← Back
BuildNYC
Three families
1762 NOSTRAND AVENUE
BROOKLYN · BIN 3120024
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
R6Zoning
3,120 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · Owner of record: NST 1762 · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler system installation25p · 2 filings · 20 docs
Floor 3Sprinkler system installation26p · 2 filings · 20 docs
Floor 2Sprinkler system installation23p · 2 filings · 20 docs
Floor 1Unit 1B23p · 2 filings · 20 docs
CellarSprinkler system installation25p · 2 filings · 20 docs
Site & exteriorIncrease in residential floor area16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MZS Realty1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2019$500K—Private party → 1762 NOSTRAND LLC$160/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lester Katz, Ncarb701/06/2026
Pramodray Shah, P.E311/10/2025
Vasilios Artemiou PE108/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpdite Group LLC (104)1103/21/2026
Xpdite Group LLC 104303/21/2026
Xpdite Group 103103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Above Builder GroupGeneral Contractor204/09/2026
Above Builder GroupScaffold107/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616801/06/2026
Building Lifecycle
03/27/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-I1
02/09/2026
Signed off — Alteration
SELF-CERT SPRINKLER APPLICATION FILED HEREWITH FOR PROPOSED SPRINKLER WORK
B01309300-I1
01/21/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-S2
01/21/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-S1
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
80 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAmb Mechanical11/13/2025
DOB NOWConstruction FenceSigned-offAbove Builder Group06/23/2025
DOB NOWMechanical SystemsSigned-offAbove Builder Group05/29/2025
DOB NOWPlumbingSigned-offPrime Piping & Heating05/27/2025
DOB NOWGeneral ConstructionPermit IssuedAbove Builder Group05/23/2025
2 projects · most recent 01/06/2026
Sprinkler System
FiledStatusContractorScope
01/06/2026——Sprinkler System
07/07/2025———
2 projects · most recent 01/06/2026
Water/Sanitary
FiledStatusContractorScope
01/06/2026Signed-offPrime Piping & HeatingWater/Sanitary
07/07/2025——Water/Sanitary
1 project · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026CompleteAmerican Power Electric ConsGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
01/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/09/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/09/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/09/2026Interior lighting powerFAHAD FATEHenergy_progress
01/09/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/09/2026Maintenance informationFAHAD FATEHenergy_progress
01/09/2026Lighting controlsFAHAD FATEHenergy_progress
01/09/2026Fenestration areasFAHAD FATEHenergy_progress
01/09/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/09/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/09/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/09/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/09/2026MeteringFAHAD FATEHenergy_progress
01/09/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/06/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/06/2026Fenestration areasFAHAD FATEHenergy_progress
01/06/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/06/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/06/2026Lighting controlsFAHAD FATEHenergy_progress
01/06/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/06/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/06/2026Interior lighting powerFAHAD FATEHenergy_progress
01/06/2026MeteringFAHAD FATEHenergy_progress
01/06/2026Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 52.
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account