showing the proper conditions as cellar, basement, 001 and 2nd floor to match filed PA # 320287346- the building is a 3 story with cellar, bas,1,2 f
B08007792-P3
03/26/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Other
03/18/2026
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM FOR THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01363326-S1
03/06/2026
Permit issued — General Construction
B01360349-I1-GC
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
03/06/2026
Special inspection requirement — Insulation placement and R values
WOJCIECH OKTAWIEC
03/06/2026
Special inspection requirement — Lighting controls
WOJCIECH OKTAWIEC
03/06/2026
Special inspection requirement — Interior lighting power
WOJCIECH OKTAWIEC
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
WOJCIECH OKTAWIEC
03/06/2026
Special inspection requirement — Final
WOJCIECH OKTAWIEC
03/05/2026
Filed — Alteration
APPLICATION TO FILE TO RENOVATE EXISTING 2ND FLOOR OF THE BUILDING. APPLICATION FILED IN CONJUNCTION WITH ALT. 1 NYC DOB JOB#300246570 FOR NEW C Of O. PROPOSED USE: NO CHANGE-ONLY RENOVATIONTO 2ND FLOOR
B01360349-P1
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
WOJCIECH OKTAWIEC
03/03/2026
Special inspection requirement — Insulation placement and R values
WOJCIECH OKTAWIEC
03/03/2026
Special inspection requirement — Interior lighting power
WOJCIECH OKTAWIEC
03/03/2026
Special inspection requirement — Lighting controls
WOJCIECH OKTAWIEC
03/03/2026
Special inspection requirement — Final
WOJCIECH OKTAWIEC
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
03/02/2026
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM FOR THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01363326-I1
02/25/2026
Filed — Alteration
APPLICATION TO FILE TO RENOVATE EXISTING 2ND FLOOR OF THE BUILDING. APPLICATION FILED IN CONJUNCTION WITH ALT. 1 NYC DOB JOB#300246570 FOR NEW C Of O. PROPOSED USE: NO CHANGE-ONLY RENOVATIONTO 2ND FLOOR
B01360349-S1
02/24/2026
Filed — Alteration
APPLICATION TO FILE TO RENOVATE EXISTING 2ND FLOOR OF THE BUILDING. APPLICATION FILED IN CONJUNCTION WITH ALT. 1 NYC DOB JOB#300246570 FOR NEW C Of O. PROPOSED USE: NO CHANGE-ONLY RENOVATIONTO 2ND FLOOR
B01360349-I1
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Kokoszka
02/23/2026
Special inspection requirement — Final
Marco Martini
02/23/2026
Special inspection requirement — Mechanical Systems
Michael Kokoszka
12/04/2025
Permit issued — General Construction
B08007792-I1-GC
11/24/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00924129-I1
11/24/2025
Signed off — Alteration
B01193430-I1
11/14/2025
Filed — Alteration CO
APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY prior c of o was filed in error - current application showing the proper conditions as cellar, basement, 001 and 2nd floor to match filed PA # 320287346- the building is a 3 story with cellar, bas,1,2 f
B08007792-P2
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Signed off — Alteration
B00901822-I1
10/30/2025
Signed off — Alteration
B00849966-I1
10/20/2025
Filed — Alteration CO
APPLICATION FILED TO AMEND CERTIFICATE OF OCCUPANCY prior c of o was filed in error - current application showing the proper conditions as cellar, basement, 001 and 2nd floor to match filed PA # 320287346- the building is a 3 story with cellar, bas,1,2 f
B08007792-P1
08/27/2025
Special inspection requirement — Lighting controls
CARL HAMANN
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
08/27/2025
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
06/03/2025
Permit issued — General Construction
B08007792-I1-GC
05/07/2025
Permit issued — General Construction
B08007792-I1-GC
04/18/2025
Permit issued — General Construction
B08007792-I1-GC
04/09/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00924129-P1
03/25/2025
Permit issued — Sidewalk Shed
B00849966-I1-SH
03/20/2025
Permit issued — Protection and Mechanical Methods
B01193430-I1-PMM
03/19/2025
Filed — Alteration
B01193430-I1
01/30/2025
Permit issued — General Construction
B00901822-I1-GC
01/30/2025
Permit issued — Supported Scaffold
B00924129-I1-SF
01/13/2025
Permit issued — Supported Scaffold
B00924129-I1-SF
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2024
Permit issued — General Construction
B08007792-I1-GC
03/26/2024
Permit issued — Sidewalk Shed
B00849966-I1-SH
11/24/2023
Signed off — Alteration
DIRECT REPLACEMENT OF EXISTING GAS FIRED STEAM BOILER #30000077834N0001 WITH NEW GAS FIRED STEAM BOILER VENTED THRU OUTSIDE AIR FROM EXISTING CHIMNEY, CONNECT TO EXISTING GAS SERVICE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08045417-I1
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCARPEX INC07/22/2026
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT06/01/2026
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT05/07/2026
DOB NOWMechanical SystemsPermit IssuedCARPEX INC04/28/2026
DOB NOWPlumbingPermit IssuedA.M.N. CORPORATION04/16/2026
DOB NOWStructuralPermit IssuedHUDSON MERIDIAN CONST GP04/08/2026
DOB NOWGeneral ConstructionPermit IssuedHUDSON MERIDIAN CONST GP03/06/2026
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT12/04/2025
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT06/03/2025
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT05/07/2025
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT04/18/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offVDK RESTORATION INC03/20/2025
DOB NOWGeneral ConstructionSigned-offVDK RESTORATION INC01/30/2025
DOB NOWSupported ScaffoldSigned-offVDK RESTORATION INC01/30/2025
DOB NOWSupported ScaffoldSigned-offVICTORIA CONSULTING & DEV01/13/2025
DOB NOWGeneral ConstructionPermit IssuedCRACOVIA GENERAL CONTRACT05/29/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/26/2024
DOB NOWSupported ScaffoldSigned-offVICTORIA CONSULTING & DEV08/31/2023
DOB NOWGeneral ConstructionSigned-offNEW YORK DISTRIBUTORS HEA06/16/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/28/2023
DOB NOWBoiler EquipmentSigned-offA.M.N. CORPORATION01/18/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION12/02/2022
BISPLISSUEDA.M.N. CORPORATION09/23/2002
BISOTISSUEDPERFECT RENOVATION09/05/2002
BISFPISSUEDALLIED FIRE CONTROL02/07/2002
BISPLISSUEDSTANLEY LEWIS CONTRACTING04/13/1995
BIS—RE-ISSUEDR.M. GENERAL CONTRACTING06/07/1994
BISPLISSUEDJ JEKOWSKY AND SONS02/17/1994
BISFBISSUEDJ JEKOWSKY AND SONS02/17/1994
BISOTISSUEDRM GENERAL CONTRACTIING CORP03/12/1992
1 project · most recent 03/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2026Permit IssuedCARPEX INCHeating and Air Conditioning Systems
Heat / Cool
Lg ZRNU123SJSA 12,300 BTU · Ahu ×20
ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×4
ZRNU073SJSA 7,500 BTU · Ahu ×2
ZRNU093SJSA 9,600 BTU · Ahu ×2
ZRNU123MAAA 12,300 BTU · Ahu ×2
ZRNU153MAM 15,400 BTU · Vrf Indoor ×2
ZRUM048GSS0 48,000 BTU · Condensing Unit ×2
ZRNU123NAAA 12,000 BTU · Ahu ×1
7 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedALDONA FIRE PROTECTION INGeneral Wiring
11/07/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
03/24/2023CompleteELPO ELECTRICAL CONTG INC—
04/13/2022CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
11/12/2021Permit IssuedECNY ELEC'L CONTR'S, INC—
05/20/2020Permit IssuedNEWBRIDGE ELECTL CONTNG—
08/28/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 03/18/2026
Steel
FiledStatusContractorScope
03/18/2026Permit IssuedCARPEX INCSteel
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/11/2026Lighting controlsCARL HAMANNenergy_progress
05/11/2026Fire-Resistant Penetrations and JointsCARL HAMANNspecial
05/11/2026Energy Code Compliance InspectionsCARL HAMANNprogress
03/06/2026Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
03/06/2026Insulation placement and R valuesWOJCIECH OKTAWIECenergy_progress
03/06/2026Lighting controlsWOJCIECH OKTAWIECenergy_progress
03/06/2026Interior lighting powerWOJCIECH OKTAWIECenergy_progress
03/06/2026Energy Code Compliance InspectionsWOJCIECH OKTAWIECprogress
03/06/2026FinalWOJCIECH OKTAWIECprogress
03/03/2026Energy Code Compliance InspectionsWOJCIECH OKTAWIECprogress
03/03/2026Insulation placement and R valuesWOJCIECH OKTAWIECenergy_progress
03/03/2026Interior lighting powerWOJCIECH OKTAWIECenergy_progress
03/03/2026Lighting controlsWOJCIECH OKTAWIECenergy_progress
03/03/2026FinalWOJCIECH OKTAWIECprogress
03/03/2026Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
02/23/2026Fire-Resistant Penetrations and JointsMichael Kokoszkaspecial
02/23/2026FinalMarco Martiniprogress
02/23/2026Mechanical SystemsMichael Kokoszkaspecial
08/27/2025Lighting controlsCARL HAMANNenergy_progress
08/27/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
08/27/2025Energy Code Compliance InspectionsCARL HAMANNprogress
08/16/2023Fire-Resistant Penetrations and JointsEDWARD RACZKOWSKIspecial
08/16/2023Energy Code Compliance InspectionsEDWARD RACZKOWSKIprogress
08/15/2023Fire-Resistant Penetrations and JointsEDWARD RACZKOWSKIspecial
08/15/2023Energy Code Compliance InspectionsEDWARD RACZKOWSKIprogress
Latest 25 of 31.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/28/2026B08045417-S1Request digital key ↗
08/28/2026B08045420-I1Request digital key ↗
08/28/2026B08045420-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits4
▸BISPLACE OF ASSEMBLY3
03/15/2017320287346Open ↗
10/18/2014320287346Open ↗
03/25/2011320287346Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/02/2017320287346Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026B08045417-S1Open ↗
08/28/2026B08045417-I1Open ↗
08/28/2026B08045420-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/30/2026B08007792-P1Open ↗
09/30/2026B08007792-P1Open ↗
09/28/2026B08045420-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026B08007792-P1Open ↗
09/28/2026B08045420-I1Open ↗
09/23/2026B01363326-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/11/2014320287346Open ↗
07/11/2014320287346Open ↗
03/25/2011320287346Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026B08007792-P3Open ↗
08/13/2026B08007792-P2Open ↗
08/13/2026B08007792-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08045417-S1Open ↗
08/28/2026B08045420-I1Open ↗
08/28/2026B08045420-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026B01363326-S1Open ↗
08/13/2026B00901822-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/11/2014320287346Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08045417-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/22/2026B01193430-I1Open ↗
08/18/2026B01360349-P1Open ↗
08/18/2026B01360349-S1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/11/2014320287346Open ↗
07/11/2014320287346Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/25/2011320287346Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00901822-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/13/2026B08007792-P3Open ↗
08/13/2026B08007792-P1Open ↗
08/13/2026B08007792-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026B01363326-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08007792-I1Open ↗