ECB07/22/2026ATOI OBSERVED SIGN OVER ABOVE PREMISES APPROX 60 SQ FT NO PERMIT ON FILE FOR THIS SIGN. ISSUED NOV WORK WITHOUT A PERMIT, OBTAIN PERMIT$2K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
HPD07/01/2013SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER
HPD05/11/2013§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD05/11/2013§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD05/11/2013§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD05/11/2013§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/12/2012§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONARY BROWNSTONE LINTEL AT BASEMENT AND 1ST STORY AT FRONT WEST
DOB12/06/1989VP-VIOLATION UNSERVED ECB-ACTIVE
ECB12/07/2009WORK WITHOUT A PERMIT ILLEGAL WORK NOTED AT CELLAR LEVEL HAVING EREC TED FULL HEIGHT PARTITIONS TO CREATE SROS+CHANGED LAYOUT WITH ELECTRICSERVICE MOVED.PARTIA AT CELLAR LEVEL STOP ALL WORK EXCEPT TO MAKE SANothing owed — awaiting certificate of correction
ECB02/07/2006B4A/18A/18B/32A/40/44A/48A/48B/50/50A/50B. 50- DEFECTIVE OIL PUMP GAUGE ON BURNER, TO H.P. BOILER. 50A- HOLES IN CEILING & WALLS IN BOILER RM NEEDS TO BE SEALED. 50B- MISSING BACK FLOW PREVENTER ON PRESSURE WATNothing owed — awaiting certificate of correction
ECB04/06/20046(A)/ 50(A)/ 50(C)/ 21(B)/ 50(B)/ FULTON V.T. BOILER, 10 HP, NB 77681, OIL - FIRED, 1996 50 (A) NO DRAFT STAT INSTALLED ON THE FLUE PIPE OF THE OIL - FIRED BOILER 50B(B) MISSING SECONDARY SCREA - TYPE SHUT ONothing owed — awaiting certificate of correction
ECB11/12/1997WORK WITHOUT A PERMIT. WORK NOTED: SEALING BASEMENT WINDOWS & DOOR W/ BRICK AND METAL SHEETING. REINSPECTION OF VIOLATION #101695C09G03. REMEDY: OBTAIN ALL NECESSARY PERMIT.Nothing owed — awaiting certificate of correction
ECB10/16/1995WORK WITHOUT A PERMIT.WORK NOTED:SEALING BASEMENT WINDOWS & DOOR WITH BRICK AND METAL SHEETING.REMEDY:OBTAIN PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB09/27/1995WORK WITHOUT A PERMIT. WORK NOTED: SEALING UP OF BASEMENT WINDOWS AND SECOND MEANS OF EGRESS. CREATING A HAZARDOUS CONDITION. REMEDY: REMEDY: OBTAIN PERMITS AND APPROVALS FROM BUILDING DEPARTMENT OR RESTORE BLDNothing owed — awaiting certificate of correction
ECB06/11/1992WORK WITHOUT PERMIT: SEALING BASEMENT WINDOWS AND SECOND MEANS OF EGNESS (DOOR) WITH BRICK AND METAL SHEETING. REMEDY: OBTAIN PERMIT OF FEASIBLE FROM THIS DEPARTMENT OR RESTORE PREMISES PRIOR CONDITION.Nothing owed — awaiting certificate of correction
ECB03/01/1989WORK WITHOUT A PERMIT SEALING BASEMENT WINDOWS AND EGRESS DOOR WITH BRICKS AND METAL SHEATHING REMEDY OBTAIN PERMITS IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITIONNothing owed — awaiting certificate of correction