← Back
Over six families without stores
1764 CLAY AVENUE
BRONX · BIN 2009356
💬 Discuss this project
1920Year Built
3Stories
C1Building Class
R7-1Zoning
4,289 sfGross Floor Area
10Units
Rent Stabilized1 Open Violation ▸
Over six families without stores · Owner of record: 1764 CLAY LLC · 2,310 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionGeneral
Roof10p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
1 job · most recent 03/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/12/2025Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXM18AVJU9 18,900 BTU · Split System ×12
3MXM24AVJU9 24,000 BTU · Split System ×4
RXF12AXVJU 13,500 BTU · Split System ×4
1 job · most recent 03/12/2025
Sprinkler System
FiledStatusContractorScope
03/12/2025Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 03/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/12/2025Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
1 job · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
Building Lifecycle
All (151)Filed (9)Permit Issued (4)Signed Off (4)Violation (55)Inspection (9)Objection (40)Special Inspection (30)
01/27/2026
Violation issued (HPD, closed)
C
11/28/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/19/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-I1
04/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-S3
04/03/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-S1
03/19/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-S2
03/14/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/14/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
03/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/14/2025
Special inspection requirement — Final
FAHAD FATEH
03/12/2025
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-P8
03/10/2025
Special inspection requirement — Metering
FAHAD FATEH
03/10/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/10/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/10/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/10/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/10/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/10/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/05/2025
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-P7
03/05/2025
Special inspection requirement — Final
FAHAD FATEH
03/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/05/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/05/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/22/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
01/22/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/17/2025
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-P3
01/17/2025
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-P2
01/17/2025
Objection resolved — Addressed
01/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/27/2024
Objection raised — Other
12/24/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01076180-I1
X01076180-P1
11/22/2024
Violation issued (HPD, closed)
I
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2024
Permit issued — Plumbing
X01076180-S1-PL
10/01/2024
Permit issued — Sprinklers
X01076180-S3-EW-SP
09/30/2024
Permit issued — Mechanical Systems
X01076180-S2-MS
09/27/2024
Permit issued — General Construction
X01076180-I1-GC
09/25/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
Latest 60 of 151 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRONTGATE MANAGEMENT1207/08/2026
PRIME PROPERTY MANAGEMENT307/08/2026
1764 CLAY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2024$1.6M—Private party → 1764 CLAY LLC$361/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XPDITE GROUP LLC703/12/2025
VASILIOS ARTEMIOU PE201/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)903/21/2026
XPDITE GROUP LLC 104403/21/2026
XPDITE GROUP LLC 105103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor307/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616903/12/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC10/01/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC10/01/2024
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP09/30/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP09/27/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/28/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
03/14/2025Mechanical SystemsFAHAD FATEHspecial
03/14/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
03/14/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/14/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/14/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/14/2025FinalFAHAD FATEHprogress
03/10/2025MeteringFAHAD FATEHenergy_progress
03/10/2025Permanent certificateFAHAD FATEHenergy_progress
03/10/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/10/2025Maintenance informationFAHAD FATEHenergy_progress
03/10/2025Interior lighting powerFAHAD FATEHenergy_progress
03/10/2025Fenestration areasFAHAD FATEHenergy_progress
03/10/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/10/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/10/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/10/2025Fenestration air leakageFAHAD FATEHenergy_progress
03/10/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
03/05/2025FinalFAHAD FATEHprogress
03/05/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/05/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
03/05/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/05/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/05/2025Mechanical SystemsFAHAD FATEHspecial
01/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/22/2025Sprinkler SystemsFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026X01076180-S3Request digital key ↗
08/20/2026X01076180-S2Request digital key ↗
08/20/2026X01076180-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01076180-P8Open ↗
08/13/2026X01076180-I1Open ↗
08/13/2026X01076180-P1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026X01076180-P1Open ↗
09/02/2026X01076180-P1Open ↗
09/01/2026X01076180-P8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026X01076180-S3Open ↗
08/20/2026X01076180-S2Open ↗
08/20/2026X01076180-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026X01076180-P1Open ↗
09/01/2026X01076180-P8Open ↗
08/28/2026X01076180-S2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X01076180-P8Open ↗
08/13/2026X01076180-P1Open ↗
08/13/2026X01076180-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026X01076180-S2Open ↗
08/20/2026X01076180-S1Open ↗
08/20/2026X01076180-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/20/2026X01076180-I1Open ↗
08/20/2026X01076180-P8Open ↗
08/20/2026X01076180-P1Open ↗