Converted dwellings or rooming house
176 WAVERLY PLACE
MANHATTAN · BIN 1010672
💬 Discuss this project
1839Year Built
3Stories
C5Building Class
R6Zoning
6,451 sfGross Floor Area
15Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: 1776 WAVERLY, LLC · 2,952 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 19 docs
Floor 4Under Construction61p · 4 filings · 20 docs
Floor 3Under Construction71p · 6 filings · 20 docs
Floor 2Under Construction70p · 6 filings · 20 docs
Floor 1Under Construction70p · 6 filings · 20 docs
CellarUnder Construction84p · 7 filings · 20 docs
Sub-CellarUnder Construction92p · 5 filings · 20 docs
BasementUnder Construction36p · 1 filing · 20 docs
Sub-BasementUnder Construction30p · 5 filings · 20 docs
1 job · most recent 03/30/2023
FiledStatusContractorScope
03/30/2023Permit IssuedNEW ERA MECH SERVICE INC87 heads
2 jobs · most recent 03/30/2023
Water/Sanitary Storm Gas
FiledStatusContractorScope
03/30/2023Permit IssuedNEW ERA MECHANICAL SER INStorm, Water/Sanitary
11/09/2022Permit IssuedNEW ERA MECHANICAL SER INGas, Water/Sanitary
4 jobs · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026Permit IssuedJUMPER ELECTRIC CORPGeneral Wiring
02/15/2026Permit IssuedJUMPER ELECTRIC CORP—
02/28/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
11/07/2022Permit IssuedGLENDALE ELECTL CONTNG IN—
3 jobs · most recent 11/30/2023
Steel
FiledStatusContractorScope
11/30/2023Permit IssuedDUTCHMAN CONTRACTING INC1 scope_items
11/30/2023Permit IssuedDUTCHMAN CONTRACTING INC2 scope_items
03/10/2023Permit IssuedANVA LLCSteel
1 job · most recent 02/03/2025
Scaffold
FiledStatusContractorScope
02/03/2025Permit IssuedBK CONSTRUCTION SVCS INCScaffold
Building Lifecycle
All (197)Filed (26)Permit Issued (51)Signed Off (2)Violation (43)Inspection (11)Objection (34)Special Inspection (30)
08/26/2026
Permit issued — Sidewalk Shed
M01361974-I1-SH
08/11/2026
Filed — Alteration CO
Combine two buildings to one. Change use from multiple dwelling to single family residence
M08036503-P2
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
08/11/2026
Special inspection requirement — Masonry
Max Lee
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
08/11/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Gregory Moormann
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Max Lee
07/29/2026
Permit issued — Plumbing
M00822197-I1-PL
06/30/2026
Permit issued — General Construction
M08036503-I1-GC
06/30/2026
Permit issued — Mechanical Systems
M00822203-I1-MS
06/30/2026
Permit issued — Foundation
M00822152-I1-FO
06/30/2026
Permit issued — Structural
M00823175-I1-ST
06/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/29/2026
Permit issued — Sidewalk Shed
M01361974-I1-SH
05/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2026
Permit issued — Sprinklers
M00822208-I1-EW-SP
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2026
Permit issued — Plumbing
M08021400-S1-PL
03/09/2026
Permit issued — Supported Scaffold
M00833843-I1-SF
03/02/2026
Permit issued — Sidewalk Shed
M01361974-I1-SH
02/27/2026
Permit issued — Construction Fence
M01362503-I1-FN
02/20/2026
Filed — Alteration
M01361974-I1
02/20/2026
Filed — Alteration
M01362503-I1
02/10/2026
Permit issued — General Construction
M08021400-I1-GC
02/09/2026
Permit issued — Foundation
M00822152-I1-FO
02/06/2026
Permit issued — General Construction
M08036503-I1-GC
02/06/2026
Permit issued — Mechanical Systems
M00822203-I1-MS
02/06/2026
Permit issued — Structural
M00823175-I1-ST
01/09/2026
Violation issued (ECB, closed)
Construction
01/09/2026
Violation issued (ECB, closed)
Site Safety
01/09/2026
Violation issued (ECB, closed)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Violation issued (ECB, closed)
Construction
10/22/2025
Violation issued (ECB, closed)
Construction
10/21/2025
Signed off — Alteration
M00833318-S1
10/21/2025
Signed off — Alteration
M00833318-I1
10/09/2025
Permit issued — General Construction
M08021400-I1-GC
07/23/2025
Violation issued (ECB, closed)
Construction
07/23/2025
Violation issued (ECB, closed)
Site Safety
07/16/2025
Permit issued — Support of Excavation
M00822175-I1-SE
06/24/2025
Permit issued — Mechanical Systems
M00822203-I1-MS
06/13/2025
Special inspection requirement — Underpinning
Asma Hashmi
06/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
06/13/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Asma Hashmi
06/12/2025
Permit issued — General Construction
M08036503-I1-GC
06/11/2025
Filed — Alteration
M00822175-P2
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
06/10/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Asma Hashmi
06/10/2025
Special inspection requirement — Underpinning
Asma Hashmi
06/04/2025
Violation issued (HPD, closed)
A
06/03/2025
Violation issued (ECB, closed)
Unknown
06/03/2025
Violation issued (ECB, closed)
Unknown
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Unknown
06/03/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 197 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK CONSTRUCTIONDBA SRT CONSTRUCTION2508/27/2026
ANVA2303/22/2026
1776 WAVERLY LLC C/O TART103/22/2026
176-178 WAVERLY PLACE703/21/2026
176 WAVERLY PLACE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUK DESIGN GROUP LLP408/11/2026
KINGSTON ENGINEERING INC202/20/2026
ANCORA ENGINEERING, PLLC806/11/2025
ASHRAF CORP802/03/2025
RJD ENGINEERING LLC403/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.3003/21/2026
RENNON CONSTRUCTION503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANVA LLCGeneral Contractor2707/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor2008/27/2026
DUTCHMAN CONTRACTING INCGeneral Contractor907/02/2026
BLAZE PLUMBING & HEATINGPlumbing307/08/2026
NEW ERA MECHANICAL SER INPlumbing207/30/2026
NEW ERA MECH SERVICE INCFire Protection107/08/2026
JAN VARJANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANCORA ENGINEERING, PLLC6818508/11/2026
JPC LOGISTICS DBA JPCL EN3511108/11/2026
PROJECT TACTICAL SOLUTION5859708/11/2026
WILLIAM SUK ARCHITECTURE3373111/09/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC08/26/2026
DOB NOWPlumbingPermit IssuedNEW ERA MECHANICAL SER IN07/29/2026
DOB NOWGeneral ConstructionPermit IssuedDUTCHMAN CONTRACTING INC06/30/2026
DOB NOWMechanical SystemsPermit IssuedDUTCHMAN CONTRACTING INC06/30/2026
DOB NOWFoundationPermit IssuedDUTCHMAN CONTRACTING INC06/30/2026
DOB NOWStructuralPermit IssuedDUTCHMAN CONTRACTING INC06/30/2026
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC05/29/2026
DOB NOWSprinklersPermit IssuedNEW ERA MECH SERVICE INC05/12/2026
DOB NOWPlumbingPermit IssuedNEW ERA MECHANICAL SER IN03/18/2026
DOB NOWSupported ScaffoldPermit IssuedBK CONSTRUCTION SVCS INC03/09/2026
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC03/02/2026
DOB NOWConstruction FencePermit IssuedBK CONSTRUCTION SVCS INC02/27/2026
DOB NOWGeneral ConstructionPermit IssuedDUTCHMAN CONTRACTING INC02/10/2026
DOB NOWFoundationPermit IssuedDUTCHMAN CONTRACTING INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedDUTCHMAN CONTRACTING INC02/06/2026
DOB NOWMechanical SystemsPermit IssuedDUTCHMAN CONTRACTING INC02/06/2026
DOB NOWStructuralPermit IssuedDUTCHMAN CONTRACTING INC02/06/2026
DOB NOWGeneral ConstructionPermit IssuedANVA10/09/2025
DOB NOWSupport of ExcavationPermit IssuedANVA07/16/2025
DOB NOWMechanical SystemsPermit IssuedANVA06/24/2025
DOB NOWGeneral ConstructionPermit IssuedANVA06/12/2025
DOB NOWConstruction FenceSigned-offBK CONSTRUCTION SVCS INC04/30/2025
DOB NOWFoundationPermit IssuedANVA04/24/2025
DOB NOWStructuralPermit IssuedANVA04/24/2025
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING04/21/2025
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING04/08/2025
DOB NOWStructuralPermit IssuedANVA04/01/2025
DOB NOWSupported ScaffoldPermit IssuedBK CONSTRUCTION SVCS INC03/12/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC02/18/2025
DOB NOWGeneral ConstructionPermit IssuedANVA10/30/2024
DOB NOWMechanical SystemsPermit IssuedANVA06/25/2024
DOB NOWSupport of ExcavationPermit IssuedANVA06/18/2024
DOB NOWFoundationPermit IssuedANVA05/02/2024
DOB NOWStructuralPermit IssuedANVA05/02/2024
DOB NOWConstruction FenceSigned-offBK CONSTRUCTION SVCS INC04/23/2024
DOB NOWGeneral ConstructionPermit IssuedANVA04/06/2024
DOB NOWStructuralPermit IssuedANVA04/06/2024
DOB NOWSupported ScaffoldPermit IssuedBK CONSTRUCTION SVCS INC03/07/2024
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC02/23/2024
DOB NOWGeneral ConstructionPermit IssuedANVA10/04/2023
+ 16 more permits on file
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/18/2025Fail-Final PL - UndergroundFailView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/11/2026Structural Stability – Alterations of existing buildingsAsma Hashmispecial
08/11/2026MasonryMax Leespecial
08/11/2026Fire-Resistant Penetrations and JointsMax Leespecial
08/11/2026Construction Operations Influencing Adjacent StructuresGregory Moormannspecial
08/11/2026Fire-Resistance Rated ConstructionMax Leeprogress
06/13/2025UnderpinningAsma Hashmispecial
06/13/2025Structural Stability – Alterations of existing buildingsAsma Hashmispecial
06/13/2025Excavations - Sheeting, Shoring, and BracingAsma Hashmispecial
06/10/2025Structural Stability – Alterations of existing buildingsAsma Hashmispecial
06/10/2025Excavations - Sheeting, Shoring, and BracingAsma Hashmispecial
06/10/2025UnderpinningAsma Hashmispecial
12/18/2023Subgrade InspectionsAsma Hashmispecial
12/18/2023FinalAsma Hashmiprogress
12/18/2023Concrete - Cast-In-PlaceAsma Hashmispecial
12/18/2023Footing and FoundationAsma Hashmiprogress
12/14/2023Structural Stability – Alterations of existing buildingsAsma Hashmispecial
12/14/2023Construction Operations Influencing Adjacent StructuresGregory Moormannspecial
12/14/2023FinalMax Leeprogress
11/27/2023Structural Stability – Alterations of existing buildingsAsma Hashmispecial
11/27/2023Excavations - Sheeting, Shoring, and BracingAsma Hashmispecial
11/27/2023UnderpinningAsma Hashmispecial
11/13/2023FinalAsma Hashmiprogress
11/13/2023Concrete - Cast-In-PlaceAsma Hashmispecial
11/13/2023Subgrade InspectionsAsma Hashmispecial
11/13/2023Footing and FoundationAsma Hashmiprogress
Latest 25 of 48.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/01/2026M08021400-I1Request digital key ↗
09/01/2026M08021400-S1Request digital key ↗
09/01/2026M08036503-P2Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits15
▸DOB NOWLPC Approval/Permit13
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P2Open ↗
08/28/2026M00823175-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P2Open ↗
08/13/2026M00822152-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P2Open ↗
08/13/2026M08036503-P1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature29
09/19/2026M00822175-P2Open ↗
09/19/2026M00822175-P2Open ↗
09/19/2026M00822175-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P2Open ↗
09/01/2026M08036503-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M08021400-I1Open ↗
09/01/2026M00823175-I1Open ↗
08/29/2026M08036503-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Safety & Tenant Protection27
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist26
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P2Open ↗
08/28/2026M00823175-I1Open ↗
Showing 3 of 26 on file for this type
▸BISSTREET TREE CHECKLIST1
03/20/2015122267689Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/01/2026M08036503-I1Open ↗
08/28/2026M00822152-I1Open ↗
08/23/2026M00822175-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
03/20/2015122267698Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Inspections & Test Reports5
▸DOB NOWGeotechnical Report (BC 1803.6)5
08/13/2026M00822175-P2Open ↗
08/13/2026M00822175-P1Open ↗
08/13/2026M00822152-P1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
03/20/2015122267689Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/30/2018122267689Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/20/2015122267689Open ↗
03/20/2015122267698Open ↗
▸Other Documents17
▸DOB NOWProof of Historic Building6
09/01/2026M08036503-P2Open ↗
09/01/2026M08036503-I1Open ↗
08/13/2026M00822203-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDHCR Document6
08/28/2026M00823175-I1Open ↗
08/13/2026M00822186-I1Open ↗
08/13/2026M00822208-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
09/01/2026M08036503-I1Open ↗
09/01/2026M08036503-P1Open ↗
09/01/2026M08036503-P2Open ↗
▸BISPLOT DIAGRAM1
03/20/2015122267689Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00822175-I1Open ↗